Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 3 interview rounds.
Answering questions related to setting cooling time for parts, calculating OEE, molding defects, and quality systems.
To set cooling time for parts, factors like material type, part geometry, and mold temperature need to be considered.
OEE (Overall Equipment Efficiency) is calculated by multiplying Availability, Performance, and Quality.
Molding defects can include issues like flash, sink marks, warping, and short shots.
T...
I am committed to working with your company for the long term.
I am dedicated to building a successful career with your organization.
I plan to contribute my skills and expertise to help the company grow.
I am excited about the opportunities for growth and development within the company.
I am looking forward to being a valuable member of the team for many years to come.
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 4 interview rounds.
Handling shift
Top trending discussions
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
Assembly BIW production process involves various parameters to ensure weld quality.
Ensure proper fit-up of components before welding
Maintain correct welding parameters such as voltage, current, and travel speed
Use appropriate shielding gas and welding consumables
Regularly inspect and maintain welding equipment
Implement quality control measures such as visual inspection and non-destructive testing
posted on 20 Apr 2024
I applied via LinkedIn and was interviewed before Oct 2023. There was 1 interview round.
Successfully implemented a new production process resulting in a 20% increase in efficiency.
Identified areas for improvement in the production process
Developed and implemented a new process
Trained staff on the new process
Monitored and analyzed results to ensure success
One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.
I tend to be a perfectionist and can spend too much time on minor details.
I sometimes struggle with delegating tasks because I want to ensure they are done correctly.
I can be overly self-critical, which can impact my confidence at times.
posted on 13 Apr 2022
I applied via Referral and was interviewed in Mar 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Oct 2022. There were 4 interview rounds.
CC in engine refers to the engine displacement, which is the total volume of all the cylinders in an engine.
CC stands for cubic centimeters
It is a unit of measurement for engine displacement
Higher CC generally means more power and torque
For example, a 2.0L engine has a displacement of 2000cc
CC in engine refers to the engine displacement, which is the total volume of all the cylinders in an engine.
CC stands for cubic centimeters
It is a unit of measurement used to describe the total volume of all the cylinders in an engine
Engine displacement is an important factor in determining the power and performance of a vehicle
I applied via Company Website and was interviewed in Jun 2022. There was 1 interview round.
posted on 12 Aug 2021
I applied via Company Website and was interviewed before Aug 2020. There were 4 interview rounds.
Major problems in any production plant include equipment breakdowns, supply chain disruptions, quality control issues, and workforce management challenges.
Equipment breakdowns: Regular maintenance and proactive monitoring can help prevent breakdowns. Having backup equipment or spare parts can minimize downtime.
Supply chain disruptions: Building strong relationships with suppliers, having alternative suppliers, and impl...
Assess the reasons for not achieving the target and create a plan to catch up.
Analyze the production process to identify bottlenecks or inefficiencies
Determine if there were any unexpected issues or delays that impacted production
Develop a plan to increase productivity and catch up on missed targets
Communicate the plan to relevant stakeholders and ensure everyone is on board
Monitor progress closely and make adjustments
The most important aspect is quality as it ensures customer satisfaction and brand reputation. The least important is maintenance as it can be outsourced or automated.
Quality is crucial as it directly impacts customer satisfaction and brand reputation.
Maintaining high quality standards ensures repeat business and positive word-of-mouth.
Quality control measures should be implemented throughout the production process.
Mai...
Inefficiency
Lack of streamlined processes
Poor communication between departments
Inadequate training of employees
Obsolete technology or equipment
High levels of waste or defects
Low productivity or output
Long lead times or delays
High costs or expenses
Low morale or motivation among employees
based on 1 interview
Interview experience
based on 30 reviews
Rating in categories
Engineer
216
salaries
| ₹2 L/yr - ₹7.2 L/yr |
Specialist
204
salaries
| ₹3 L/yr - ₹9.2 L/yr |
Group Leader
181
salaries
| ₹4.4 L/yr - ₹11.7 L/yr |
Production Engineer
159
salaries
| ₹1.5 L/yr - ₹7.2 L/yr |
Quality Engineer
152
salaries
| ₹1.3 L/yr - ₹8 L/yr |
Bharat Forge
TVS Sundram Fasteners
Rane (Madras)
Ramkrishna Forgings