Upload Button Icon Add office photos

Highway Industries

Compare button icon Compare button icon Compare

Filter interviews by

Highway Industries Interview Questions and Answers

Updated 30 Apr 2025
Popular Designations

12 Interview questions

A Senior Production Engineer was asked 3mo ago
Q. What strategies can be employed to achieve production targets with the minimum resources available?
Ans. 

Employing strategic resource management and process optimization can help meet production targets efficiently.

  • Implement Lean Manufacturing principles to eliminate waste and improve efficiency. For example, using value stream mapping to identify bottlenecks.

  • Utilize cross-training of employees to enhance flexibility and reduce downtime. For instance, training operators to handle multiple machines.

  • Adopt just-in-time ...

View all Senior Production Engineer interview questions
A Senior Production Engineer was asked 3mo ago
Q. How can quality and production be maintained while working with unskilled operators?
Ans. 

Implementing structured training and robust processes ensures quality and production with unskilled operators.

  • Provide comprehensive training programs to enhance skills and knowledge.

  • Implement standardized operating procedures (SOPs) to guide operators.

  • Utilize visual aids and checklists to simplify complex tasks.

  • Conduct regular quality checks and feedback sessions to identify areas for improvement.

  • Pair unskilled op...

View all Senior Production Engineer interview questions
A Site Engineer was asked
Q. Tell me about the tests you have performed on site.
Ans. 

Various tests are conducted on site to ensure quality and safety standards are met.

  • Soil testing to determine soil composition and suitability for construction

  • Concrete testing to check strength and durability

  • Compaction testing to ensure proper compaction of soil

  • Water testing to assess water quality for construction purposes

  • Material testing for quality control and compliance with specifications

View all Site Engineer interview questions
A Site Engineer was asked
Q. What was the height of the slump cone?
Ans. 

The height of a slump cone is typically 12 inches.

  • The standard height of a slump cone used in construction is 12 inches.

  • The height of the slump cone is important for measuring the consistency of concrete mix.

  • The slump cone is filled with concrete, then lifted off to see how much the concrete slumps, indicating its workability.

View all Site Engineer interview questions
A Senior Production Engineer was asked
Q. How can costs be reduced?
Ans. 

Cost can be saved by optimizing processes, reducing waste, and negotiating better prices.

  • Optimize production processes to reduce time and labor costs

  • Reduce waste by implementing lean manufacturing principles

  • Negotiate better prices with suppliers

  • Implement cost-saving measures such as energy-efficient equipment

  • Outsource non-core activities to reduce overhead costs

View all Senior Production Engineer interview questions
A Senior Production Engineer was asked
Q. How do you control breakdowns and hidden losses?
Ans. 

Breakdowns and hidden losses can be controlled through proper maintenance and monitoring of equipment and processes.

  • Regular maintenance and inspections can identify potential issues before they become breakdowns.

  • Implementing a preventive maintenance program can reduce the frequency of breakdowns.

  • Training employees on proper use and care of equipment can prevent damage and breakdowns.

  • Monitoring production processes...

View all Senior Production Engineer interview questions
A Senior Production Engineer was asked
Q. How do you control rejection rates?
Ans. 

Rejection can be controlled by identifying the root cause and implementing corrective actions.

  • Identify the root cause of rejection through analysis of rejection data.

  • Implement corrective actions to address the root cause.

  • Train employees on proper procedures and quality standards.

  • Regularly monitor rejection rates and take necessary actions to improve.

  • Collaborate with suppliers to improve quality of incoming materia...

View all Senior Production Engineer interview questions
Are these interview questions helpful?
A Senior Production Engineer was asked
Q. How do you handle manpower management?
Ans. 

Manpower can be handled by effective communication, training, motivation, and delegation of tasks.

  • Establish clear communication channels to ensure everyone is aware of their roles and responsibilities

  • Provide adequate training to ensure employees have the necessary skills to perform their tasks

  • Motivate employees through recognition, rewards, and a positive work environment

  • Delegate tasks based on individual strength...

View all Senior Production Engineer interview questions
A Senior Production Engineer was asked
Q. How can production be increased?
Ans. 

To increase production, optimize processes, improve efficiency, and invest in technology.

  • Analyze current production processes and identify areas for improvement

  • Implement lean manufacturing principles to reduce waste and increase efficiency

  • Invest in new technology and equipment to automate processes and increase output

  • Train and develop employees to improve skills and knowledge

  • Implement a performance management syst...

View all Senior Production Engineer interview questions
A Senior Engineer was asked
Q. How defect generation , What is scada , What is autonomous Maintenance, How productivity can be improved
Ans. 

Defect generation, SCADA, autonomous maintenance, and productivity improvement are key topics in the interview for Senior Engineer.

  • Defect generation refers to the process of identifying and categorizing defects in a product or system.

  • SCADA stands for Supervisory Control and Data Acquisition, which is a system used to monitor and control industrial processes.

  • Autonomous Maintenance is a concept in Lean Manufacturing...

View all Senior Engineer interview questions

Highway Industries Interview Experiences

17 interviews found

I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. What is your profile, experience, expected salary?
  • Ans. 

    I am a Sr. Engineer with experience in production. I have a strong background in managing production processes and optimizing efficiency.

    • I have 8 years of experience in the production field.

    • I have successfully managed production teams and implemented process improvements.

    • I have expertise in lean manufacturing principles and have implemented them to reduce waste and increase productivity.

    • I have a track record of meeting...

  • Answered by AI
  • Q2. What is your experience, current salary, hobby?
  • Ans. 

    I have 10 years of experience in production engineering, my current salary is $80,000, and my hobby is woodworking.

    • 10 years of experience in production engineering

    • Current salary is $80,000

    • Hobby is woodworking

  • Answered by AI
Round 3 - Technical 

(6 Questions)

  • Q1. Ask the question related to forging production.
  • Q2. How to control rejection?
  • Ans. 

    Rejection can be controlled by identifying the root cause and implementing corrective actions.

    • Identify the root cause of rejection through analysis of rejection data.

    • Implement corrective actions to address the root cause.

    • Train employees on proper procedures and quality standards.

    • Regularly monitor rejection rates and take necessary actions to improve.

    • Collaborate with suppliers to improve quality of incoming materials.

    • Im...

  • Answered by AI
  • Q3. How increase the production
  • Ans. 

    To increase production, optimize processes, improve efficiency, and invest in technology.

    • Analyze current production processes and identify areas for improvement

    • Implement lean manufacturing principles to reduce waste and increase efficiency

    • Invest in new technology and equipment to automate processes and increase output

    • Train and develop employees to improve skills and knowledge

    • Implement a performance management system to...

  • Answered by AI
  • Q4. How to control breakdowns and hidden losses
  • Ans. 

    Breakdowns and hidden losses can be controlled through proper maintenance and monitoring of equipment and processes.

    • Regular maintenance and inspections can identify potential issues before they become breakdowns.

    • Implementing a preventive maintenance program can reduce the frequency of breakdowns.

    • Training employees on proper use and care of equipment can prevent damage and breakdowns.

    • Monitoring production processes can ...

  • Answered by AI
  • Q5. How to handle the Manpower
  • Ans. 

    Manpower can be handled by effective communication, training, motivation, and delegation of tasks.

    • Establish clear communication channels to ensure everyone is aware of their roles and responsibilities

    • Provide adequate training to ensure employees have the necessary skills to perform their tasks

    • Motivate employees through recognition, rewards, and a positive work environment

    • Delegate tasks based on individual strengths and...

  • Answered by AI
  • Q6. How ti save the cost.
  • Ans. 

    Cost can be saved by optimizing processes, reducing waste, and negotiating better prices.

    • Optimize production processes to reduce time and labor costs

    • Reduce waste by implementing lean manufacturing principles

    • Negotiate better prices with suppliers

    • Implement cost-saving measures such as energy-efficient equipment

    • Outsource non-core activities to reduce overhead costs

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Highway Industries Senior Production Engineer interview:
  • Continue read and learn
Interview preparation tips for other job seekers - Every time except the challenges to improve your knowledge and skill.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. 7 qc tools , graph reading, drawing knowledge
  • Q2. What about spc , msa, product Audit, Process audit, layout
  • Ans. 

    SPC, MSA, product/process audits, and layout are essential for quality control and process improvement in engineering.

    • SPC (Statistical Process Control) uses statistical methods to monitor and control a process, ensuring it operates at its full potential.

    • MSA (Measurement System Analysis) evaluates the accuracy and precision of measurement systems, crucial for reliable data collection.

    • Product audits assess the final prod...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Experience, current CTC
  • Q2. What is role and responsibilities
Round 3 - Technical 

(1 Question)

  • Q1. Relevent work experience
  • Ans. 

    Experienced Senior Quality Engineer with a strong background in software testing and quality assurance methodologies.

    • Over 8 years of experience in quality assurance and software testing.

    • Led a team of 5 QA engineers in a project that improved product reliability by 30%.

    • Implemented automated testing frameworks using Selenium, reducing testing time by 40%.

    • Conducted root cause analysis for defects, leading to a 25% decreas...

  • Answered by AI
Round 4 - Group Discussion 

Expected CTC , some technical questions regarding your work showing on resume.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good to work here
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. About hobbing line quality
  • Q2. Hobbing line quality

Interview Preparation Tips

Interview preparation tips for other job seekers - Hobbing setter and quality
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Regarding QA of SQA and in process...

Interview Preparation Tips

Interview preparation tips for other job seekers - Quality engineer

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 23 Sep 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about tests done on site
  • Ans. 

    Various tests are conducted on site to ensure quality and safety standards are met.

    • Soil testing to determine soil composition and suitability for construction

    • Concrete testing to check strength and durability

    • Compaction testing to ensure proper compaction of soil

    • Water testing to assess water quality for construction purposes

    • Material testing for quality control and compliance with specifications

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. What was the height if slump cone
  • Ans. 

    The height of a slump cone is typically 12 inches.

    • The standard height of a slump cone used in construction is 12 inches.

    • The height of the slump cone is important for measuring the consistency of concrete mix.

    • The slump cone is filled with concrete, then lifted off to see how much the concrete slumps, indicating its workability.

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What strategies can be employed to achieve production targets with the minimum resources available?
  • Ans. 

    Employing strategic resource management and process optimization can help meet production targets efficiently.

    • Implement Lean Manufacturing principles to eliminate waste and improve efficiency. For example, using value stream mapping to identify bottlenecks.

    • Utilize cross-training of employees to enhance flexibility and reduce downtime. For instance, training operators to handle multiple machines.

    • Adopt just-in-time (JIT)...

  • Answered by AI
  • Q2. How can quality and production be maintained while working with unskilled operators?
  • Ans. 

    Implementing structured training and robust processes ensures quality and production with unskilled operators.

    • Provide comprehensive training programs to enhance skills and knowledge.

    • Implement standardized operating procedures (SOPs) to guide operators.

    • Utilize visual aids and checklists to simplify complex tasks.

    • Conduct regular quality checks and feedback sessions to identify areas for improvement.

    • Pair unskilled operato...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Last company work

Interview Preparation Tips

Interview preparation tips for other job seekers - Good skills
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Question would be based on applied post
Round 3 - HR 

(1 Question)

  • Q1. Regarding previous salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and give answer honestly

QA Engineer Interview Questions & Answers

user image Rameshwar Dubey

posted on 14 Dec 2022

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. GD &T manly required for this company
  • Q2. SPC AND MSA required for testing and drawing visualization
Round 3 - HR 

(2 Questions)

  • Q1. Reasoning answer and question and previous company
  • Q2. Previous company salary and experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Please prepare GD&Tand drawing and Strumentation .
Spc, mas, ppap

Deputy Manager Interview Questions & Answers

user image Sandeep kumar

posted on 17 Aug 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. Moth civil engineering Highway
  • Q2. Moth civil engineering Highway question
  • Q3. Moth civil engineering Highway experience
  • Ans. 

    I have extensive experience in civil engineering with a focus on highway projects.

    • Managed multiple highway construction projects from start to finish

    • Collaborated with government agencies and contractors to ensure project success

    • Implemented innovative solutions to overcome challenges in highway design and construction

    • Ensured compliance with safety regulations and quality standards in all highway projects

  • Answered by AI
  • Q4. Moth is coda questions
  • Q5. Technical is coda questions
  • Q6. Moth is coda questionsHighway

Interview Preparation Tips

Interview preparation tips for other job seekers - DPM 20yers

Top trending discussions

View All
Interview Tips & Stories
5d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Highway Industries?
Ask anonymously on communities.

Highway Industries Interview FAQs

How many rounds are there in Highway Industries interview?
Highway Industries interview process usually has 2-3 rounds. The most common rounds in the Highway Industries interview process are Technical, Resume Shortlist and HR.
How to prepare for Highway Industries interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Highway Industries. The most common topics and skills that interviewers at Highway Industries expect are Communication Skills, AutoCAD, CNC Programming, Daily Production Planning and Documentation.
What are the top questions asked in Highway Industries interview?

Some of the top questions asked at the Highway Industries interview -

  1. What strategies can be employed to achieve production targets with the minimum ...read more
  2. How defect generation , What is scada , What is autonomous Maintenance, How pro...read more
  3. How can quality and production be maintained while working with unskilled opera...read more
How long is the Highway Industries interview process?

The duration of Highway Industries interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.1/5

based on 22 interview experiences

Difficulty level

Moderate 67%
Hard 33%

Duration

Less than 2 weeks 89%
4-6 weeks 11%
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 128 Interviews
Apco Infratech Interview Questions
3.7
 • 122 Interviews
Bechtel Interview Questions
3.9
 • 70 Interviews
Samsung E&A Interview Questions
4.0
 • 65 Interviews
Wood Group Interview Questions
3.7
 • 63 Interviews
Psp Projects Interview Questions
3.9
 • 59 Interviews
View all

Highway Industries Reviews and Ratings

based on 293 reviews

4.0/5

Rating in categories

3.9

Skill development

3.7

Work-life balance

3.6

Salary

3.7

Job security

3.8

Company culture

3.2

Promotions

3.7

Work satisfaction

Explore 293 Reviews and Ratings
Quality Engineer
83 salaries
unlock blur

₹1.9 L/yr - ₹4.8 L/yr

Engineer
64 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Senior Engineer
57 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Production Engineer
52 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Assistant Manager
41 salaries
unlock blur

₹3.5 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Highway Industries with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview