(2 Questions)

  • Q1. What is the profile of intermediate roll
  • Ans. 

    Intermediate roll is a crucial component in the production process, used for shaping and forming materials.

    • Intermediate roll is typically made of high-quality steel or other durable materials.

    • It is used in various industrial processes such as rolling mills, paper mills, and metal forming.

    • The profile of intermediate roll includes dimensions like diameter, length, and surface finish.

    • It plays a key role in shaping and for

  • Answered by AI
  • Q2. Radius is of 3000 mm which starts from 1800 mm from headstock side
Round 2 - HR 

(2 Questions)

  • Q1. Tell me something about you
  • Q2. Given introduction

Interview Preparation Tips

Interview preparation tips for other job seekers - Speak confidently

Production Engineer Interview Questions asked at other Companies

Q1. How to solve the problem in robot means how to detect fault?
View answer (9)

I was interviewed in Jul 2022.

Round 1 - One-on-one 

(2 Questions)

  • Q1. When project was delayed
  • Ans. 

    I have experience in dealing with project delays and have successfully implemented strategies to get the project back on track.

    • Identify the root cause of the delay

    • Re-evaluate the project timeline and adjust accordingly

    • Communicate with stakeholders and team members to ensure everyone is aware of the delay and the plan to get back on track

    • Implement strategies such as increasing resources or adjusting project scope to mak...

  • Answered by AI
  • Q2. Due to not proper plan as per 1st priority, 2nd Priority and last priority to complete of system of project.

Interview Preparation Tips

Topics to prepare for Excellent Projects Site Project Manager interview:
  • Business Turnaround
  • Pipeline project
  • Piping Project
  • Structural Erection
  • Floting Tank Fabrication
  • Hydrotesting
Interview preparation tips for other job seekers - How to Make proper plan for Turnaround Project.

Site Project Manager Interview Questions asked at other Companies

Q1. What is the steps involved in High-rise building construction projects
View answer (1)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Asking about salary and beacon light.
Round 3 - Aptitude Test 
Round 4 - Aptitude Test 

Safety test

Interview Preparation Tips

Interview preparation tips for other job seekers - Any work do safely,and isometric drawing studying properly.

Mechanical Engineer Interview Questions asked at other Companies

Q1. What we need to do if pressure valve fail in boiler
View answer (8)

Site Manager Interview Questions & Answers

user image Anonymous

posted on 28 Mar 2021

I applied via Walk-in and was interviewed before Mar 2020. There were 6 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What you expect the job role and profile as site manager ??
  • Q2. How you will manage the site ?? What are the punch points to manage the site ??
  • Ans. 

    To manage the site, I will focus on communication, organization, safety, and quality control.

    • Regular communication with team members and stakeholders

    • Establishing clear goals and timelines

    • Ensuring compliance with safety regulations and protocols

    • Implementing quality control measures to ensure work meets standards

    • Regular site inspections to identify and address issues

    • Maintaining accurate records and documentation

    • Managing ...

  • Answered by AI
  • Q3. What are the legal documentation ??
  • Ans. 

    Legal documentation refers to the written agreements, contracts, permits, licenses, and other legal papers required for a construction project.

    • Building permits

    • Environmental permits

    • Contract agreements

    • Insurance policies

    • Safety regulations

    • Employment contracts

    • Liability waivers

  • Answered by AI
  • Q4. What is job planning and openion about cash flow ??
  • Ans. 

    Job planning involves creating a detailed plan for completing a project, while cash flow refers to the movement of money in and out of a business.

    • Job planning involves breaking down a project into smaller tasks and assigning timelines and resources to each task.

    • Cash flow management involves monitoring the inflow and outflow of money in a business to ensure that there is enough cash to cover expenses.

    • Effective job plann...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall responsibility of site.
I will go to zero level to understand the site and than act accordingly depending upon the requirements.eleminate the trouble makers and add some more fruitful accets.
All the documents required by client are needs to be maintained and submitted for review and for final posting of the same.
Considering the job,all the associated activities are coming under job planning and making and submitting the bills to Clint on time will automatically maintain the cash flow.

Site Manager Interview Questions asked at other Companies

Q1. Technical work procedures and how to follow up with material delivery
View answer (1)

Excellent Projects interview questions for popular designations

 Mechanical Engineer

 (1)

 Production Engineer

 (1)

 Site Manager

 (1)

 Site Project Manager

 (1)

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
No response

I applied via LinkedIn and was interviewed in Dec 2022. There were 6 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Asks about previous experience and salary
Round 3 - Technical 

(1 Question)

  • Q1. BOQ, BBS, previous work experience
Round 4 - One-on-one 

(1 Question)

  • Q1. Previous experience, time management, local rates
Round 5 - One-on-one 

(1 Question)

  • Q1. Previous work experience, local rates, time management, general hr question
Round 6 - HR 

(1 Question)

  • Q1. General hr questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident..
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Walking 

(1 Question)

  • Q1. About all previous companies working

I applied via Naukri.com and was interviewed before Oct 2021. There was 1 interview round.

Round 1 - Telephonic Call 

(3 Questions)

  • Q1. Regarding how safe you working and your safety manner. What kind of shuttering material had i used during my carrier How I handle client and satisfied them. How much experience of finishing item like plast...
  • Q2. What safety precautions during work Steel wastage control during making bbs and monitoring in site as per drawing.
  • Ans. 

    Safety precautions include wearing appropriate PPE, following proper procedures, and regular equipment maintenance. Steel wastage control involves accurate BBS preparation and monitoring on site.

    • Wear appropriate PPE such as hard hats, safety glasses, and steel-toed boots

    • Follow proper procedures for handling equipment and materials

    • Regularly maintain equipment to ensure it is in good working condition

    • Prepare accurate BBS...

  • Answered by AI
  • Q3. Skill for finishing activities till handover to client
  • Ans. 

    The skill for finishing activities till handover to client requires attention to detail, effective communication, and time management.

    • Create a detailed project plan with clear timelines and milestones

    • Regularly communicate progress and any potential delays to the client

    • Ensure all tasks are completed to a high standard and meet client expectations

    • Conduct thorough testing and quality assurance before handover

    • Provide clear...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Hi Tech Projects Assistant Engineer interview:
  • Strategic Planning
  • Coast control
  • Wastage Control
  • Client Relationship
  • Departmental coast control
  • All finshing activities
Interview preparation tips for other job seekers - It's performance based company.you should have knowledge of planning and site/team management.ideas for fruenty work and coast control will first preference.

I applied via Referral and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Questions based on Experience and Technical competency
Round 2 - One-on-one 

(1 Question)

  • Q1. Personal questions , Salary Negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - You should be systematic and open to learn and More Valued when you have more certifications

I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Difference between Section box & Scope Box.
  • Ans. 

    Section box is used to isolate a portion of the model for viewing/editing. Scope box is used to define the boundary of a view.

    • Section box is used to cut a section of the model for better visibility and editing.

    • Scope box is used to define the boundary of a view and control the visibility of elements outside the boundary.

    • Section box is used in 3D views while scope box is used in plan, section, elevation views.

    • Section box...

  • Answered by AI
  • Q2. Why we link Cad file in revit, instead of importing.
  • Ans. 

    Linking CAD files in Revit provides better control and flexibility.

    • Linked CAD files can be updated without affecting the Revit model.

    • Linked CAD files can be managed separately from the Revit model.

    • Linked CAD files can be controlled with visibility settings.

    • Importing CAD files can increase file size and slow down performance.

    • Linking CAD files allows for better collaboration with external consultants.

    • Linked CAD files can

  • Answered by AI
  • Q3. What is the different type of Revit file linking process. And when we use it.
  • Ans. 

    There are three types of Revit file linking process: Overlay, Attachment, and Imported CAD. We use it to link external files to our Revit project.

    • Overlay: used to display the linked file on top of the host model

    • Attachment: used to attach the linked file to the host model

    • Imported CAD: used to import CAD files into Revit

    • We use linking process to collaborate with other disciplines, to reference external files, and to crea...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview took place for 45 mnts.. If you know the answer anser ir confidently. Otherwise admit it. Develop your communication skill, dont be nervous.

