Filter interviews by
I applied via Job Fair and was interviewed in Mar 2022. There were 2 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.
Total station errors can affect GPS to GPS measurements due to various factors.
Total station errors can include instrument calibration errors, atmospheric conditions, and human error.
Examples of total station errors affecting GPS to GPS measurements include incorrect leveling of the total station, improper target placement, and misalignment of the instrument.
Regular calibration and maintenance of the total station can
posted on 18 Sep 2024
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
posted on 12 May 2024
I applied via Approached by Company
Yes, code is a mode of measurement used in quantity surveying.
Code is a standardized system of measurement used in quantity surveying to quantify and describe construction works.
It helps in accurately estimating the quantities of materials and labor required for a project.
Examples of codes used in quantity surveying include SMM7 (Standard Method of Measurement) and CESMM4 (Civil Engineering Standard Method of Measureme
posted on 8 May 2024
I applied via Newspaper Ad and was interviewed in Nov 2023. There was 1 interview round.
I applied via Referral and was interviewed in Apr 2024. There were 3 interview rounds.
Alphabet, numerical, numbers,Genral awareness,etc
Alphabet,time,calender,train,etc
Missing alphabet, missing number,
Calculate a level sheet, how to prepare a level greed sheet for highway
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There was 1 interview round.
based on 1 review
Rating in categories
Executive Accountant
32
salaries
| ₹2.4 L/yr - ₹4.7 L/yr |
Highway Engineer
28
salaries
| ₹4 L/yr - ₹9.8 L/yr |
Structural Engineer
26
salaries
| ₹2.4 L/yr - ₹9.4 L/yr |
Senior Accounts Executive
26
salaries
| ₹2.8 L/yr - ₹6.1 L/yr |
Supervisor
20
salaries
| ₹1.2 L/yr - ₹4 L/yr |
Larsen & Toubro Limited
GMR Group
Hindustan Construction Company
Reliance Infrastructure