i
Schaeffler India
Filter interviews by
The project involved designing and implementing a new production process to improve efficiency and reduce costs.
Identify areas for improvement in current production process
Research and analyze different production methods and technologies
Design and implement new production process
Test and optimize the new process for efficiency and cost-effectiveness
Overcoming is the act of successfully dealing with or overcoming a challenge, obstacle, or difficulty.
Identifying the challenge or obstacle
Developing a plan or strategy to address it
Taking action to implement the plan
Persisting through setbacks or failures
Learning from the experience to improve future outcomes
I applied via Walk-in and was interviewed before Oct 2023. There were 2 interview rounds.
Production update and emergency breakdown attend
Emergency switchuation management involves quick response, clear communication, and following established protocols.
Quickly assess the situation and determine the severity of the emergency.
Notify relevant personnel and emergency services if necessary.
Follow established protocols and procedures for handling emergencies.
Ensure clear communication with all team members to coordinate response efforts.
Regularly review and u...
5S is a method for organizing a workplace to improve efficiency and safety. First off approval is the initial approval given for a process or project.
5S stands for Sort, Set in order, Shine, Standardize, Sustain
It involves organizing the workplace by removing unnecessary items, arranging necessary items in a logical manner, cleaning and maintaining the workspace, and establishing procedures for sustaining the improveme...
PPE equipment refers to personal protective equipment worn to minimize exposure to hazards that can cause injuries or illnesses.
Includes items like helmets, gloves, goggles, masks, and safety shoes
Used in various industries such as construction, manufacturing, healthcare, and mining
Designed to protect against physical, chemical, biological, and radiological hazards
Must be properly fitted and maintained to ensure effect
I applied via Walk-in and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 3 interview rounds.
Explanation of how to calculate OEE, use 7QC tools, TMP, productivity, team building, manpower management, SAP module, inventory control, and scrap reduction.
OEE calculation involves multiplying availability, performance, and quality percentages
7QC tools include Pareto chart, fishbone diagram, control chart, etc.
TMP stands for Total Maintenance Productivity and measures maintenance efficiency
Productivity can be calcula...
I applied via Naukri.com and was interviewed in Oct 2022. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There was 1 interview round.
Productivity in business refers to the efficiency and effectiveness of the production process.
Productivity is the measure of output per unit of input.
It is important for businesses to maximize productivity to increase profits and remain competitive.
Factors that can affect productivity include technology, employee training, and management practices.
Examples of productivity measures include units produced per hour, reven...
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
Kanban is a lean manufacturing system that ensures smooth inventory flow. Material shortage is managed by effective planning and communication with vendors. Manpower is handled by proper training and allocation of resources.
Kanban is a visual system that helps in managing inventory levels and production flow
Effective planning and communication with vendors helps in managing material shortage
Proper training and allocati...
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I have achieved significant improvements in all 4M areas throughout my career.
Implemented new machine maintenance program resulting in 20% decrease in downtime
Developed new material sourcing strategy resulting in 15% cost savings
Redesigned production line layout resulting in 30% increase in efficiency
Implemented lean manufacturing principles resulting in 25% reduction in waste
Trained and mentored team members resulting...
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
I have a Bachelor's degree in Mechanical Engineering and 5 years of experience in production engineering.
Bachelor's degree in Mechanical Engineering
5 years of experience in production engineering
based on 4 interviews
Interview experience
based on 19 reviews
Rating in categories
Senior Executive
176
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
153
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
150
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
119
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
102
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
Siemens
ABB
TK Elevator