Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Hitachi Energy Team. If you also belong to the team, you can get access from here

Hitachi Energy Verified Tick

Compare button icon Compare button icon Compare
4.1

based on 636 Reviews

Filter interviews by

Hitachi Energy Site Manager Interview Questions and Answers

Updated 18 Jan 2025

Hitachi Energy Site Manager Interview Experiences

2 interviews found

Site Manager Interview Questions & Answers

user image Anonymous

posted on 18 Jan 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Nature of work done, team handling experience, communication, etc.

Round 2 - HR 

(1 Question)

  • Q1. Could you please highlight the successes and challenges faced in your career and explain how they were mitigated?
Round 3 - HR 

(1 Question)

  • Q1. Salary expectations

Site Manager Interview Questions & Answers

user image Anonymous

posted on 29 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How will the pre-site visit help?
  • Ans. 

    Pre-site visits help in understanding the layout, potential challenges, and requirements of the site before starting the project.

    • Allows for better planning and preparation

    • Helps in identifying any potential hazards or obstacles

    • Enables the team to assess the resources needed for the project

    • Facilitates communication with stakeholders and clients

    • Can lead to cost savings by addressing issues early on

  • Answered by AI

Site Manager Interview Questions Asked at Other Companies

asked in Cinépolis
Q1. Technical work procedures and how to follow up with material deli ... read more
Q2. How you will manage the site ?? What are the punch points to mana ... read more
Q3. How can you manage if there are any problems on site?
asked in Cinépolis
Q4. What are the delay factors caused to complete the project
Q5. What is job planning and openion about cash flow ??

Site Manager Jobs at Hitachi Energy

View all

Interview questions from similar companies

Site Manager Interview Questions & Answers

Vestas user image Michael Grier

posted on 28 Jun 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Indeed and was interviewed in May 2024. There was 1 interview round.

Round 1 - Screening 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Tell me a time safety was important
  • Ans. 

    Safety was crucial when overseeing a construction project with multiple contractors.

    • Ensuring all workers followed safety protocols

    • Conducting regular safety inspections

    • Providing safety training to all employees

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tata in job for parmanent how
  • Q2. Benifits and salary how time of period
Round 2 - Technical 

(3 Questions)

  • Q1. Solar project site is working of day
  • Q2. Time of work how
  • Q3. Safety work of area how
  • Ans. 

    Safety work of area involves implementing safety measures to prevent accidents and ensure a safe working environment.

    • Conduct regular safety inspections of the work area

    • Provide safety training to all workers

    • Enforce the use of personal protective equipment (PPE)

    • Implement safety protocols and procedures

    • Maintain clear and accessible emergency exits

    • Ensure proper storage and handling of hazardous materials

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Tata Power Site Execution Engineer interview:
  • Technical Skills
Interview preparation tips for other job seekers - Site execution engineer
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(4 Questions)

  • Q1. Tell me about yourself
  • Q2. What is your favourite colour
  • Q3. Why do you join for adani company?
  • Q4. What are faccinate about it?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Introduction

Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Name and work and experience
Round 3 - Technical 

(1 Question)

  • Q1. DC supply and ac supply

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical job
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Cube strength of 7 days
  • Ans. 

    Cube strength of 7 days is the compressive strength of concrete cubes after 7 days of curing.

    • Cube strength is an important measure of the quality and durability of concrete.

    • It is determined by conducting compression tests on concrete cubes after a specified curing period.

    • The cube strength at 7 days is an early indication of the ultimate strength of the concrete.

    • It is typically expressed in megapascals (MPa) or pounds p

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Nothing much , rest is basically technical

Round 3 - Group Discussion 

We have to talk on a subject for log time thats all

Round 4 - One-on-one 

(2 Questions)

  • Q1. How to speed control on motor and generator.
  • Ans. 

    Speed control on motors and generators can be achieved through various methods.

    • For motors, speed control can be achieved by adjusting the voltage, frequency, or the number of poles.

    • For generators, speed control can be achieved by adjusting the mechanical input or the load connected to the generator.

    • In motors, variable frequency drives (VFDs) can be used to control the speed by adjusting the frequency of the power suppl...

  • Answered by AI
  • Q2. What is IDFT controller ?
  • Ans. 

    IDFT controller stands for Inverse Discrete Fourier Transform controller.

    • IDFT controller is used in signal processing to convert frequency domain signals to time domain signals.

    • It is the inverse of the Discrete Fourier Transform (DFT) controller.

    • IDFT controller is commonly used in audio and video processing applications.

    • It is also used in communication systems to convert frequency domain signals to time domain signals ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a great confidence and idea . answer only those you know dont blabber
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Regarding basic ideas of core field. Like- what are the consequences of electric current failures?
  • Q2. Discuss about two types of valves from any field.
  • Ans. 

    Two types of valves commonly used are ball valves and gate valves.

    • Ball valves have a spherical closure unit that allows for quick on/off control of flow.

    • Gate valves have a flat closure unit that is raised and lowered to control flow.

    • Ball valves are commonly used in plumbing systems, while gate valves are often used in industrial applications.

    • Both types of valves can be manual or automated for remote operation.

    • Examples ...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Relates to personal questions like the motive to join Siemens?
  • Q2. What makes you to resign at the latest or earlier organization's

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to keep your honesty in every field of work inside Siemens.

Hitachi Energy Interview FAQs

How many rounds are there in Hitachi Energy Site Manager interview?
Hitachi Energy interview process usually has 2 rounds. The most common rounds in the Hitachi Energy interview process are HR, Technical and Group Discussion.
How to prepare for Hitachi Energy Site Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Hitachi Energy. The most common topics and skills that interviewers at Hitachi Energy expect are HSE, Construction, EPC, Forecasting and Claims.
What are the top questions asked in Hitachi Energy Site Manager interview?

Some of the top questions asked at the Hitachi Energy Site Manager interview -

  1. How will the pre-site visit he...read more
  2. Could you please highlight the successes and challenges faced in your career an...read more
  3. Salary expectati...read more

Tell us how to improve this page.

Hitachi Energy Site Manager Interview Process

based on 3 interviews

Interview experience

4.7
  
Excellent
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.2
 • 236 Interviews
ABB Interview Questions
4.1
 • 227 Interviews
Adani Group Interview Questions
3.9
 • 176 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Suzlon Group Interview Questions
4.1
 • 124 Interviews
Torrent Power Interview Questions
3.7
 • 123 Interviews
Eaton Corporation Interview Questions
4.0
 • 115 Interviews
BHEL Interview Questions
4.1
 • 106 Interviews
View all
Hitachi Energy Site Manager Salary
based on 26 salaries
₹8 L/yr - ₹25 L/yr
66% more than the average Site Manager Salary in India
View more details

Hitachi Energy Site Manager Reviews and Ratings

based on 4 reviews

3.7/5

Rating in categories

4.0

Skill development

3.1

Work-life balance

3.9

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

3.6

Work satisfaction

Explore 4 Reviews and Ratings
Site manager

Vadodara

5-8 Yrs

Not Disclosed

Site Manager

Faridabad

8-10 Yrs

Not Disclosed

Site Manager

Kolkata

3-7 Yrs

Not Disclosed

Explore more jobs
Project Engineer
300 salaries
unlock blur

₹4.5 L/yr - ₹16 L/yr

Associate Project Engineer
256 salaries
unlock blur

₹3.2 L/yr - ₹10 L/yr

Project Manager
119 salaries
unlock blur

₹7.9 L/yr - ₹30 L/yr

R&D Engineer
116 salaries
unlock blur

₹7.2 L/yr - ₹20.5 L/yr

Design Engineer
112 salaries
unlock blur

₹3.5 L/yr - ₹13.2 L/yr

Explore more salaries
Compare Hitachi Energy with

Siemens Energy

4.1
Compare

ABB

4.1
Compare

Schneider Electric

4.2
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview