Filter interviews by
posted on 17 Dec 2020
I applied via Company Website and was interviewed before Dec 2019. There were 4 interview rounds.
Flow measuring devices are used to measure the rate of flow of a fluid, while level measuring devices are used to measure the level of a substance in a container.
Flow measuring devices include orifice plates, flow meters, and ultrasonic flow meters.
Level measuring devices include float switches, capacitance level sensors, and ultrasonic level sensors.
I would inform my supervisor and request for leave to attend to the emergency.
Inform supervisor immediately
Request for leave to attend to emergency
Ensure handover of responsibilities to a colleague
Stay in communication with team to ensure work is covered
Top trending discussions
posted on 8 Jan 2025
Java , selenium , frame work explanation and coding questions in first round
2nd round managerial round
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
The three main things in a hydrotest test pack are pressure gauges, test pumps, and test plugs.
Pressure gauges are used to measure the pressure during the hydrotest.
Test pumps are used to generate the required pressure for the test.
Test plugs are used to seal off the openings in the system being tested.
Cement coating standards ensure the quality and durability of cross country pipelines.
Cement coating standards specify the thickness and composition of the coating.
Standards also define the application and curing processes for the coating.
Coating standards ensure protection against corrosion and mechanical damage.
Examples of cement coating standards include API RP 5L2 and ISO 21809-1.
posted on 29 May 2024
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2024. There was 1 interview round.
Aptitude test assumes that individuals have inherent strengths and weaknesess and have a natural inclination towards or failure in specific areas. Based on thier innate charactersitics
The main problem facing the project is the lack of clear communication between team members.
Lack of clear communication leading to misunderstandings and delays
Team members not sharing important information with each other
Difficulty in coordinating tasks and aligning goals
Possible solutions include regular team meetings, clear communication channels, and project management tools
posted on 21 Nov 2022
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in May 2022. There were 2 interview rounds.
A
Assistant Manager
292
salaries
| ₹14 L/yr - ₹30 L/yr |
Apprentice Trainee
135
salaries
| ₹0.9 L/yr - ₹3.6 L/yr |
Manager
123
salaries
| ₹1.2 L/yr - ₹7.4 L/yr |
Project Assistant
120
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Technician Apprentice
116
salaries
| ₹1.1 L/yr - ₹5 L/yr |
GAIL
Bharat Petroleum
Hindustan Petroleum
Reliance Industries