Upload Button Icon Add office photos

Filter interviews by

IRON TRIANGLE LIMITED (BACK BONE OFFICE) Deputy Project Manager Interview Questions and Answers

Updated 14 Feb 2024

IRON TRIANGLE LIMITED (BACK BONE OFFICE) Deputy Project Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Last company salery how much
  • Q2. Work culture & leave
  • Q3. After selection how many time joining
Round 2 - Technical 

(3 Questions)

  • Q1. Materials density, steel, bbs
  • Q2. Maintain material register & formats
  • Ans. 

    Maintaining a material register involves keeping track of all materials used in a project.

    • Create a register to record details of all materials used

    • Include information such as material type, quantity, and source

    • Update the register regularly to reflect any changes or additions

    • Use standardized formats to ensure consistency and ease of use

    • Examples of formats include spreadsheets, databases, or online tools

  • Answered by AI
  • Q3. Billing work, labour contractor
Round 3 - HR 

(2 Questions)

  • Q1. Salery discussion
  • Q2. Ask date of joining

Interview Preparation Tips

Interview preparation tips for other job seekers - Work knowledge must

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.

I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. I had been interviewed for Project engineer role. The interview was conducted by Two portfolio managers. It was around 1 hour & they had asked related to project management & engineering services.
  • Q2. What is the FEED? What is the flow of work in engineering? What is Hazop & Hazid? SIL? Any clashes u observed in engineering & actual execution? How 3D model is finalised? Various standards for oil & gas ?
  • Ans. 

    FEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.

    • FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.

    • Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.

    • SIL (Safety Integrity Level) is a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Worley Deputy Project Manager interview:
  • Engineering
Interview preparation tips for other job seekers - Interview somehow is not so hard. Asked basic things related to engineering management. Salary negotiation is important. They offer low salaries.

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. How many years of experience?
  • Q2. Total experience about Water Supply Project out of 13years
  • Q3. Do you work in Consultancy firm & ask about of company ?
  • Ans. Yes, like Wapcos Ltd, LN Malviya infra & and described my roll
  • Answered Anonymously
  • Q4. Asked about inspection that how to check quality of work ?
  • Ans. During inspection of work check quality of material like cement, sand, aggregate, bricks, tmt steel bar, etc. as per IS codes/spec. Quality in Struct
  • Answered Anonymously
  • Q5. If contractors not compliance spec. Then what do you want or take action against.
  • Ans. 

    Take appropriate action against contractors not complying with specifications.

    • Identify the specific non-compliance issues

    • Communicate the non-compliance to the contractors

    • Request corrective actions or modifications to meet the specifications

    • Monitor and document the progress of corrective actions

    • Consider penalties or contract termination if non-compliance persists

  • Answered by AI
  • Q6. Asked about NCR full form
  • Ans. Non conformance Report or Non conformity reports
  • Answered Anonymously
  • Q7. Asked describe about NCR
  • Ans. A non-conformance report, non-conformity report or NCR, is a design and construction-related document that addresses issues where there has been a deviation from the project specification or where work fails to meet agreed quality standards
  • Answered Anonymously
  • Q8. Asked about preparation of financial & physical progress
  • Ans. Financial progress is certified amount which is taken from certified RA Bills . Physical progress is in ongoing progress of the project work which is taken from certified RA Bills qty. & running or ongoing qty.
  • Answered Anonymously
  • Q9. What is your CURRENT CTC & expected? Asked by HR.
  • Ans. Replied my ctc & want 30%hike
  • Answered Anonymously
  • Q10. Asked about working location
  • Q11. Asked about corrent CTC & expected
  • Ans. CTC +30%hike.then finally I have selected.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain about really experience which you have got & study about relevant IS codes & technical specifications.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Current working profile
  • Ans. 

    Currently working as a Senior Engineer at XYZ Company, responsible for overseeing project timelines and ensuring quality standards are met.

    • Overseeing project timelines

    • Ensuring quality standards are met

    • Collaborating with team members to troubleshoot issues

    • Providing technical guidance and support to junior engineers

  • Answered by AI
  • Q2. Interest in higher education
  • Ans. 

    I have a strong interest in pursuing higher education to further develop my skills and knowledge in engineering.

    • I believe that continuous learning is essential for professional growth in the engineering field.

    • Higher education can provide me with advanced technical knowledge and expertise.

    • Obtaining a master's degree or PhD can open up opportunities for leadership roles and specialized career paths.

    • I am considering pursu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be informative about what ur currently doing, and current standard
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Family Background
  • Q2. Who is ur father etc…. Locality and all
  • Ans. 

    My father is a retired government official who served in the education department. We live in a peaceful neighborhood in the suburbs.

    • My father is a retired government official

    • He worked in the education department

    • We live in a peaceful neighborhood in the suburbs

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join … No relieveing letter or experience letter after serving notice period …. Wrost company
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Previous Experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
-

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Telephonic Call 

(1 Question)

  • Q1. Roles and Responsibilities
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at MBM Engineering College, Jodhpur and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Normal question related to your branch
  • Q2. About mass transfer,Heat transfer
Round 3 - Interview 

(1 Question)

  • Q1. About my goals and projects

Interview Preparation Tips

Topics to prepare for Saint-Gobain Deputy Manager interview:
  • Mass Transfer
  • Heat Exchangers
  • Fluid Mechanics
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Instrumentation
  • Q2. PLC SCADA

IRON TRIANGLE LIMITED (BACK BONE OFFICE) Interview FAQs

How many rounds are there in IRON TRIANGLE LIMITED (BACK BONE OFFICE) Deputy Project Manager interview?
IRON TRIANGLE LIMITED (BACK BONE OFFICE) interview process usually has 3 rounds. The most common rounds in the IRON TRIANGLE LIMITED (BACK BONE OFFICE) interview process are HR and Technical.
What are the top questions asked in IRON TRIANGLE LIMITED (BACK BONE OFFICE) Deputy Project Manager interview?

Some of the top questions asked at the IRON TRIANGLE LIMITED (BACK BONE OFFICE) Deputy Project Manager interview -

  1. Maintain material register & form...read more
  2. Billing work, labour contrac...read more
  3. Materials density, steel, ...read more

Tell us how to improve this page.

IRON TRIANGLE LIMITED (BACK BONE OFFICE) Deputy Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 252 Interviews
TCE Interview Questions
3.8
 • 244 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
AECOM Interview Questions
4.3
 • 111 Interviews
Worley Interview Questions
4.1
 • 108 Interviews
View all

IRON TRIANGLE LIMITED (BACK BONE OFFICE) Deputy Project Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

4.0

Work-life balance

4.0

Salary

4.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
14 salaries
unlock blur

₹2.5 L/yr - ₹4.5 L/yr

Site Engineer
7 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Civil Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹5.2 L/yr

Senior Engineer
5 salaries
unlock blur

₹3.4 L/yr - ₹6.6 L/yr

Project Manager
5 salaries
unlock blur

₹6 L/yr - ₹8.4 L/yr

Explore more salaries
Compare IRON TRIANGLE LIMITED (BACK BONE OFFICE) with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview