Filter interviews by
Geologists are hired for tunnel construction to assess the geological conditions of the site, identify potential risks, and recommend suitable construction methods.
Assess geological conditions of the site to determine rock type, stability, and potential hazards
Identify potential risks such as rock falls, water ingress, or ground instability
Recommend suitable construction methods based on geological findings, such as tu...
In my previous job, I was responsible for conducting geological surveys, analyzing data, and providing recommendations for mining operations.
Conducting geological surveys to identify potential mining sites
Analyzing data collected from surveys to determine mineral composition and quality
Providing recommendations for mining operations based on geological findings
Collaborating with engineers and other team members to ensu
Top trending discussions
I applied via Campus Placement and was interviewed before Jan 2020. There were 5 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
It was just a aptitude test
Managed a team to implement a new customer relationship management system
Led a team of 5 employees to successfully implement a new CRM system
Coordinated with IT department to ensure smooth integration of the system
Provided training to staff on how to use the new system effectively
I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.
Strong reputation in the industry
Opportunities for career growth and development
Alignment with my career goals and values
posted on 15 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Minor bridges are usually shorter and have a lower weight capacity than major bridges.
Major bridges are typically longer and have a higher weight capacity than minor bridges.
Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.
Major bridges may require more maintenance and have a higher construction cost than minor bridges.
Examples of major bridges i...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Company Website
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Highway Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Highway Design Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Feedback Infrastructure Services
Mecon
TCE
Aarvee Associates