IRON TRIANGLE LIMITED (BACK BONE OFFICE) Quantity Surveyor Interview Questions and Answers

Updated 11 Sep 2021

IRON TRIANGLE LIMITED (BACK BONE OFFICE) Quantity Surveyor Interview Experiences

1 interview found

Quantity Surveyor Interview Questions & Answers

user image Jani Vipul Lalitchandra

posted on 11 Sep 2021

I applied via Referral and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Rate analysis, Quantity Surveyor role and Client requirements.
  • Q2. How will you raise income of company?
  • Ans. 

    To raise income of the company as a Quantity Surveyor, I would focus on cost control, value engineering, and business development.

    • Implement cost control measures to reduce expenses and increase profitability

    • Identify opportunities for value engineering to optimize project costs without compromising quality

    • Develop and maintain strong client relationships to secure repeat business and referrals

    • Explore new markets and expa...

  • Answered by AI
  • Q3. When accident happens whom will you report first.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be normal and try to understand
Atmosphere of the day generally
Atmosphere is your question.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

I applied via Referral and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. How to do Rate analysis ?
  • Ans. 

    Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.

    • Identify the item or activity to be analyzed

    • Determine the quantity of materials and labor required

    • Calculate the cost of materials and labor

    • Add overhead costs and profit margin

    • Divide the total cost by the quantity to get the unit rate

    • Compare the rate with market rates to ensure competitiveness

  • Answered by AI
  • Q2. What are the components to be considered in the Rate analysis?
  • Ans. 

    Components to be considered in Rate analysis

    • Cost of materials

    • Cost of labor

    • Cost of equipment

    • Overhead expenses

    • Profit margin

    • Taxes and duties

    • Transportation costs

    • Wastage and spoilage

    • Contingencies

    • Productivity rates

    • Market rates

    • Inflation rates

  • Answered by AI
  • Q3. Documents required to certify Final bill
  • Ans. 

    The documents required to certify the final bill as a Quantity Surveyor.

    • Contract documents

    • Measurement records

    • Variation orders

    • Payment certificates

    • Final account statement

    • As-built drawings

    • Completion certificates

    • Test reports

    • Subcontractor invoices

    • Material invoices

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Both Technical & Contract knowledge is required. Prepare for the same.

Interview Questionnaire 

9 Questions

  • Q1. What is rolling margin
  • Ans. 

    Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.

    • Rolling margin is used to measure the profitability of a business or project.

    • It helps in assessing the efficiency of operations and identifying areas for cost reduction.

    • The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.

    • For e...

  • Answered by AI
  • Q2. What will you do if the site qty differ from Drawing qty
  • Ans. 

    If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.

    • I will review the drawings and specifications to ensure accuracy.

    • I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.

    • I will conduct a site visit to physically verify the quantities and compare them with the drawings.

    • If there are significant differences, I ...

  • Answered by AI
  • Q3. Tell me about ur self
  • Q4. What is reconciliation of steel
  • Ans. 

    Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.

    • Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.

    • It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...

  • Answered by AI
  • Q5. What is the procedure for BBS
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.

    • BBS is prepared based on the structural drawings and specifications.

    • It includes the diameter, length, shape, and number of reinforcement bars required for the element.

    • BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.

    • It is an essential document for t...

  • Answered by AI
  • Q6. How you do the rate analysis
  • Ans. 

    Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.

    • Rate analysis involves breaking down the cost of each item in a construction project.

    • The cost of materials, labor, and equipment is analyzed to determine the overall cost.

    • Quantities of each item are measured and multiplied by their respective rates to calculate the cost.

    • Rate analysis helps in estimating ...

  • Answered by AI
  • Q7. What is margin for OH & Profits in Rate analysis
  • Ans. 

    Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.

    • Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.

    • It is usually expressed as a percentage of the direct cost.

    • The margin for OH & Profits varies depending on the nature of the project and market conditions.

    • For example, if the direct cost of a proje...

  • Answered by AI
  • Q8. Wastage % for Reinforcement Steel
  • Ans. 

    The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.

    • Wastage percentage for reinforcement steel is typically estimated between 2-5%.

    • Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.

    • Proper planning, accurate cutting, and careful handling can help minimize wastage.

    • Examples of wastage include incorrect cu...

  • Answered by AI
  • Q9. Code for Structural steel and reinforced steel
  • Ans. 

    The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).

    • Structural steel is commonly used in the construction of buildings, bridges, and other structures.

    • The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.

    • Reinforced steel, also known as reba...

  • Answered by AI

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical round - depends on your sector and manager . Else no technical questions. Ready to travel . Married or not . Over...

Interview Preparation Tips

Topics to prepare for TCE Senior Engineer interview:
  • Basic
Interview preparation tips for other job seekers - Check out on going projects of your stream, opportunities to learn and grow , do bit of Market survey with respect to salary, job responsibilities . And main important is your team .
All the best
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. PQC rectification??
Round 2 - Technical 

(1 Question)

  • Q1. BC joint cutting??
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. IS code for BBS
  • Ans. 

    IS code for BBS is IS 1786:2008

    • IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement

    • BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction

    • Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects

  • Answered by AI
  • Q2. Previous project scope and type of project
  • Q3. Tell about previous project scope and rate type of project etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Learnt about IS code for RCC,Prestress concrete and steel
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are your strengths and weaknesses?
Round 3 - Technical 
Round 4 - Technical 
Round 5 - Technical 
Round 6 - One-on-one 

Interview Preparation Tips

Interview preparation tips for other job seekers - Reference not accept

IRON TRIANGLE LIMITED (BACK BONE OFFICE) Interview FAQs

What are the top questions asked in IRON TRIANGLE LIMITED (BACK BONE OFFICE) Quantity Surveyor interview?

Some of the top questions asked at the IRON TRIANGLE LIMITED (BACK BONE OFFICE) Quantity Surveyor interview -

  1. How will you raise income of compan...read more
  2. Rate analysis, Quantity Surveyor role and Client requirement...read more

Tell us how to improve this page.

IRON TRIANGLE LIMITED (BACK BONE OFFICE) Quantity Surveyor Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
14 salaries
unlock blur

₹2.5 L/yr - ₹4.5 L/yr

Site Engineer
7 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Civil Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹5.2 L/yr

Senior Engineer
5 salaries
unlock blur

₹3.4 L/yr - ₹6.6 L/yr

Project Manager
5 salaries
unlock blur

₹6 L/yr - ₹8.4 L/yr

Explore more salaries
Compare IRON TRIANGLE LIMITED (BACK BONE OFFICE) with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview