I applied via Naukri.com and was interviewed before Oct 2021. There were 2 interview rounds.
PPE required for TL and substation include hard hats, safety glasses, gloves, and high visibility clothing.
Hard hats to protect from falling objects
Safety glasses to protect eyes from debris
Gloves to protect hands from electrical shock and burns
High visibility clothing to increase visibility and safety
Additional PPE may be required depending on specific tasks and hazards
I applied via LinkedIn and was interviewed in Jun 2021. There were 3 interview rounds.
Provided a topic daily related work
Parts of a transformer include core, windings, insulation, tap changer, bushings, and cooling system.
Core: Provides a path for magnetic flux
Windings: Primary and secondary coils for transferring energy
Insulation: Prevents short circuits
Tap changer: Adjusts the turns ratio
Bushings: Insulated devices for connecting external circuits
Cooling system: Keeps the transformer from overheating
The rating of a transformer refers to its power capacity and voltage levels.
Transformer rating is typically given in kVA (kilovolt-amperes) or MVA (megavolt-amperes).
It indicates the maximum power that the transformer can handle without overheating.
The rating also includes the primary and secondary voltage levels of the transformer.
For example, a transformer may be rated as 500 kVA, 11 kV/415 V.
Properly sizing the tran...
One Bay Shutdown process involves isolating a single bay for maintenance while keeping the rest of the system operational.
Isolate the bay by closing necessary valves and disconnecting equipment
Ensure proper tagging and lockout procedures are followed
Implement safety measures to prevent accidents
Coordinate with other departments to minimize impact on operations
Perform necessary maintenance work efficiently and safely
Tes
A scheme of a substation refers to the layout and configuration of the various components within the substation.
The scheme includes the arrangement of transformers, circuit breakers, busbars, and other equipment.
It also shows the connections between different components and how power flows through the substation.
The scheme is essential for understanding the overall operation and maintenance of the substation.
Examples o...
I applied via Company Website and was interviewed in Oct 2021. There were 3 interview rounds.
JBS Enterprises interview questions for popular designations
Get interview-ready with Top JBS Enterprises Interview Questions
I applied via Company Website and was interviewed before Jul 2021. There were 2 interview rounds.
CVT stands for Continuously Variable Transmission. CB testing procedures involve measuring the performance of circuit breakers.
CVT is a type of transmission that allows for seamless gear shifting
To shutdown a line, the power source must be disconnected and all equipment turned off
CB testing procedures involve measuring the insulation resistance, contact resistance, and timing of circuit breakers
CB testing values vary d...
Top trending discussions
Interview experience
based on 362 reviews
Rating in categories
Junior Engineer
100
salaries
| ₹1 L/yr - ₹3.5 L/yr |
Electrical Engineer
80
salaries
| ₹1.4 L/yr - ₹5 L/yr |
Shift Incharge
54
salaries
| ₹1.2 L/yr - ₹4 L/yr |
Engineer
32
salaries
| ₹1.5 L/yr - ₹3.8 L/yr |
Shift Engineer
31
salaries
| ₹1.2 L/yr - ₹3.8 L/yr |
Cargill
Marico
ITC
Hindustan Unilever