Filter interviews by
Top trending discussions
I applied via LinkedIn and was interviewed in Apr 2024. There were 5 interview rounds.
One for personality and another for Technical
Training procedure involves identifying training needs, designing training programs, delivering training sessions, and evaluating training effectiveness.
Identify training needs by conducting a training needs assessment
Design training programs based on identified needs and learning objectives
Deliver training sessions using various methods such as lectures, workshops, simulations, etc.
Evaluate training effectiveness thro...
posted on 22 Dec 2023
I applied via LinkedIn and was interviewed in Nov 2023. There were 2 interview rounds.
Flexbox properties are CSS properties that allow for flexible layout and positioning of elements within a container.
Flexbox properties are used to create responsive and dynamic layouts.
Some commonly used flexbox properties include flex-direction, justify-content, align-items, and flex-grow.
Flexbox properties can be applied to both the parent container and the child elements within it.
Flexbox provides a powerful and int
JavaScript data types have different properties that define their behavior and characteristics.
JavaScript has several built-in data types such as string, number, boolean, object, array, etc.
Each data type has its own set of properties and methods that can be accessed and manipulated.
For example, the string data type has properties like length, which returns the length of the string.
The number data type has properties l...
Responsive design properties ensure websites adapt to different screen sizes and devices.
Fluid grids: Use relative units like percentages to create flexible layouts.
Flexible images: Use CSS to ensure images scale proportionally.
Media queries: Apply different styles based on screen size and device capabilities.
Viewport meta tag: Control how a webpage is displayed on different devices.
Responsive typography: Adjust font s...
I applied via Referral and was interviewed in Nov 2023. There was 1 interview round.
The 7 QC tools are a set of basic tools used for quality control and problem-solving in manufacturing and service industries.
Check sheet: Used to collect and organize data in a systematic way.
Pareto chart: Helps identify the most significant factors contributing to a problem.
Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
Histogram: A graphical representation of d...
The six big losses in quality refer to specific areas where efficiency and productivity can be improved in a manufacturing process.
1. Downtime - time when production is stopped due to issues like equipment breakdowns or changeovers
2. Speed loss - inefficiencies that slow down the production process
3. Defects - products that do not meet quality standards and need to be reworked or scrapped
4. Setup and adjustment - time ...
PPAP stands for Production Part Approval Process, a standardized process in the automotive industry to ensure suppliers meet quality standards.
PPAP is a set of documents and procedures used to demonstrate that a supplier can consistently meet customer requirements.
It includes documentation such as control plans, process flow diagrams, and inspection records.
PPAP is typically required by automotive manufacturers before ...
ISO 9001 and IATF 16949 are two important quality management system standards.
ISO 9001 focuses on general quality management principles and practices.
IATF 16949 is specific to the automotive industry and includes additional requirements.
Both standards emphasize the importance of customer satisfaction, continual improvement, and risk-based thinking.
I am aware of the raw material details such as supplier information, specifications, quality standards, and testing procedures.
Supplier information including contact details and location
Raw material specifications such as composition, dimensions, and tolerances
Quality standards and certifications required for raw materials
Testing procedures for raw materials to ensure quality and compliance
I applied via campus placement at KLN College of Engineering, Konthagai and was interviewed in Mar 2024. There were 3 interview rounds.
Question from your core only plus some aptitude
Goes smoothly and topic is given by hr
posted on 23 Jul 2021
I applied via Naukri.com and was interviewed before Jul 2020. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
posted on 12 Jul 2023
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
As an assistant engineer, I plan the number of machines required and create monthly plans.
I plan the number of machines needed for various projects and tasks.
I consider factors like project timelines, workload, and resource availability.
I create monthly plans by analyzing project requirements and allocating resources accordingly.
I collaborate with team members and supervisors to ensure efficient planning and execution.
...
I create a daily report by summarizing the tasks completed, any issues encountered, and plans for the next day.
Start by listing all the tasks completed during the day
Note any issues encountered and how they were resolved
Include any progress made towards long-term goals
Outline plans for the next day, including any pending tasks
Ensure the report is concise and easy to understand
The capacity of my previous plant was 500 units per day.
The plant had a daily production capacity of 500 units.
We were able to meet the demand of our clients with this capacity.
The plant had a well-organized production line to ensure maximum output.
We regularly monitored and optimized the production process to increase efficiency.
The capacity was sufficient for the size of the plant and the demand of the market.
based on 2 reviews
Rating in categories
Huawei Technologies
Caparo Engineering India
Enco Engineers Combine
JBS Enterprises