Filter interviews by
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.
BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.
The bending moment will be maximum at the points where the frame experiences maximum sway.
The BMD can be drawn by analyzing the internal forces and moments acting on the frame.
Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.
Start by determining the dimensions and layout of the piperack
Use software like AutoCAD to create accurate and detailed drawings
Include all necessary details such as pipe sizes, supports, and connections
Label all components clearly for easy understanding
Review and revise the drawings as needed for accuracy
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Heat exchangers are devices used to transfer heat between two or more fluids.
There are several types of heat exchangers, including shell and tube, plate heat exchangers, and finned tube heat exchangers.
The type of heat exchanger used depends on factors such as the application, fluid properties, and space constraints.
For example, shell and tube heat exchangers are commonly used in industrial applications, while plate he...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
Mathematical round -1.5hours
posted on 31 Jan 2024
About site experience
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Quality Engineer
67
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
53
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
38
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem