Filter interviews by
I applied via Referral and was interviewed in Nov 2023. There was 1 interview round.
The 7 QC tools are a set of basic tools used for quality control and problem-solving in manufacturing and service industries.
Check sheet: Used to collect and organize data in a systematic way.
Pareto chart: Helps identify the most significant factors contributing to a problem.
Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
Histogram: A graphical representation of d...
The six big losses in quality refer to specific areas where efficiency and productivity can be improved in a manufacturing process.
1. Downtime - time when production is stopped due to issues like equipment breakdowns or changeovers
2. Speed loss - inefficiencies that slow down the production process
3. Defects - products that do not meet quality standards and need to be reworked or scrapped
4. Setup and adjustment - time ...
PPAP stands for Production Part Approval Process, a standardized process in the automotive industry to ensure suppliers meet quality standards.
PPAP is a set of documents and procedures used to demonstrate that a supplier can consistently meet customer requirements.
It includes documentation such as control plans, process flow diagrams, and inspection records.
PPAP is typically required by automotive manufacturers before ...
ISO 9001 and IATF 16949 are two important quality management system standards.
ISO 9001 focuses on general quality management principles and practices.
IATF 16949 is specific to the automotive industry and includes additional requirements.
Both standards emphasize the importance of customer satisfaction, continual improvement, and risk-based thinking.
I am aware of the raw material details such as supplier information, specifications, quality standards, and testing procedures.
Supplier information including contact details and location
Raw material specifications such as composition, dimensions, and tolerances
Quality standards and certifications required for raw materials
Testing procedures for raw materials to ensure quality and compliance
I applied via Referral and was interviewed before Jul 2023. There was 1 interview round.
The 7QC tools are a set of quality control tools used to analyze and solve quality-related issues in manufacturing and other industries.
Check sheets: Used to collect and organize data, such as defect types or frequency.
Histograms: Visual representation of data distribution to identify patterns or trends.
Pareto charts: Helps prioritize issues by showing the most significant factors affecting quality.
Cause and effect dia...
The 5 core tools in quality engineering are used for process improvement and problem-solving.
1. Process Flowcharts - used to visualize the steps in a process
2. Cause and Effect Diagrams (Fishbone Diagrams) - used to identify root causes of problems
3. Check Sheets - used to collect data in a structured manner
4. Pareto Charts - used to prioritize issues based on frequency or impact
5. Control Charts - used to monitor proc
I applied via Recruitment Consultant and was interviewed before Jun 2020. There were 6 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed before Nov 2020. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There were 3 interview rounds.
Startup code sequence refers to the order in which code is executed when a program is launched.
Startup code sequence typically involves initializing variables, setting up memory, and executing any necessary setup functions.
Examples of startup code sequence include setting up hardware registers in embedded systems, initializing global variables in C programs, and loading configuration files in web applications.
Yes, I am willing to work on weekends if necessary to meet project deadlines or address urgent issues.
I understand that sometimes working on weekends may be required in order to meet project deadlines or address urgent issues.
I am committed to delivering high-quality work and am willing to put in extra hours when needed.
I am flexible with my schedule and can adjust my plans to accommodate weekend work if necessary.
I will address conflicts by promoting open communication, active listening, and facilitating constructive discussions.
Encourage open communication among team members to address conflicts early on
Practice active listening to understand all perspectives involved
Facilitate constructive discussions to find mutually beneficial solutions
Establish clear team norms and guidelines for conflict resolution
Seek input from team mem...
Seeking new challenges and opportunities for growth in a more innovative and dynamic environment.
Looking for new challenges and opportunities for growth
Interested in working in a more innovative and dynamic environment
Seeking career advancement and professional development
Seeking new challenges and opportunities for growth in a different environment.
Looking for new challenges and opportunities for growth
Interested in working with different technologies or industries
Seeking a better work-life balance or company culture
Wanting to expand skill set or take on more responsibilities
Relocation to a new area
I appeared for an interview in Mar 2023.
posted on 17 Jan 2024
I appeared for an interview in Dec 2023.
Reasoning, enlish , appitude
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
Valves are devices used to control the flow of fluids or gases. There are several types of valves used in various industries.
Gate valve
Ball valve
Butterfly valve
Check valve
Globe valve
Needle valve
Diaphragm valve
Pressure relief valve
I applied via Naukri.com and was interviewed in Oct 2020. There were 5 interview rounds.
based on 2 interviews
Interview experience
based on 6 reviews
Rating in categories
Assistant Manager
34
salaries
| ₹3.8 L/yr - ₹9 L/yr |
Senior Engineer
28
salaries
| ₹3.3 L/yr - ₹6.5 L/yr |
Engineer
25
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Quality Engineer
24
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Production Engineer
23
salaries
| ₹1.5 L/yr - ₹3.9 L/yr |
Marelli
Enco Engineers Combine
Seoyon E-hwa Automotive
Maxxis Rubber