Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.
I really my best in hundai mobis.my all good work in company
PCB stands for Printed Circuit Board.
PCB is a board made of non-conductive material on which electronic components are mounted.
It provides mechanical support and electrical connections between components.
PCBs are commonly used in electronic devices like computers, smartphones, and televisions.
They are designed using computer-aided design (CAD) software and manufactured through various processes like etching and solderi
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Dec 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There was 1 interview round.
The Process of ST department involves analyzing and improving production processes to increase efficiency and quality.
Analyze current production processes
Identify areas for improvement
Implement changes to increase efficiency and quality
Monitor and evaluate the impact of changes
Collaborate with other departments to optimize overall production
The temperature of a thermal oven can vary depending on the specific model and purpose.
The temperature of a thermal oven is typically adjustable and can range from around 50°C to over 300°C.
Different types of thermal ovens may have different temperature ranges based on their intended use.
For example, a drying oven may have a lower temperature range compared to a high-temperature furnace.
I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in Sep 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There were 2 interview rounds.
I want to join JTEKT because of their reputation for innovation and commitment to excellence in the production engineering field.
JTEKT has a strong reputation for innovation and cutting-edge technology in the production engineering industry.
I am impressed by JTEKT's commitment to excellence and continuous improvement in their products and processes.
I believe that working at JTEKT will provide me with valuable opportuni...
7 QC is a set of quality control tools used in manufacturing to identify and solve production problems.
7 QC stands for Seven Quality Control tools
These tools include Pareto analysis, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart
They are used to analyze data, identify root causes of problems, and make informed decisions for process improvement
PPL stands for Production Per Labour and PPLH stands for Production Per Labour Hour.
PPL is a measure of how much production is achieved per unit of labor input.
PPLH is a measure of how much production is achieved per labor hour.
Both metrics are used to evaluate the efficiency of production processes.
For example, if a factory produces 100 units with 10 workers, the PPL would be 10 units per worker.
If the same factory op...
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
Assembly BIW production process involves various parameters to ensure weld quality.
Ensure proper fit-up of components before welding
Maintain correct welding parameters such as voltage, current, and travel speed
Use appropriate shielding gas and welding consumables
Regularly inspect and maintain welding equipment
Implement quality control measures such as visual inspection and non-destructive testing
The project involved designing and implementing a new production process to improve efficiency and reduce costs.
Identify areas for improvement in current production process
Research and analyze different production methods and technologies
Design and implement new production process
Test and optimize the new process for efficiency and cost-effectiveness
Overcoming is the act of successfully dealing with or overcoming a challenge, obstacle, or difficulty.
Identifying the challenge or obstacle
Developing a plan or strategy to address it
Taking action to implement the plan
Persisting through setbacks or failures
Learning from the experience to improve future outcomes
I have a proven track record of successfully managing production processes and teams, resulting in increased efficiency and quality.
I have X years of experience in production management, including overseeing scheduling, budgeting, and quality control.
I have a strong understanding of lean manufacturing principles and have implemented strategies to streamline production processes.
I have a track record of improving produc...
I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.
Is English is compulsory is school
Managing mass absenteeism requires effective planning, communication, and flexibility.
Develop a contingency plan to address potential absences
Cross-train employees to ensure coverage in critical roles
Implement flexible work arrangements, such as remote work or flexible schedules
Communicate expectations and policies regarding absenteeism
Encourage a healthy work-life balance to reduce burnout and absenteeism
Monitor and t...
I am passionate about production and have the necessary skills and experience to excel in this role.
I have a strong background in production, with several years of experience in managing and overseeing production processes.
I have a deep understanding of the industry and its challenges, and I am confident in my ability to navigate and overcome them.
I am highly organized and detail-oriented, which are essential qualities...
Interview experience
based on 2 reviews
Rating in categories
Senior Research Engineer
359
salaries
| ₹6.4 L/yr - ₹14.2 L/yr |
Research Engineer
238
salaries
| ₹5.3 L/yr - ₹10 L/yr |
Senior Executive
208
salaries
| ₹3.6 L/yr - ₹14.3 L/yr |
Lead Research Engineer
180
salaries
| ₹10 L/yr - ₹21.1 L/yr |
Assistant Manager
166
salaries
| ₹6.5 L/yr - ₹16.2 L/yr |
Bosch
Samvardhana Motherson Group
ZF Commercial Vehicle Control Systems
Sundaram Clayton