Filter interviews by
Top trending discussions
I appeared for an interview in Dec 2024.
I applied via Walk-in
I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.
M25 concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M25 concrete is commonly used in construction projects.
It is a mix of cement, sand, and coarse aggregates in a specific ratio.
The ratio of cement to sand to coarse aggregates in M25 concrete is 1:1:2.
The compressive strength of M25 concrete is achieved after 28 days of curing.
M25 concrete is suitable for various applications such as
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
based on 1 interview
Interview experience
Software Developer
32
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Systems Engineer
21
salaries
| ₹4.7 L/yr - ₹13.1 L/yr |
System Engineer
20
salaries
| ₹3 L/yr - ₹7.8 L/yr |
System Support Engineer
12
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Data Analyst
9
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures