Filter interviews by
I applied via Campus Placement and was interviewed in Feb 2024. There were 3 interview rounds.
It is easy core related and complete reasoning
Focus only on communication
posted on 13 Feb 2024
The product cycle refers to the stages a product goes through from its development to its decline in the market.
The product cycle consists of four stages: introduction, growth, maturity, and decline.
During the introduction stage, the product is launched into the market and sales are low.
In the growth stage, sales start to increase rapidly as more customers become aware of the product.
The maturity stage is characterized...
Friction is the force that opposes the motion of an object when in contact with another object.
Friction is caused by the roughness of surfaces in contact
It can be reduced by using lubricants
Static friction prevents an object from moving while kinetic friction acts when the object is in motion
Examples of gears used include in bicycles, cars, and industrial machinery
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Generic manufacturing related questions.
Generic off the shelf GD topics
INDO-MIM interview questions for designations
Top trending discussions
posted on 12 Nov 2024
General sequence, verbal reasoning, numerical reasoning asked
posted on 27 Jan 2024
I applied via Campus Placement and was interviewed in Dec 2023. There were 2 interview rounds.
It consists of three parts .. verbal, numerical and other ... Followed by an domain specific test.
posted on 2 May 2024
Basic core questions
posted on 30 Oct 2024
It was easy and time based
posted on 12 Aug 2021
I applied via Company Website and was interviewed before Aug 2020. There were 4 interview rounds.
Major problems in any production plant include equipment breakdowns, supply chain disruptions, quality control issues, and workforce management challenges.
Equipment breakdowns: Regular maintenance and proactive monitoring can help prevent breakdowns. Having backup equipment or spare parts can minimize downtime.
Supply chain disruptions: Building strong relationships with suppliers, having alternative suppliers, and impl...
Assess the reasons for not achieving the target and create a plan to catch up.
Analyze the production process to identify bottlenecks or inefficiencies
Determine if there were any unexpected issues or delays that impacted production
Develop a plan to increase productivity and catch up on missed targets
Communicate the plan to relevant stakeholders and ensure everyone is on board
Monitor progress closely and make adjustments
The most important aspect is quality as it ensures customer satisfaction and brand reputation. The least important is maintenance as it can be outsourced or automated.
Quality is crucial as it directly impacts customer satisfaction and brand reputation.
Maintaining high quality standards ensures repeat business and positive word-of-mouth.
Quality control measures should be implemented throughout the production process.
Mai...
Inefficiency
Lack of streamlined processes
Poor communication between departments
Inadequate training of employees
Obsolete technology or equipment
High levels of waste or defects
Low productivity or output
Long lead times or delays
High costs or expenses
Low morale or motivation among employees
based on 4 interviews
Interview experience
based on 3 reviews
Rating in categories
Engineer
213
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Specialist
198
salaries
| ₹3 L/yr - ₹9 L/yr |
Group Leader
183
salaries
| ₹4.4 L/yr - ₹11.7 L/yr |
Production Engineer
159
salaries
| ₹1.5 L/yr - ₹7.2 L/yr |
Quality Engineer
153
salaries
| ₹1.3 L/yr - ₹8 L/yr |
Tata Steel
ArcelorMittal Nippon Steel
Simplex Infrastructures
Aditya Birla Group