Fly ash is a byproduct of coal combustion and is used in cement to improve workability, reduce permeability, and increase durability.
Fly ash is a fine powder that is added to cement to improve its properties.
It is a byproduct of coal combustion and is collected from power plants.
Fly ash improves workability by reducing water demand and increasing pumpability.
It reduces permeability and increases durability by filling v...
The curing period of concrete is the time required for it to gain sufficient strength and durability.
Curing is a crucial process in concrete construction that involves maintaining moisture and temperature conditions to allow proper hydration of cement.
The duration of the curing period depends on factors like the type of cement used, ambient conditions, and the desired strength of the concrete.
Generally, the curing peri...
Compression zone is located at the bottom of a simply supported beam and at the top of a cantilever beam. Tension zone is located at the top of a simply supported beam and at the bottom of a cantilever beam.
In a simply supported beam, the compression zone is located at the bottom because the beam is supported at its ends, causing the bottom fibers to be compressed.
In a cantilever beam, the compression zone is located a...
PCC stands for Plain Cement Concrete and RCC stands for Reinforced Cement Concrete. The density of steel is around 7850 kg/m³ and the density of cement is around 1440 kg/m³.
PCC is a type of concrete made with cement, sand, and coarse aggregates.
RCC is a type of concrete made with cement, sand, coarse aggregates, and steel reinforcement.
The unit of PCC and RCC refers to the measurement of volume or quantity used in cons...
The formula for cutting length of stirrup is 2L + 2B + 10D, and weight of 1m steel of dia 12mm is 0.888 kg.
Cutting length of stirrup formula: 2L + 2B + 10D
Weight of 1m steel of dia 12mm: 0.888 kg
L = Length of the stirrup
B = Breadth of the stirrup
D = Diameter of the stirrup
I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.
I work in the field of software engineering.
Developing and maintaining software applications
Designing and implementing software solutions
Collaborating with cross-functional teams
Troubleshooting and debugging software issues
Ensuring code quality and adherence to best practices
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
I appeared for an interview before Mar 2024, where I was asked the following questions.
Effective project handling involves planning, communication, and adaptability to ensure successful outcomes.
Define clear project goals and objectives to align the team.
Utilize project management tools like Jira or Trello for tracking progress.
Conduct regular team meetings to discuss updates and challenges.
Implement Agile methodologies to adapt to changes quickly.
Document all processes and decisions for future reference
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.
Deduction in shuttering criteria is done to reduce the cost of construction.
It is also done to reduce the time taken for construction.
The deduction is usually done based on the strength of the concrete being used.
For example, if the concrete strength is high, less shuttering material is required.
The deduct...
The proportion of materials used in M25 grade concrete is 1:1:2 (cement:sand:aggregate).
M25 grade concrete consists of 1 part cement, 1 part sand, and 2 parts aggregate.
For example, if you have 1 kg of cement, you would need 1 kg of sand and 2 kg of aggregate to make M25 grade concrete.
I have 2 years of experience working as a Junior Engineer at XYZ Company.
Worked on various engineering projects under the guidance of senior engineers
Assisted in designing and testing new products
Collaborated with cross-functional teams to troubleshoot and resolve technical issues
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Waterproofing work & Gypsum work processing
posted on 24 Dec 2024
Some of the top questions asked at the Imaginearc Infrastructure Civil Site Engineer interview -
based on 2 reviews
Rating in categories
Site Engineer
5
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Civil Site Engineer
4
salaries
| ₹1.6 L/yr - ₹3.8 L/yr |
Structural Design Engineer
4
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
Executive Accountant
4
salaries
| ₹0.9 L/yr - ₹4.4 L/yr |
Project Manager
3
salaries
| ₹3.6 L/yr - ₹6.8 L/yr |
Signature Global
Sunteck Realty
Pittie Group
Pin Click