Filter interviews by
Integrating Power BI involves connecting data sources, transforming data, and creating interactive reports for project controls.
Connect to various data sources like SQL Server, Excel, or cloud services (e.g., Azure).
Use Power Query to clean and transform data for analysis.
Create data models to establish relationships between different datasets.
Design interactive dashboards with visualizations like charts, graphs, ...
Criteria for cube testing include sample preparation, curing, testing age, and acceptance criteria.
Sample preparation involves properly filling the cube mold with concrete and compacting it.
Curing the cubes in a controlled environment for a specified period of time is crucial for accurate results.
Testing age refers to the duration after which the cubes are tested, typically 7 or 28 days.
Acceptance criteria vary ba...
Soil compaction testing involves using specialized equipment to measure the density and moisture content of soil.
Use a soil compaction tester to measure the density of the soil.
Take samples at different depths to ensure accurate results.
Calculate the compaction percentage by comparing the field density to the maximum density.
Check the moisture content of the soil to ensure it is within the acceptable range.
Repeat ...
IR, WR, and CR are abbreviations used in different contexts. IR stands for Infrared, WR stands for Weather Resistant, and CR stands for Compression Ratio.
IR refers to Infrared, which is a type of electromagnetic radiation with longer wavelengths than visible light.
WR is used to indicate that a product or material is designed to withstand various weather conditions.
CR is a term commonly used in engineering and phys...
If battery polarity is inverse with respect to battery charger, it can lead to damage or malfunction.
Inverse polarity can cause short circuits or overheating.
It can damage the battery, charger, or both.
Reverse polarity protection circuits can prevent damage.
Always double-check the polarity before connecting the battery to the charger.
Tests done on power transformers include insulation resistance, turns ratio, winding resistance, and dielectric tests.
Insulation resistance test checks the insulation quality of the transformer.
Turns ratio test measures the ratio of primary to secondary turns.
Winding resistance test determines the resistance of transformer windings.
Dielectric tests assess the dielectric strength and insulation properties of the tr...
There are several types of earthing used in electrical systems.
The most common types of earthing are:
- TN-S system: Separate neutral and protective earth conductors
- TN-C system: Combined neutral and protective earth conductors
- TN-C-S system: Combination of TN-S and TN-C systems
- TT system: Separate earth electrode for each electrical installation
- IT system: No direct connection between earth and neutral
Each typ...
Hipot testing is a process used to verify the insulation integrity of busbars, breakers, cables, and transformers.
Hipot testing involves applying a high voltage to the component being tested.
The purpose is to check for any insulation breakdown or leakage current.
For busbars and cables, the test is typically performed between the conductor and the ground.
For breakers and transformers, the test is performed between ...
I have handled various quality documents such as quality control plans, inspection reports, and non-conformance reports.
Quality control plans
Inspection reports
Non-conformance reports
The hipot test can be done on a cable multiple times depending on the specific requirements and standards.
The number of times a hipot test can be done on a cable depends on the cable's specifications and the testing requirements.
Generally, a hipot test is performed once during the manufacturing process to ensure the cable's insulation integrity.
However, additional hipot tests may be conducted during the cable's li...
I appeared for an interview in May 2025, where I was asked the following questions.
I applied via LinkedIn and was interviewed in Jul 2024. There was 1 interview round.
Soil compaction testing involves using specialized equipment to measure the density and moisture content of soil.
Use a soil compaction tester to measure the density of the soil.
Take samples at different depths to ensure accurate results.
Calculate the compaction percentage by comparing the field density to the maximum density.
Check the moisture content of the soil to ensure it is within the acceptable range.
Repeat the t...
Criteria for cube testing include sample preparation, curing, testing age, and acceptance criteria.
Sample preparation involves properly filling the cube mold with concrete and compacting it.
Curing the cubes in a controlled environment for a specified period of time is crucial for accurate results.
Testing age refers to the duration after which the cubes are tested, typically 7 or 28 days.
Acceptance criteria vary based o...
posted on 9 Apr 2025
I appeared for an interview in Mar 2025, where I was asked the following questions.
I applied via LinkedIn and was interviewed in Jun 2023. There were 2 interview rounds.
The hipot test can be done on a cable multiple times depending on the specific requirements and standards.
The number of times a hipot test can be done on a cable depends on the cable's specifications and the testing requirements.
Generally, a hipot test is performed once during the manufacturing process to ensure the cable's insulation integrity.
However, additional hipot tests may be conducted during the cable's lifespa...
If battery polarity is inverse with respect to battery charger, it can lead to damage or malfunction.
Inverse polarity can cause short circuits or overheating.
It can damage the battery, charger, or both.
Reverse polarity protection circuits can prevent damage.
Always double-check the polarity before connecting the battery to the charger.
There are several types of earthing used in electrical systems.
The most common types of earthing are:
- TN-S system: Separate neutral and protective earth conductors
- TN-C system: Combined neutral and protective earth conductors
- TN-C-S system: Combination of TN-S and TN-C systems
- TT system: Separate earth electrode for each electrical installation
- IT system: No direct connection between earth and neutral
Each type of ...
I have handled various quality documents such as quality control plans, inspection reports, and non-conformance reports.
Quality control plans
Inspection reports
Non-conformance reports
Tests done on power transformers include insulation resistance, turns ratio, winding resistance, and dielectric tests.
Insulation resistance test checks the insulation quality of the transformer.
Turns ratio test measures the ratio of primary to secondary turns.
Winding resistance test determines the resistance of transformer windings.
Dielectric tests assess the dielectric strength and insulation properties of the transfo...
Hipot testing is a process used to verify the insulation integrity of busbars, breakers, cables, and transformers.
Hipot testing involves applying a high voltage to the component being tested.
The purpose is to check for any insulation breakdown or leakage current.
For busbars and cables, the test is typically performed between the conductor and the ground.
For breakers and transformers, the test is performed between diffe...
IR, WR, and CR are abbreviations used in different contexts. IR stands for Infrared, WR stands for Weather Resistant, and CR stands for Compression Ratio.
IR refers to Infrared, which is a type of electromagnetic radiation with longer wavelengths than visible light.
WR is used to indicate that a product or material is designed to withstand various weather conditions.
CR is a term commonly used in engineering and physics t...
Tap changer in a transformer is located on the high voltage winding side to regulate the voltage output.
Tap changer is typically located on the high voltage winding side of a transformer.
It is used to adjust the turns ratio and regulate the voltage output.
If the voltage output in the secondary decreases, the tap changer will be moved to a higher tap position to increase the voltage.
I appeared for an interview before May 2024, where I was asked the following questions.
I have extensive experience in production engineering, focusing on process optimization and quality control in manufacturing environments.
Worked at XYZ Manufacturing for 3 years, improving production efficiency by 20% through lean manufacturing techniques.
Led a team to implement a new quality control system that reduced defects by 15%, enhancing overall product reliability.
Collaborated with cross-functional teams to st...
I am a dedicated Production Engineer with a passion for optimizing processes and enhancing efficiency in manufacturing environments.
Educational Background: I hold a degree in Mechanical Engineering, which provided me with a solid foundation in production principles.
Work Experience: I have 3 years of experience in a manufacturing setting, where I successfully implemented lean manufacturing techniques.
Skills: Proficient ...
I appeared for an interview before Jun 2024, where I was asked the following questions.
Integrating Power BI involves connecting data sources, transforming data, and creating interactive reports for project controls.
Connect to various data sources like SQL Server, Excel, or cloud services (e.g., Azure).
Use Power Query to clean and transform data for analysis.
Create data models to establish relationships between different datasets.
Design interactive dashboards with visualizations like charts, graphs, and m...
I appeared for an interview before May 2024, where I was asked the following questions.
Top trending discussions
Some of the top questions asked at the Irclass Systems And Solutions interview for experienced candidates -
The duration of Irclass Systems And Solutions interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 12 interview experiences
Difficulty level
Duration
based on 240 reviews
Rating in categories
Inspection Engineer
48
salaries
| ₹3 L/yr - ₹7.5 L/yr |
Engineer
45
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Civil Engineer
36
salaries
| ₹2.5 L/yr - ₹7.2 L/yr |
Senior Principal Engineer
34
salaries
| ₹6 L/yr - ₹10 L/yr |
Principal Engineer
28
salaries
| ₹3.8 L/yr - ₹8.1 L/yr |
CMA CGM
Adani Ports and SEZ
Mediterranean Shipping Company
Wartsila