Filter interviews by
I applied via LinkedIn and was interviewed in Jul 2024. There was 1 interview round.
QAP stands for Quality Assurance Plan in manufacturing, outlining procedures and standards to ensure product quality.
QAP is a document that details the quality control procedures, standards, and specifications for a particular product or project.
It includes information on inspection methods, acceptance criteria, testing procedures, and corrective actions.
QAP helps ensure that products meet the required quality standard...
WPS/PQR/WPQ are documents used in welding to ensure quality and compliance with standards.
WPS stands for Welding Procedure Specification, detailing the welding process to be used
PQR stands for Procedure Qualification Record, documenting the testing and results of a specific welding procedure
WPQ stands for Welder Performance Qualification, certifying the welder's ability to perform the specified welding procedure
These d...
Irclass Systems And Solutions interview questions for popular designations
The role of work done in previous jobs is to showcase relevant experience, skills, and accomplishments to demonstrate capability for the new role.
Demonstrating relevant experience and skills acquired in previous roles
Showcasing accomplishments and successes to highlight capabilities
Providing examples of how previous work aligns with the requirements of the new role
I am a dedicated and experienced Project Engineer with a strong background in managing engineering projects from conception to completion.
Bachelor's degree in Engineering
5+ years of experience in project management
Proficient in project scheduling and budgeting
Strong communication and leadership skills
Experience working with cross-functional teams
I applied via LinkedIn and was interviewed in Jun 2023. There were 2 interview rounds.
The hipot test can be done on a cable multiple times depending on the specific requirements and standards.
The number of times a hipot test can be done on a cable depends on the cable's specifications and the testing requirements.
Generally, a hipot test is performed once during the manufacturing process to ensure the cable's insulation integrity.
However, additional hipot tests may be conducted during the cable's lifespa...
If battery polarity is inverse with respect to battery charger, it can lead to damage or malfunction.
Inverse polarity can cause short circuits or overheating.
It can damage the battery, charger, or both.
Reverse polarity protection circuits can prevent damage.
Always double-check the polarity before connecting the battery to the charger.
There are several types of earthing used in electrical systems.
The most common types of earthing are:
- TN-S system: Separate neutral and protective earth conductors
- TN-C system: Combined neutral and protective earth conductors
- TN-C-S system: Combination of TN-S and TN-C systems
- TT system: Separate earth electrode for each electrical installation
- IT system: No direct connection between earth and neutral
Each type of ...
I have handled various quality documents such as quality control plans, inspection reports, and non-conformance reports.
Quality control plans
Inspection reports
Non-conformance reports
Tests done on power transformers include insulation resistance, turns ratio, winding resistance, and dielectric tests.
Insulation resistance test checks the insulation quality of the transformer.
Turns ratio test measures the ratio of primary to secondary turns.
Winding resistance test determines the resistance of transformer windings.
Dielectric tests assess the dielectric strength and insulation properties of the transfo...
Hipot testing is a process used to verify the insulation integrity of busbars, breakers, cables, and transformers.
Hipot testing involves applying a high voltage to the component being tested.
The purpose is to check for any insulation breakdown or leakage current.
For busbars and cables, the test is typically performed between the conductor and the ground.
For breakers and transformers, the test is performed between diffe...
IR, WR, and CR are abbreviations used in different contexts. IR stands for Infrared, WR stands for Weather Resistant, and CR stands for Compression Ratio.
IR refers to Infrared, which is a type of electromagnetic radiation with longer wavelengths than visible light.
WR is used to indicate that a product or material is designed to withstand various weather conditions.
CR is a term commonly used in engineering and physics t...
Tap changer in a transformer is located on the high voltage winding side to regulate the voltage output.
Tap changer is typically located on the high voltage winding side of a transformer.
It is used to adjust the turns ratio and regulate the voltage output.
If the voltage output in the secondary decreases, the tap changer will be moved to a higher tap position to increase the voltage.
Top trending discussions
Some of the top questions asked at the Irclass Systems And Solutions interview -
The duration of Irclass Systems And Solutions interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 23 interviews
Interview experience
based on 195 reviews
Rating in categories
Jaipur,
Vadodara
5-10 Yrs
Not Disclosed
Surat,
Vadodara
+15-10 Yrs
Not Disclosed
Inspection Engineer
49
salaries
| ₹2.4 L/yr - ₹7.2 L/yr |
Civil Engineer
36
salaries
| ₹2.5 L/yr - ₹7.2 L/yr |
Engineer
33
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Senior Principal Engineer
27
salaries
| ₹7 L/yr - ₹9.5 L/yr |
Quality Engineer
22
salaries
| ₹2.7 L/yr - ₹6.6 L/yr |
Bureau Veritas
DNV GL - Business Assurance India
TÜV NORD
Intertek