A Shift Incharge was asked 3mo ago
Q. What are your responsibilities in a substation?
Ans. 

In a substation, I manage operations, ensure safety, and maintain equipment for efficient power distribution.

  • Monitor and control electrical equipment to ensure optimal performance.

  • Conduct regular inspections and maintenance of transformers and circuit breakers.

  • Implement safety protocols to protect personnel and equipment.

  • Coordinate with utility companies for power distribution and outages.

  • Respond to emergencies an...

View all Shift Incharge interview questions
A SEO Analyst was asked
Q. What is Off-Page SEO?
Ans. 

Off page SEO refers to activities done outside of your website to improve its search engine rankings.

  • Building backlinks from reputable websites

  • Social media marketing

  • Guest blogging on relevant websites

  • Online reputation management

  • Local SEO strategies

View all SEO Analyst interview questions
An Electrical Engineer was asked
Q. What is a substation?
Ans. 

A substation is a facility that transforms high voltage electricity to lower voltage for distribution to consumers.

  • Substations play a crucial role in the power grid by facilitating the transmission and distribution of electricity.

  • They receive electricity from power plants or transmission lines and transform it to a lower voltage suitable for distribution.

  • Substations contain various equipment such as transformers, ...

View all Electrical Engineer interview questions
A Deputy Manager was asked
Q. What is a B check in a generator?
Ans. 

B check in a generator refers to a comprehensive inspection and maintenance procedure to ensure its proper functioning.

  • B check involves a thorough examination of the generator's components, including the engine, fuel system, cooling system, electrical system, and control panel.

  • It includes tasks such as checking for leaks, inspecting belts and hoses, testing the battery, cleaning or replacing filters, and verifying...

View all Deputy Manager interview questions
A Deputy Manager was asked
Q. How do you manage a power failure situation?
Ans. 

In a power failure situation, effective management involves ensuring safety, communication, and contingency planning.

  • Ensure the safety of employees and customers by providing emergency lighting and clear evacuation procedures.

  • Maintain open lines of communication with staff, customers, and relevant authorities to provide updates and coordinate actions.

  • Implement contingency plans such as backup power sources, altern...

View all Deputy Manager interview questions
A Deputy Manager was asked
Q. How many circuit breakers are used in an electrical system?
Ans. 

The number of circuit breakers used in an electrical system varies depending on the size and complexity of the system.

  • The number of circuit breakers used in an electrical system depends on factors such as the size of the system, the number of circuits, and the specific requirements of the building or facility.

  • Residential electrical systems typically have a main circuit breaker at the electrical panel, along with i...

View all Deputy Manager interview questions
A Deputy Manager was asked
Q. Draw the single line diagram for HV to LT Panel diagram?
Ans. 

The single line diagram for HY to LT Panel diagram is a visual representation of the electrical connections and components in the system.

  • The single line diagram shows the flow of electrical power from the HY (High Voltage) side to the LT (Low Tension) side.

  • It includes the main components such as transformers, circuit breakers, switches, and control devices.

  • The diagram also indicates the interconnections between di...

View all Deputy Manager interview questions
Are these interview questions helpful?
A Deputy Manager was asked
Q. What is the difference between CT and PT?
Ans. 

CT and PT are both electrical devices used in power systems, but they have different functions and applications.

  • CT stands for Current Transformer, while PT stands for Potential Transformer.

  • CTs are used to measure and transform high currents into manageable levels for instruments and protective relays.

  • PTs are used to measure and transform high voltages into low voltages for instruments and protective relays.

  • CTs are...

View all Deputy Manager interview questions
A Deputy Manager was asked
Q. Why should a current transformer secondary not be left open?
Ans. 

Current transformer secondary is open to prevent damage to the transformer and connected equipment.

  • An open secondary circuit prevents excessive current flow and protects the transformer from damage.

  • It allows for safe measurement and monitoring of current without risk of short circuits.

  • An open secondary also prevents damage to connected equipment by isolating it from high currents.

  • In case of a fault or overload, an...

View all Deputy Manager interview questions
An Electrical Shift Engineer was asked
Q. What is the working principle of a Buchholz relay?
Ans. 

Buchholz relay is a protective device used in oil-filled transformers to detect and prevent faults.

  • It is installed in the oil-filled transformer tank.

  • It detects the presence of gas or oil flow in the transformer oil.

  • It trips the transformer if any fault is detected.

  • It is a type of gas actuated relay.

  • It is named after its inventor Max Buchholz.

View all Electrical Shift Engineer interview questions

JBS Enterprises Interview Experiences

27 interviews found

Technician Interview Questions & Answers

user image Anonymous

posted on 9 Nov 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - HR 

(3 Questions)

  • Q1. Shut down prosess
  • Ans. 

    Shutting down a process involves terminating a program or application running on a computer system.

    • Use task manager or command line to end the process

    • Ensure all unsaved work is saved before shutting down

    • Consider any dependencies or impact on other processes

  • Answered by AI
  • Q2. Breaker and transform se aata hai
  • Q3. Shut downprosess

Interview Preparation Tips

Interview preparation tips for other job seekers - Aacha hai

Skills evaluated in this interview

Engineer Interview Questions & Answers

user image Anonymous

posted on 23 May 2024

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. General Questions to be asked
  • Q2. What is Previous role
  • Q3. Transmission line and substations

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be Confident
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Manegement Topic of running our company

Round 2 - Technical 

(4 Questions)

  • Q1. Why Current transformer secondary is open?
  • Ans. 

    Current transformer secondary is open to prevent damage to the transformer and connected equipment.

    • An open secondary circuit prevents excessive current flow and protects the transformer from damage.

    • It allows for safe measurement and monitoring of current without risk of short circuits.

    • An open secondary also prevents damage to connected equipment by isolating it from high currents.

    • In case of a fault or overload, an open...

  • Answered by AI
  • Q2. What is different between CT and PT?
  • Ans. 

    CT and PT are both electrical devices used in power systems, but they have different functions and applications.

    • CT stands for Current Transformer, while PT stands for Potential Transformer.

    • CTs are used to measure and transform high currents into manageable levels for instruments and protective relays.

    • PTs are used to measure and transform high voltages into low voltages for instruments and protective relays.

    • CTs are typi...

  • Answered by AI
  • Q3. Draw the single line diagram for HY to LT Panel diagram?
  • Ans. 

    The single line diagram for HY to LT Panel diagram is a visual representation of the electrical connections and components in the system.

    • The single line diagram shows the flow of electrical power from the HY (High Voltage) side to the LT (Low Tension) side.

    • It includes the main components such as transformers, circuit breakers, switches, and control devices.

    • The diagram also indicates the interconnections between differe...

  • Answered by AI
  • Q4. How many circuit Breakers used in Electrical system?
  • Ans. 

    The number of circuit breakers used in an electrical system varies depending on the size and complexity of the system.

    • The number of circuit breakers used in an electrical system depends on factors such as the size of the system, the number of circuits, and the specific requirements of the building or facility.

    • Residential electrical systems typically have a main circuit breaker at the electrical panel, along with indivi...

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. How to manage in power failure situation?
  • Ans. 

    In a power failure situation, effective management involves ensuring safety, communication, and contingency planning.

    • Ensure the safety of employees and customers by providing emergency lighting and clear evacuation procedures.

    • Maintain open lines of communication with staff, customers, and relevant authorities to provide updates and coordinate actions.

    • Implement contingency plans such as backup power sources, alternative...

  • Answered by AI
  • Q2. What's the B check in generator?
  • Ans. 

    B check in a generator refers to a comprehensive inspection and maintenance procedure to ensure its proper functioning.

    • B check involves a thorough examination of the generator's components, including the engine, fuel system, cooling system, electrical system, and control panel.

    • It includes tasks such as checking for leaks, inspecting belts and hoses, testing the battery, cleaning or replacing filters, and verifying prop...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Protection in transformer
  • Ans. 

    Transformers require protection to prevent damage from faults, overloads, and external disturbances.

    • Overcurrent protection: Detects excessive current flow, triggering circuit breakers.

    • Differential protection: Compares input and output currents to identify faults.

    • Temperature monitoring: Uses sensors to prevent overheating, ensuring safe operation.

    • Bushing protection: Monitors insulation integrity to prevent failures.

    • Grou...

  • Answered by AI
  • Q2. What you do in substation
  • Ans. 

    In a substation, I manage operations, ensure safety, and maintain equipment for efficient power distribution.

    • Monitor and control electrical equipment to ensure optimal performance.

    • Conduct regular inspections and maintenance of transformers and circuit breakers.

    • Implement safety protocols to protect personnel and equipment.

    • Coordinate with utility companies for power distribution and outages.

    • Respond to emergencies and tro...

  • Answered by AI
  • Q3. Different type of cb
  • Ans. 

    Circuit breakers (CB) protect electrical circuits from overloads and faults, ensuring safety and reliability.

    • Miniature Circuit Breaker (MCB): Automatically switches off during overloads, e.g., in residential wiring.

    • Molded Case Circuit Breaker (MCCB): Used for medium voltage applications, e.g., industrial machinery.

    • Earth Leakage Circuit Breaker (ELCB): Protects against earth faults, e.g., in wet areas like bathrooms.

    • Res...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Recent tax amendments
  • Ans. 

    Recent tax amendments include changes in tax rates, deductions, and compliance requirements.

    • Introduction of new tax slabs under the new optional tax regime

    • Increase in TDS rates for non-salaried payments

    • Extension of deadlines for various tax compliances

    • Changes in tax audit limits for businesses

  • Answered by AI
  • Q2. Journal entries

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for basics
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is substation
  • Ans. 

    A substation is a facility that transforms high voltage electricity to lower voltage for distribution to consumers.

    • Substations play a crucial role in the power grid by facilitating the transmission and distribution of electricity.

    • They receive electricity from power plants or transmission lines and transform it to a lower voltage suitable for distribution.

    • Substations contain various equipment such as transformers, circu...

  • Answered by AI

SEO Analyst Interview Questions & Answers

user image Anonymous

posted on 17 May 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. What is Off page seo
  • Ans. 

    Off page SEO refers to activities done outside of your website to improve its search engine rankings.

    • Building backlinks from reputable websites

    • Social media marketing

    • Guest blogging on relevant websites

    • Online reputation management

    • Local SEO strategies

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Skills evaluated in this interview

I applied via AmbitionBox and was interviewed in Sep 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What is your daily role in your job
Round 3 - HR 

(1 Question)

  • Q1. Interduce my self, which company are you worked, ho much experince do you have,are you willing to come here
Round 4 - Technical 

(1 Question)

  • Q1. Motors& starters maintenance vfd drives maintenance & troubleshooting 33 kv s/s pts cts lighting arrestors & AB switch maintenance

Interview Preparation Tips

Interview preparation tips for other job seekers - i have a 10 years experince in electrical field i wii do the job every comfortable and hard work with respect of work
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1.In transformer protection Differential protection working principle 2.
  • Ans. 

    Differential protection is a type of transformer protection that compares the currents entering and leaving the transformer.

    • Differential protection is based on Kirchhoff's current law.

    • If the difference between the currents is greater than a set threshold, the protection system will trip.

    • This type of protection is used to detect internal faults in the transformer.

    • Differential protection can be applied to both power and ...

  • Answered by AI
  • Q2. 2. Bhuchholz relay working principle
  • Ans. 

    Buchholz relay is a protective device used in oil-filled transformers to detect and prevent faults.

    • It is installed in the oil-filled transformer tank.

    • It detects the presence of gas or oil flow in the transformer oil.

    • It trips the transformer if any fault is detected.

    • It is a type of gas actuated relay.

    • It is named after its inventor Max Buchholz.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Teach every day new

Site Incharge Interview Questions & Answers

user image Anonymous

posted on 15 Oct 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Oct 2023, where I was asked the following questions.

  • Q1. Shift Engineer (operation & Maintenance)
  • Q2. CB,LA, Isolator, Transformers

Top trending discussions

View All
Interview Tips & Stories
1w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about JBS Enterprises?
Ask anonymously on communities.

JBS Enterprises Interview FAQs

How many rounds are there in JBS Enterprises interview?
JBS Enterprises interview process usually has 2 rounds. The most common rounds in the JBS Enterprises interview process are Technical, Resume Shortlist and HR.
How to prepare for JBS Enterprises interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at JBS Enterprises. The most common topics and skills that interviewers at JBS Enterprises expect are Substation, Maintenance, Transmission Line, Operations and 400Kv.
What are the top questions asked in JBS Enterprises interview?

Some of the top questions asked at the JBS Enterprises interview -

  1. What kind of commodities have you purchas...read more
  2. Tell me the supplier list of ste...read more
  3. What is a good quality of the purcha...read more
What are the most common questions asked in JBS Enterprises HR round?

The most common HR questions asked in JBS Enterprises interview are -

  1. What is your family backgrou...read more
  2. What are your salary expectatio...read more
  3. Tell me about yourse...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.2/5

based on 23 interview experiences

Difficulty level

Easy 60%
Moderate 40%

Duration

Less than 2 weeks 83%
4-6 weeks 17%
View more

Interview Questions from Similar Companies

Flex Interview Questions
4.0
 • 201 Interviews
HOLITECH INDIA Interview Questions
4.0
 • 27 Interviews
Alfanar Interview Questions
4.0
 • 21 Interviews
WEG Interview Questions
4.1
 • 16 Interviews
BYD Electronics Interview Questions
3.3
 • 14 Interviews
Rakon Interview Questions
3.6
 • 14 Interviews
View all

JBS Enterprises Reviews and Ratings

based on 381 reviews

3.1/5

Rating in categories

3.2

Skill development

3.1

Work-life balance

2.7

Salary

3.2

Job security

2.9

Company culture

2.8

Promotions

3.1

Work satisfaction

Explore 381 Reviews and Ratings
Supervisor

Jamnagar,

Ahmedabad

+3

5-10 Yrs

Not Disclosed

Site Incharge

Warangal

3-12 Yrs

Not Disclosed

Maintenance Engineer

Bhilai Nagar

3-8 Yrs

Not Disclosed

Explore more jobs
Junior Engineer
127 salaries
unlock blur

₹1 L/yr - ₹3.5 L/yr

Electrical Engineer
59 salaries
unlock blur

₹1.7 L/yr - ₹5 L/yr

Shift Incharge
52 salaries
unlock blur

₹1.6 L/yr - ₹4 L/yr

Shift Engineer
34 salaries
unlock blur

₹1.3 L/yr - ₹3.8 L/yr

Engineer
32 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Explore more salaries
Compare JBS Enterprises with

Flex

4.0
Compare

Alfanar

4.0
Compare

MCM Telecom Equipment

3.9
Compare

Sgs Tekniks Manufacturing

3.8
Compare
write
Share an Interview