Upload Button Icon Add office photos

Filter interviews by

Intercontinental Consultants & Technocrats Senior Bim Coordinator Interview Questions and Answers

Updated 6 Nov 2019

Intercontinental Consultants & Technocrats Senior Bim Coordinator Interview Experiences

1 interview found

Interview Questionnaire 

2 Questions

  • Q1. Do you know 4d and 5d?
  • Ans. 

    Yes, 4D refers to time-based scheduling and 5D refers to cost estimation in BIM.

    • 4D BIM involves adding a time dimension to the 3D model to create a construction schedule.

    • 5D BIM adds cost information to the 4D model, allowing for more accurate cost estimation.

    • Both 4D and 5D BIM are important tools for project planning and management.

    • Examples of software that support 4D and 5D BIM include Navisworks, Synchro, and Vico Of

  • Answered by AI
  • Q2. Are you able manage client interview

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Complete process of functionality of treatment plant
  • Ans. 

    The functionality of a treatment plant involves multiple steps to treat wastewater and make it safe for disposal or reuse.

    • 1. Collection of wastewater from various sources

    • 2. Screening to remove large objects and debris

    • 3. Primary treatment to separate solids from liquids

    • 4. Secondary treatment to remove organic matter and pathogens

    • 5. Tertiary treatment for further purification

    • 6. Disinfection to kill remaining bacteria and...

  • Answered by AI
  • Q2. What are the basic process of inspection for JJM sites
  • Ans. 

    The basic process of inspection for JJM sites involves site visits, documentation review, and compliance verification.

    • Site visits to physically inspect the location and facilities

    • Review of documentation such as permits, licenses, and safety records

    • Verification of compliance with regulations and standards

    • Reporting findings and recommending corrective actions if necessary

  • Answered by AI
  • Q3. Is code related questions
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. General technical questions
Round 3 - HR 

(1 Question)

  • Q1. Behavioural test

I applied via Company Website and was interviewed in May 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

All technical and discuss and all typ. Of project discuss

Round 3 - One-on-one 

(1 Question)

  • Q1. Final hod discussion and technical discuss
Round 4 - HR 

(1 Question)

  • Q1. Ctc discussion and documents sumit

Interview Preparation Tips

Interview preparation tips for other job seekers - All projects and previss company details discussion

I was interviewed in Feb 2022.

Round 1 - Technical 

(1 Question)

  • Q1. Your basic details about your self and your experience
Round 2 - HR 

(1 Question)

  • Q1. Current salary, experience, notice period, negotiation (very hard)

Interview Preparation Tips

Interview preparation tips for other job seekers - There is nothing special. Just prepare basic things in your area.

Interview Questionnaire 

1 Question

  • Q1. About your pervious project details and work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepair all Technical and work details.

I applied via Company Website and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. How wil you synchronise the DGs??
  • Ans. 

    Synchronizing DGs involves coordinating their activities and ensuring they work together efficiently.

    • Create a detailed project plan outlining the tasks and timelines for each DG

    • Establish regular communication channels to share updates and resolve any conflicts

    • Implement a centralized system for tracking progress and identifying dependencies

    • Conduct regular meetings to discuss challenges, provide guidance, and align effor...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview should be conducted with fully technical questions.

I applied via Campus Placement and was interviewed before Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical and non technical questions were asked better be prepared to face questions in transmission and distribution sector.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest share what you know don't fake as HR people are smart enough to figure out best candidates.

Interview Questionnaire 

3 Questions

  • Q1. The interviewer was very specific and asked related question. i was also prepared for the same and handled it very smartly. I did not face any difficulty while facing the interview with Director and that w...
  • Q2. Exactly dont remember but of course the common question- why we should hire you boss ?
  • Q3. Any question form our side ?

Tell us how to improve this page.

Interview Questions from Similar Companies

TCE Interview Questions
3.8
 • 244 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
AECOM Interview Questions
4.3
 • 111 Interviews
Bechtel Interview Questions
4.0
 • 66 Interviews
Samsung E&A Interview Questions
4.1
 • 59 Interviews
View all
Assistant Manager
57 salaries
unlock blur

₹2.4 L/yr - ₹5.9 L/yr

Deputy Manager
57 salaries
unlock blur

₹4.4 L/yr - ₹10.5 L/yr

Assistant Highway Engineer
36 salaries
unlock blur

₹3.6 L/yr - ₹6.1 L/yr

Manager
35 salaries
unlock blur

₹6.2 L/yr - ₹10.8 L/yr

Highway Design Engineer
30 salaries
unlock blur

₹4.2 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Intercontinental Consultants & Technocrats with

Feedback Infrastructure Services

3.5
Compare

Mecon

3.9
Compare

TCE

3.8
Compare

Aarvee Associates

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview