Hems Corporation
10+ eProductivity Software Interview Questions and Answers
Q1. If the signal not working, How to pass train without signal?
In such a situation, the train can be passed by using manual flagging and communication between the station staff and the train driver.
Use manual flagging by station staff to signal the train to proceed cautiously.
Ensure clear communication between station staff and train driver to coordinate the safe passage of the train.
Implement strict safety protocols and procedures to avoid any potential accidents or mishaps.
Consider using alternative signaling methods such as hand signa...read more
Q2. What is IPS and what is the importance of the system?
IPS stands for Intrusion Prevention System, it is a network security technology that monitors network and/or system activities for malicious activities or policy violations.
IPS is designed to prevent unauthorized access, misuse, modification, or denial of a computer network and network-accessible resources.
It can be hardware-based, software-based, or a combination of both.
IPS works by scanning network traffic in real-time, identifying and blocking suspicious activity.
It can a...read more
Q3. What is the capacity of Adani Power Jharkhand Limited power plant?
The capacity of Adani Power Jharkhand Limited power plant is 1600 MW.
The power plant has a capacity of 1600 MW.
It is located in Godda district of Jharkhand, India.
The plant uses supercritical technology for efficient power generation.
Q4. What is broad gauge, narrow gauge and what's the gauge reading for both
Broad gauge and narrow gauge are types of railway track gauges. Broad gauge has a wider distance between the rails compared to narrow gauge.
Broad gauge has a distance of 1,676 mm (5 ft 6 in) between the rails
Narrow gauge has a distance of less than 1,435 mm (4 ft 8 1/2 in) between the rails
Examples of broad gauge railways include Indian Railways and Russian Railways
Examples of narrow gauge railways include the Darjeeling Himalayan Railway in India and the White Pass and Yukon...read more
Q5. What is motor point and hand point, and difference?
Motor point and hand point are specific locations on the body where muscles can be stimulated for contraction. Motor points are specific to individual muscles, while hand points are specific to the hand muscles.
Motor points are specific locations on individual muscles where electrical stimulation can cause contraction.
Hand points are specific locations on the hand muscles where electrical stimulation can cause contraction.
Motor points vary depending on the muscle, while hand ...read more
Q6. What is the responsibility of Site Manager?
Site Manager is responsible for overseeing all operations at a construction site, ensuring safety, quality, and efficiency.
Overseeing all activities at the construction site
Ensuring safety regulations are followed
Managing resources and materials efficiently
Coordinating with subcontractors and suppliers
Communicating with stakeholders and clients
Resolving any issues or conflicts that arise
Maintaining project schedules and budgets
Q7. What is the work of shuntman, pointsman and C&W?
Shuntman, pointsman, and C&W are responsible for the safe movement of trains and maintenance of railway infrastructure.
Shuntman is responsible for moving wagons within a railway yard to form trains or to load/unload cargo.
Pointsman operates railway points or switches to control the direction of trains on different tracks.
C&W (Carriage and Wagon) staff are responsible for the maintenance and repair of railway carriages and wagons.
All three roles are crucial for ensuring the sm...read more
Q8. Whats is the work of S&T department in railway.
The S&T department in railways is responsible for signaling and telecommunication systems to ensure safe and efficient train operations.
Designing, installing, and maintaining signaling systems to control train movements
Managing telecommunication systems for communication between trains and control centers
Implementing safety measures such as automatic train protection systems
Monitoring and troubleshooting signal and communication issues
Collaborating with other departments for ...read more
Q9. What is compliance for bill submission?
Compliance for bill submission ensures that all necessary documentation and information is provided accurately and on time.
Ensure all required fields are filled out completely and accurately
Submit bills within the specified timeframe
Follow any specific formatting or submission guidelines provided by the organization
Keep track of submission deadlines and requirements
Maintain records of all submitted bills for future reference
Q10. Who is the coustom of Godda unit?
The custom of Godda unit refers to the specific practices and traditions followed by the employees and management at the Godda unit.
The custom of Godda unit may include daily safety briefings before starting work.
Employees at the Godda unit may have a tradition of celebrating birthdays or work anniversaries together.
There may be a specific way of reporting incidents or accidents at the Godda unit.
The custom of Godda unit could involve regular team-building activities or train...read more
Q11. Whats is the Role of PWI?
The Role of PWI (Permanent Way Inspector) is to ensure the safety and maintenance of railway tracks and infrastructure.
Inspecting railway tracks for defects and ensuring they meet safety standards
Supervising maintenance and repair work on tracks and infrastructure
Ensuring compliance with regulations and guidelines set by the railway authorities
Investigating accidents or incidents related to the railway tracks
Training and supervising track maintenance staff
Q12. Why dummy test perform?
Dummy tests are performed to ensure that all systems and processes are functioning correctly without impacting actual data or operations.
Dummy tests help identify any potential issues or bugs in the system before actual data is used.
They are used to validate the functionality of a system without risking real data.
Dummy tests can be used to simulate different scenarios and test the system's response.
They are essential for quality assurance and ensuring the reliability of the s...read more
Q13. What is shunt signal?
A shunt signal is a signal that bypasses a portion of a circuit or system.
Shunt signals are used to divert a portion of the main signal for specific purposes.
They are commonly used in electrical circuits to measure current by diverting a small portion of it through a shunt resistor.
Shunt signals can also be used in communication systems to bypass certain components for testing or troubleshooting purposes.
Q14. What is ISML ?
ISML stands for Integrated Site Management Log. It is a tool used in construction projects to track and manage site activities.
ISML helps in monitoring progress of construction activities
It assists in tracking resources and materials used on site
Provides a centralized platform for communication and documentation
Examples: Daily progress reports, resource allocation logs
Q15. What is bolster?
A bolster is a long, narrow pillow or cushion filled with cotton, down, or fiber, typically used for support or decoration.
Bolsters are often used in yoga for support during poses.
They can also be used as decorative pillows on beds or couches.
In medical settings, bolsters may be used to support a patient's body during certain procedures or treatments.
Q16. What is 5 S?
5S is a methodology used for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary items.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining the organized workplace.
Sustain: Ensure the new practice...read more
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month