I applied via Naukri.com and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

14 Questions

  • Q1. 1.Tell me about yourself ?
  • Q2. 2.what kind of input required for single line diagram?
  • Ans. 

    The input required for a single line diagram includes information about the electrical system components and their connections.

    • Information about the electrical system components such as generators, transformers, switchgear, and loads

    • The connections between these components including the type of connection and the ratings of the equipment

    • The voltage level of the system and the type of system grounding

    • The protective devi...

  • Answered by AI
  • Q3. 3.Motor Feeder & Power Feeder requirements?
  • Ans. 

    Motor feeder and power feeder requirements are essential for electrical design engineers to ensure proper functioning of electrical systems.

    • Motor feeder requirements include selecting the appropriate motor size, voltage, and current rating.

    • Power feeder requirements involve determining the load requirements and selecting the appropriate cable size and voltage drop.

    • Proper coordination and protection devices such as circu...

  • Answered by AI
  • Q4. 4.Hazardous area classification? What is Temperature Class? How do we categorized hazardous area?
  • Ans. 

    Hazardous area classification involves categorizing areas based on the presence of flammable gases, vapors, or dusts.

    • Hazardous areas are classified based on the likelihood of the presence of flammable substances.

    • Temperature Class refers to the maximum surface temperature of equipment that can be used in a hazardous area.

    • Hazardous areas are categorized into zones based on the frequency and duration of the presence of fl...

  • Answered by AI
  • Q5. 5.Why we take 1.25 FLA for circuit breaker? 1.5 times for Contactor?
  • Ans. 

    1.25 FLA is taken for circuit breaker and 1.5 times for contactor to ensure protection against overloading and short circuits.

    • 1.25 FLA is the maximum current that a circuit breaker can handle without tripping.

    • 1.5 times FLA is taken for contactor to ensure that it can handle the inrush current during motor starting.

    • This also provides protection against short circuits and overloading.

    • For example, if the full load current...

  • Answered by AI
  • Q6. 6.What is Percentage Impedance? Importance in short circuit current? Calculate short circuit current?
  • Ans. 

    Percentage Impedance is a measure of the voltage drop in a transformer during a short circuit. It determines the ability of the transformer to withstand short circuit currents.

    • Percentage Impedance is the ratio of the rated voltage of a transformer to the short circuit current at its terminals, expressed as a percentage.

    • It represents the internal impedance of the transformer and is usually provided by the manufacturer.

    • A...

  • Answered by AI
  • Q7. 7.Protection schemes for Transformer & Generator?
  • Ans. 

    Protection schemes for transformers and generators.

    • Overcurrent protection

    • Differential protection

    • Distance protection

    • Restricted earth fault protection

    • Backup protection

    • Buchholz relay protection

    • Thermal overload protection

    • Under/over voltage protection

    • Neutral grounding protection

  • Answered by AI
  • Q8. 8.How do we calculate Cabel sizing? Formula for Voltage drop? How do we calculate resistive & Inductive drop? Why do we limit voltage drop to 5 percent?
  • Ans. 

    Cable sizing is calculated using the formula for voltage drop, which takes into account resistive and inductive drop. Voltage drop is limited to 5% to ensure efficient power transmission.

    • Cable sizing is determined by calculating the voltage drop using the formula: VD = (I * L * R * 2) / 1000

    • Resistive drop is calculated using Ohm's Law: Vr = I * R

    • Inductive drop is calculated using the formula: Vi = I * X

    • Voltage drop is ...

  • Answered by AI
  • Q9. 9Earthing Calculation? Standard used for earthing calculation? Resistance in substation ? Resistance for lightning protection?
  • Ans. 

    Earthing calculation standards and resistances for substation and lightning protection.

    • Earthing calculation involves determining the resistance of the earth electrode system.

    • The standard used for earthing calculation is IEEE 80.

    • The resistance in substation should be less than 1 ohm.

    • The resistance for lightning protection should be less than 10 ohms.

    • Factors affecting earthing calculation include soil resistivity, electr...

  • Answered by AI
  • Q10. 10.motor contribution to the short circuit current?
  • Ans. 

    The motor contribution to the short circuit current is significant and needs to be considered in electrical design.

    • The motor's impedance affects the short circuit current level.

