Upload Button Icon Add office photos

Filter interviews by

IRB Infrastructure Survey Manager Interview Questions and Answers

Updated 4 Apr 2022

IRB Infrastructure Survey Manager Interview Experiences

1 interview found

I applied via Job Fair and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Why are you looking for a change?
Round 2 - HR 

(3 Questions)

  • Q1. Share details of your previous job.
  • Q2. What are your salary expectations?
  • Q3. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - SURVEY MANAGER /EXECUTIVE SURVEYOR / Sr. SURVEYOR

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Scanner and software
  • Q2. Auto cad, surpac
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Total station error distribution in GPS to GPS
  • Ans. 

    Total station errors can affect GPS to GPS measurements due to various factors.

    • Total station errors can include instrument calibration errors, atmospheric conditions, and human error.

    • Examples of total station errors affecting GPS to GPS measurements include incorrect leveling of the total station, improper target placement, and misalignment of the instrument.

    • Regular calibration and maintenance of the total station can

  • Answered by AI
  • Q2. Coordinates kaise nikalte hai CAD se
  • Q3. Auto level arre distribution
Round 3 - HR 

(2 Questions)

  • Q1. Selery discussion
  • Q2. Which company working

Interview Preparation Tips

Interview preparation tips for other job seekers - Best company working
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
No response

I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Degital auto level questions
  • Q2. Estimate and costing
  • Q3. Cube test related questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About experience, current salary, expected salary and notice period
Round 2 - Technical 

(1 Question)

  • Q1. About technical knowledge of current designation
Round 3 - One-on-one 

(1 Question)

  • Q1. About technical knowledge currently project

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go with extraordinary, reply to interviewer what you actually know
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(1 Question)

  • Q1. Is code for the mode of measurement?
  • Ans. 

    Yes, code is a mode of measurement used in quantity surveying.

    • Code is a standardized system of measurement used in quantity surveying to quantify and describe construction works.

    • It helps in accurately estimating the quantities of materials and labor required for a project.

    • Examples of codes used in quantity surveying include SMM7 (Standard Method of Measurement) and CESMM4 (Civil Engineering Standard Method of Measureme

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. 1. BBS process 1. Subcontractor billing 2. Claim Estimation 4.Material reconciliation
  • Q2. Answer as per the question
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Alphabet, numerical, numbers,Genral awareness,etc

Round 2 - Aptitude Test 

Alphabet,time,calender,train,etc

Round 3 - Coding Test 

Missing alphabet, missing number,

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Calculate a level sheet, how to prepare a level greed sheet for highway

Interview Preparation Tips

Interview preparation tips for other job seekers - Flow in level calculation
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Route survey, Details survey etc.
  • Q2. Salary discussions

Interview Preparation Tips

Topics to prepare for L&T Construction Surveyor interview:
  • Field Survey

IRB Infrastructure Interview FAQs

How many rounds are there in IRB Infrastructure Survey Manager interview?
IRB Infrastructure interview process usually has 2 rounds. The most common rounds in the IRB Infrastructure interview process are HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 712 Interviews
Tata Projects Interview Questions
4.2
 • 412 Interviews
KEC International Interview Questions
4.1
 • 288 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
Dilip Buildcon Interview Questions
4.0
 • 139 Interviews
G R Infraprojects Interview Questions
4.1
 • 130 Interviews
View all

IRB Infrastructure Survey Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

4.0

Salary

5.0

Job security

4.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Executive Accountant
32 salaries
unlock blur

₹2.4 L/yr - ₹4.7 L/yr

Highway Engineer
28 salaries
unlock blur

₹4 L/yr - ₹9.8 L/yr

Structural Engineer
26 salaries
unlock blur

₹2.4 L/yr - ₹9.4 L/yr

Senior Accounts Executive
26 salaries
unlock blur

₹2.8 L/yr - ₹6.1 L/yr

Supervisor
20 salaries
unlock blur

₹1.2 L/yr - ₹4 L/yr

Explore more salaries
Compare IRB Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview