Upload Button Icon Add office photos

Filter interviews by

Indo Rama Synthetics (i) Civil Engineer Interview Questions, Process, and Tips

Updated 19 Jul 2023

Indo Rama Synthetics (i) Civil Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What do you know about PEB?
  • Ans. 

    PEB stands for Pre-Engineered Building, which is a construction method where structural elements are fabricated off-site and assembled on-site.

    • PEB structures are cost-effective and time-efficient compared to traditional construction methods.

    • They are commonly used for warehouses, industrial buildings, and commercial spaces.

    • PEB components are designed and fabricated by specialized manufacturers before being transported t...

  • Answered by AI
  • Q2. What is the basic of surveying ?
  • Ans. 

    Surveying is the process of determining the relative positions of points on the Earth's surface.

    • Surveying involves measuring distances, angles, and elevations to create maps and plans.

    • It is used in construction, engineering, mapping, and various other fields.

    • Surveying can be done using tools such as total stations, GPS, and levels.

    • The data collected from surveying is used to design infrastructure projects and monitor c

  • Answered by AI
  • Q3. What is your area of intrest in Civil Engineering ?
  • Ans. 

    My area of interest in Civil Engineering is structural engineering.

    • I am passionate about designing and analyzing structures to ensure their safety and durability.

    • I enjoy working on projects such as bridges, buildings, and dams.

    • I have experience with software like SAP2000 and ETABS for structural analysis.

    • I am interested in exploring new materials and construction techniques to improve structural performance.

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Do you have knowledge about PEB?
  • Ans. 

    PEB stands for Pre-Engineered Buildings, which are structures that are fabricated off-site and assembled on-site.

    • PEB structures are designed and fabricated by a manufacturer before being transported to the construction site for assembly.

    • They are cost-effective and time-efficient compared to traditional construction methods.

    • PEB buildings are commonly used for warehouses, industrial facilities, and commercial buildings.

    • E...

  • Answered by AI
  • Q2. How many years of experience you had in Industrial Sector
  • Q3. What type of experience you have

Interview Preparation Tips

Interview preparation tips for other job seekers - Just try your best there are lot of work behind everywhere just we need to find and pic this out.

Interview questions from similar companies

I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Haw installation turn out rail track
  • Ans. 

    Rail tracks are installed through a process involving surveying, grading, laying ballast, placing sleepers, and attaching rails.

    • Surveying is done to determine the alignment and elevation of the track.

    • Grading involves preparing the ground by removing vegetation and leveling the surface.

    • Ballast, typically made of crushed stone, is laid to provide stability and drainage.

    • Sleepers, also known as ties, are placed on the ball...

  • Answered by AI
  • Q2. Haw density use main track
  • Ans. 

    Track density refers to the number of tracks per unit length on a railway main track.

    • Track density is an important factor in determining the capacity and efficiency of a railway system.

    • It is usually measured in terms of tracks per kilometer or mile.

    • Higher track density allows for more trains to operate simultaneously, increasing the system's capacity.

    • Track density can vary depending on the type of railway line, such as...

  • Answered by AI
  • Q3. 60kg Rail height and haw ballast size used in track
  • Ans. 

    The rail height for a 60kg rail and the size of ballast used in the track.

    • The rail height for a 60kg rail is typically around 170mm.

    • The size of ballast used in the track depends on various factors such as the type of track, soil conditions, and design specifications.

    • Common ballast sizes range from 20mm to 50mm in diameter.

    • The ballast should be well-graded and free from dust and fines to provide stability and drainage.

    • P...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Practical work experience most important site execution work time decide decision

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. People management ,time study and methods

Interview Preparation Tips

Interview preparation tips for other job seekers - If company confirms u as the member of their company to continue ,you should feel proud and resign existing and join immiadetly or ask some time but not take silly decession which u loose u r entire techniques and subject and lost u r own identity.
(I failed )

Interview Questionnaire 

1 Question

  • Q1. Questions are asked about civil fundamentals and what role playing in billing process.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Current CTC of previous company
  • Q2. Expected CTC as per your previous company
  • Q3. Work experience
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Easy basic test normal aptitude training can clear

Round 3 - Technical 

(1 Question)

  • Q1. Ask about basics of textile like count,fabric,yarn

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with the flow and speak confident

I applied via Walk-in and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Plinth beam, concrete ratio, etc
  • Q2. Different types of cement, which is best cement, grade of cement,
  • Ans. 

    The best type and grade of cement depend on the specific project requirements.

    • Different types of cement include Ordinary Portland Cement, Portland Pozzolana Cement, and Rapid Hardening Cement.

    • The grade of cement is determined by its compressive strength, with higher grades indicating stronger cement.

    • The best type and grade of cement for a project depend on factors such as the type of construction, environmental conditi...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Trident Group Civil Site Engineer interview:
  • Anywhere
Interview preparation tips for other job seekers - What ever work you are doing just do very politely work hard and you will see the outcome

I applied via LinkedIn and was interviewed in Oct 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

About India population... it's worship or....

Round 3 - Technical 

(1 Question)

  • Q1. How to stitch....? Zig zag Machine stitching strat line
  • Ans. 

    To stitch a zigzag line using a machine, adjust the stitch width and length and guide the fabric through the machine.

    • Set the machine to zigzag stitch mode

    • Adjust the stitch width and length according to the fabric and desired outcome

    • Guide the fabric through the machine, keeping it straight and even

    • Practice on scrap fabric before stitching on the final project

  • Answered by AI
Round 4 - One-on-one 

(1 Question)

  • Q1. About family . They does study or Job and how are your parents.
Round 5 - Case Study 

How to increase production in minimum manpower

Interview Preparation Tips

Interview preparation tips for other job seekers - Self confidence is most important because don't know anyone...who are you.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Basic construction procedure IS CODE exposure Technical specifications
Round 3 - One-on-one 

(1 Question)

  • Q1. Very low budget for site execution team

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join for just realty name ur in hand salary matters so go for strong negotiation if you have sound knowledge of your job

Most important if you are planning for one year the notice period is 03 month which is recover from your salary and full and final settlement
So it's big financial loss at year end when you left organisation if you are unable to serve complete 03 month

Site Engineer is treated as foreman by managers no involvement in any meetings and strategic decision no chances of growth within organisation

All the festival are celebrated very well.

Hr team take care of employees
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. How to control the inventory through the SAP.
  • Ans. 

    Inventory in SAP can be controlled through various functionalities such as material management, warehouse management, and production planning.

    • Utilize SAP's Material Management module to track and manage inventory levels

    • Implement SAP's Warehouse Management module to optimize storage and movement of inventory

    • Utilize SAP's Production Planning module to forecast demand and plan production accordingly

  • Answered by AI

Skills evaluated in this interview

Indo Rama Synthetics (i) Interview FAQs

How many rounds are there in Indo Rama Synthetics (i) Civil Engineer interview?
Indo Rama Synthetics (i) interview process usually has 3 rounds. The most common rounds in the Indo Rama Synthetics (i) interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Indo Rama Synthetics (i) Civil Engineer interview?

Some of the top questions asked at the Indo Rama Synthetics (i) Civil Engineer interview -

  1. What is your area of intrest in Civil Engineerin...read more
  2. What is the basic of surveyin...read more
  3. Do you have knowledge about P...read more

Tell us how to improve this page.

Indo Rama Synthetics (i) Civil Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Trident Group Interview Questions
3.5
 • 120 Interviews
Relaxo Footwear Interview Questions
4.0
 • 86 Interviews
Adidas Interview Questions
3.9
 • 73 Interviews
Arvind Group Interview Questions
4.0
 • 62 Interviews
Bata Interview Questions
3.7
 • 62 Interviews
Page Industries Interview Questions
4.2
 • 43 Interviews
Alok Industries Interview Questions
3.7
 • 39 Interviews
Monte Carlo Interview Questions
4.2
 • 25 Interviews
View all
Indo Rama Synthetics (i) Civil Engineer Salary
based on 4 salaries
₹2.6 L/yr - ₹4.5 L/yr
15% less than the average Civil Engineer Salary in India
View more details

Indo Rama Synthetics (i) Civil Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

3.0

Salary

4.0

Job security

5.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Engineer
33 salaries
unlock blur

₹2.8 L/yr - ₹5.2 L/yr

Assistant Manager
29 salaries
unlock blur

₹4.8 L/yr - ₹12 L/yr

Production Supervisor
21 salaries
unlock blur

₹2.5 L/yr - ₹4.2 L/yr

Senior Engineer
18 salaries
unlock blur

₹3.6 L/yr - ₹9 L/yr

Maintenance Engineer
18 salaries
unlock blur

₹2.4 L/yr - ₹6 L/yr

Explore more salaries
Compare Indo Rama Synthetics (i) with

Raymond Lifestyle Limited

4.1
Compare

Trident Group

3.5
Compare

Arvind Group

4.0
Compare

Bata

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview