Hindalco Industries
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Top trending discussions
I applied via Referral and was interviewed in Apr 2023. There were 2 interview rounds.
posted on 17 Nov 2022
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 15 Jan 2023
I applied via Naukri.com and was interviewed in Dec 2022. There were 4 interview rounds.
1. Number series
2. Coding and decoding
3. Find the odd one out
4. Statement and conclusion
posted on 22 Jan 2023
I applied via Referral and was interviewed before Jan 2022. There was 1 interview round.
Dross excess control can be achieved by implementing proper process controls and regular maintenance.
Regularly inspect and clean equipment to prevent buildup of dross
Implement process controls to minimize dross formation
Train employees on proper handling and disposal of dross
Monitor and analyze production data to identify areas for improvement
Collaborate with suppliers to ensure quality materials with minimal dross
Util...
To reduce rejection, focus on improving quality control measures and training employees.
Implement a thorough quality control process to catch defects early on
Train employees on proper production techniques and quality standards
Regularly review and analyze rejection data to identify patterns and areas for improvement
Collaborate with suppliers to ensure they are meeting quality standards
Invest in new technology or equipm...
Fuel consumption control can be achieved through proper planning, monitoring, and maintenance.
Develop a fuel consumption plan based on historical data and projected usage
Monitor fuel usage regularly and identify any deviations from the plan
Implement maintenance programs to ensure vehicles and equipment are operating efficiently
Train drivers and operators on fuel-efficient driving techniques
Consider alternative fuel sou...
To control manpower excess, proper planning, forecasting, and monitoring are necessary.
Analyze production data to determine the required workforce
Implement flexible work arrangements like part-time or temporary employment
Cross-train employees to perform multiple tasks
Monitor employee attendance and productivity
Implement a hiring freeze or reduce overtime
Consider outsourcing or automation as alternatives
Communicate with...
Fuel consumption, manpower, charging time, and rejection can be controlled through proper planning and implementation of efficient processes.
Implementing a fuel-efficient driving policy and regular maintenance of vehicles can reduce fuel consumption.
Proper scheduling and allocation of manpower can optimize productivity and reduce unnecessary labor costs.
Investing in fast charging technology and optimizing charging sche...
posted on 22 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
posted on 28 Jun 2022
I applied via campus placement at Engineering College, Bikaner and was interviewed before Jun 2021. There were 3 interview rounds.
Always start first and be crisp and interactive and stick to the topic
I applied via Approached by company and was interviewed before Feb 2021. There were 2 interview rounds.
A test designed to determine a person's ability in a particular skill or area of knowledge
A task or task assigned to someone as part of a job or course of study
Assistant Manager
1k
salaries
| ₹5 L/yr - ₹17 L/yr |
Junior Engineer
556
salaries
| ₹2.5 L/yr - ₹6.8 L/yr |
Manager
541
salaries
| ₹9.3 L/yr - ₹28 L/yr |
Assistant Engineer
469
salaries
| ₹1.9 L/yr - ₹8.8 L/yr |
Deputy Manager
275
salaries
| ₹8.6 L/yr - ₹19.8 L/yr |
Tata Steel
JSW Steel
Vedanta Limited
Hindustan Zinc