Filter interviews by
I applied via Walk-in and was interviewed before Mar 2020. There were 6 interview rounds.
To manage the site, I will focus on communication, organization, safety, and quality control.
Regular communication with team members and stakeholders
Establishing clear goals and timelines
Ensuring compliance with safety regulations and protocols
Implementing quality control measures to ensure work meets standards
Regular site inspections to identify and address issues
Maintaining accurate records and documentation
Managing ...
Legal documentation refers to the written agreements, contracts, permits, licenses, and other legal papers required for a construction project.
Building permits
Environmental permits
Contract agreements
Insurance policies
Safety regulations
Employment contracts
Liability waivers
Job planning involves creating a detailed plan for completing a project, while cash flow refers to the movement of money in and out of a business.
Job planning involves breaking down a project into smaller tasks and assigning timelines and resources to each task.
Cash flow management involves monitoring the inflow and outflow of money in a business to ensure that there is enough cash to cover expenses.
Effective job plann...
Top trending discussions
I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.
WBS stands for Work Breakdown Structure. It is a hierarchical decomposition of the total scope of work to be carried out by the project team.
WBS breaks down the project into smaller, more manageable components.
Each component is further broken down into smaller tasks or activities.
Helps in organizing and planning the project work effectively.
Provides a visual representation of the project scope and deliverables.
Example:...
Types of waterproofing include cementitious, bituminous, polyurethane, and acrylic coatings.
Cementitious waterproofing: Uses cement-based materials to create a barrier against water penetration.
Bituminous waterproofing: Utilizes bitumen or asphalt to provide waterproofing protection.
Polyurethane waterproofing: Involves the use of polyurethane membranes or coatings for waterproofing.
Acrylic coatings: Form a protective l...
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
posted on 13 Aug 2022
I applied via Approached by Company and was interviewed in Jul 2022. There was 1 interview round.
My strength is my ability to lead and motivate a team towards achieving goals.
Effective communication skills
Strong decision-making abilities
Ability to delegate tasks efficiently
Positive attitude towards challenges
Experience in managing teams
Motivational skills
Goal-oriented mindset
posted on 29 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
Always they are going to do group discussion and target assignment
Work assignment need to full fill with in dead line
posted on 22 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
HIRA stands for Hazard Identification and Risk Assessment. It is a systematic process to identify potential hazards and analyze the associated risks.
HIRA is used to proactively identify hazards in the workplace or any other environment.
It involves identifying potential hazards, assessing the risks associated with them, and implementing control measures to mitigate those risks.
The process includes gathering information,...
In case of an accident, the situation should be immediately assessed, emergency services should be contacted, and necessary first aid should be provided.
Assess the situation to determine the severity of the accident
Contact emergency services (ambulance, fire department, etc.)
Secure the area to prevent further accidents or injuries
Provide necessary first aid to the injured individuals
Document the accident and gather inf
ABT is Anytime Breath Test and TBT is Tool Box Talk. ABT is used to detect alcohol consumption while TBT is used to discuss safety measures.
ABT is a test to detect alcohol consumption at any time while TBT is a safety meeting held before starting work.
ABT is necessary to ensure that employees are not under the influence of alcohol while working while TBT is necessary to discuss safety measures and prevent accidents.
ABT...
Accident and risk analysis involves identifying potential hazards, assessing the likelihood and severity of accidents, and implementing measures to mitigate risks.
Identify potential hazards in the workplace or environment
Assess the likelihood and severity of accidents that could occur
Evaluate the effectiveness of existing safety measures
Implement measures to mitigate risks and prevent accidents
Regularly review and upda...
based on 3 reviews
Rating in categories
Mechanical Engineer
24
salaries
| ₹3 L/yr - ₹8 L/yr |
Safety Officer
13
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Mechanical Maintenance Engineer
9
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Maintenance Engineer
8
salaries
| ₹3.6 L/yr - ₹10 L/yr |
QA QC Engineer
7
salaries
| ₹3.3 L/yr - ₹6.2 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
Ramky Infrastructure