    • The motor's starting current can cause a significant increase in short circuit current.

    • The motor's location in the electrical system can affect its contribution to the short circuit current.

    • The motor's size and type can also impact its contribut...

  • Answered by AI
  • Q11. 11.Types of Contactor? Maximum efficiency of Transformer?
  • Ans. 

    Types of contactors include AC, DC, reversing, and definite purpose. Maximum efficiency of transformer depends on load and design.

    • AC contactors are used for alternating current circuits

    • DC contactors are used for direct current circuits

    • Reversing contactors are used to reverse the direction of current flow

    • Definite purpose contactors are designed for specific applications

    • Maximum efficiency of transformer is achieved at fu...

  • Answered by AI
  • Q12. 12.What is non linear loads ? Difference between non linear loads & linear loads?
  • Ans. 

    Non-linear loads are electrical devices that do not have a linear relationship between the voltage and current.

    • Non-linear loads draw non-sinusoidal current waveforms.

    • They can cause harmonic distortion in the electrical system.

    • Examples of non-linear loads include computers, televisions, and variable speed drives.

    • Linear loads have a linear relationship between voltage and current, such as incandescent light bulbs.

    • Linear

  • Answered by AI
  • Q13. 13.Lighting calculation? What is light loss factor ? What is utilisation factor ? Formula ? Minimum lux required in substation ?
  • Ans. 

    Explanation of lighting calculation, light loss factor, utilisation factor, and minimum lux required in substation.

    • Lighting calculation involves determining the amount of light required in a space.

    • Light loss factor is the reduction in light output due to factors such as dirt, dust, and aging of lamps.

    • Utilisation factor is the ratio of light received by a surface to the total light output of the lamps.

    • Formula for lighti...

  • Answered by AI
  • Q14. What is Apfc ? What is series reactor ?
  • Ans. 

    APFC stands for Automatic Power Factor Correction. Series reactor is a device used to limit current flow.

    • APFC is a system that automatically corrects the power factor of an electrical network.

    • It uses capacitors to improve the power factor and reduce energy consumption.

    • Series reactor is a device that is used to limit the flow of current in a circuit.

    • It is used to protect equipment from overvoltage and to reduce harmonic...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Prepare & write HR questions & answers for confidence. That provides extra edge for ex. Salary expectations, Tell me about yourself, why do you want left current organization etc
2.Prepare & analyse your CV thoroughly and prepare questions from that.
3.Be confident

Excellent Projects Interview FAQs

How many rounds are there in Excellent Projects interview?
Excellent Projects interview process usually has 2-3 rounds. The most common rounds in the Excellent Projects interview process are Aptitude Test, HR and One-on-one Round.
What are the top questions asked in Excellent Projects interview?

Some of the top questions asked at the Excellent Projects interview -

  1. How you will manage the site ?? What are the punch points to manage the site...read more
  2. What is job planning and openion about cash flow...read more
  3. What are the legal documentation...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Excellent Projects interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.3k Interviews
Infosys Interview Questions
3.7
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.5k Interviews
Tech Mahindra Interview Questions
3.6
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.7k Interviews
Bharti Airtel Interview Questions
4.0
 • 813 Interviews
Adani Group Interview Questions
3.9
 • 174 Interviews
View all

Excellent Projects Reviews and Ratings

based on 34 reviews

3.8/5

Rating in categories

3.9

Skill development

3.6

Work-Life balance

3.6

Salary & Benefits

3.7

Job Security

3.6

Company culture

3.7

Promotions/Appraisal

3.8

Work Satisfaction

Explore 34 Reviews and Ratings
Mechanical Engineer
27 salaries
unlock blur

₹2.4 L/yr - ₹8 L/yr

Safety Officer
13 salaries
unlock blur

₹2.5 L/yr - ₹4.8 L/yr

Mechanical Maintenance Engineer
9 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Maintenance Engineer
8 salaries
unlock blur

₹3.6 L/yr - ₹10 L/yr

QA QC Engineer
7 salaries
unlock blur

₹3.3 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Excellent Projects with

Reliance Industries

4.0
Compare

TCS

3.7
Compare

Infosys

3.7
Compare

Wipro

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview