Filter interviews by
I applied via Campus Placement and was interviewed before May 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
IBI Group interview questions for popular designations
I applied via Campus Placement and was interviewed before Oct 2022. There were 5 interview rounds.
Moderate test the basics
To know communication skills
I applied via Company Website and was interviewed before May 2021. There was 1 interview round.
I am a passionate trainee architect with a strong background in design and a keen eye for detail.
Graduated with a Bachelor's degree in Architecture
Completed internships at renowned architectural firms
Proficient in CAD software and 3D modeling
Strong understanding of building codes and regulations
Excellent communication and teamwork skills
My design philosophy is to create functional and sustainable spaces that enhance the user's experience.
Prioritize functionality and user experience
Incorporate sustainable design principles
Consider the context and surroundings of the project
Collaborate with clients and stakeholders to ensure their needs are met
Continuously learn and adapt to new technologies and design trends
I have worked on several projects before, but my favorite project in college was designing a sustainable housing complex.
Designed a sustainable housing complex as part of my college coursework
Focused on incorporating renewable energy sources and eco-friendly materials
Collaborated with a team of fellow students to create a comprehensive design
Presented the project to a panel of faculty members and received positive feed
Yes, master planning involves designing and organizing large-scale developments, while streetscapes focus on the aesthetic and functional aspects of streets.
Master planning involves creating a comprehensive plan for a large area, including land use, transportation, and infrastructure.
Streetscapes involve designing the visual and functional elements of streets, such as sidewalks, lighting, and landscaping.
Both master pl...
A small garden for a gated colony should be designed with a focus on functionality and aesthetics.
Consider the available space and the needs of the residents
Incorporate elements such as seating areas, pathways, and greenery
Choose plants that are suitable for the local climate and require low maintenance
Ensure proper drainage and irrigation systems are in place
Use materials that are durable and complement the overall de
I designed a sustainable housing project in a rural area.
Used eco-friendly materials like bamboo and recycled wood
Implemented rainwater harvesting system for water conservation
Incorporated solar panels for renewable energy
Designed open spaces for community interaction
Focused on natural ventilation and lighting to reduce energy consumption
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
based on 7 interviews
Interview experience
based on 49 reviews
Rating in categories
Software Developer
31
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Systems Engineer
23
salaries
| ₹4.7 L/yr - ₹14.6 L/yr |
System Engineer
20
salaries
| ₹3 L/yr - ₹7.8 L/yr |
System Support Engineer
12
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Data Analyst
7
salaries
| ₹4.5 L/yr - ₹8.4 L/yr |
AECOM
Jacobs Engineering Group
WSP
Gensler