Site Manager is responsible for overseeing all operations at a construction site, ensuring safety, quality, and efficiency.
Overseeing all activities at the construction site
Ensuring safety regulations are followed
Managing resources and materials efficiently
Coordinating with subcontractors and suppliers
Communicating with stakeholders and clients
Resolving any issues or conflicts that arise
Maintaining project schedules an
Compliance for bill submission ensures that all necessary documentation and information is provided accurately and on time.
Ensure all required fields are filled out completely and accurately
Submit bills within the specified timeframe
Follow any specific formatting or submission guidelines provided by the organization
Keep track of submission deadlines and requirements
Maintain records of all submitted bills for future ref
ISML stands for Integrated Site Management Log. It is a tool used in construction projects to track and manage site activities.
ISML helps in monitoring progress of construction activities
It assists in tracking resources and materials used on site
Provides a centralized platform for communication and documentation
Examples: Daily progress reports, resource allocation logs
Broad gauge and narrow gauge are types of railway track gauges. Broad gauge has a wider distance between the rails compared to narrow gauge.
Broad gauge has a distance of 1,676 mm (5 ft 6 in) between the rails
Narrow gauge has a distance of less than 1,435 mm (4 ft 8 1/2 in) between the rails
Examples of broad gauge railways include Indian Railways and Russian Railways
Examples of narrow gauge railways include the Darjeeli...
A bolster is a long, narrow pillow or cushion filled with cotton, down, or fiber, typically used for support or decoration.
Bolsters are often used in yoga for support during poses.
They can also be used as decorative pillows on beds or couches.
In medical settings, bolsters may be used to support a patient's body during certain procedures or treatments.
The S&T department in railways is responsible for signaling and telecommunication systems to ensure safe and efficient train operations.
Designing, installing, and maintaining signaling systems to control train movements
Managing telecommunication systems for communication between trains and control centers
Implementing safety measures such as automatic train protection systems
Monitoring and troubleshooting signal and com...
Dummy tests are performed to ensure that all systems and processes are functioning correctly without impacting actual data or operations.
Dummy tests help identify any potential issues or bugs in the system before actual data is used.
They are used to validate the functionality of a system without risking real data.
Dummy tests can be used to simulate different scenarios and test the system's response.
They are essential f...
Shuntman, pointsman, and C&W are responsible for the safe movement of trains and maintenance of railway infrastructure.
Shuntman is responsible for moving wagons within a railway yard to form trains or to load/unload cargo.
Pointsman operates railway points or switches to control the direction of trains on different tracks.
C&W (Carriage and Wagon) staff are responsible for the maintenance and repair of railway carriages ...
In such a situation, the train can be passed by using manual flagging and communication between the station staff and the train driver.
Use manual flagging by station staff to signal the train to proceed cautiously.
Ensure clear communication between station staff and train driver to coordinate the safe passage of the train.
Implement strict safety protocols and procedures to avoid any potential accidents or mishaps.
Consi...
A shunt signal is a signal that bypasses a portion of a circuit or system.
Shunt signals are used to divert a portion of the main signal for specific purposes.
They are commonly used in electrical circuits to measure current by diverting a small portion of it through a shunt resistor.
Shunt signals can also be used in communication systems to bypass certain components for testing or troubleshooting purposes.
The Role of PWI (Permanent Way Inspector) is to ensure the safety and maintenance of railway tracks and infrastructure.
Inspecting railway tracks for defects and ensuring they meet safety standards
Supervising maintenance and repair work on tracks and infrastructure
Ensuring compliance with regulations and guidelines set by the railway authorities
Investigating accidents or incidents related to the railway tracks
Training a
IPS stands for Intrusion Prevention System, it is a network security technology that monitors network and/or system activities for malicious activities or policy violations.
IPS is designed to prevent unauthorized access, misuse, modification, or denial of a computer network and network-accessible resources.
It can be hardware-based, software-based, or a combination of both.
IPS works by scanning network traffic in real-t...
The capacity of Adani Power Jharkhand Limited power plant is 1600 MW.
The power plant has a capacity of 1600 MW.
It is located in Godda district of Jharkhand, India.
The plant uses supercritical technology for efficient power generation.
The custom of Godda unit refers to the specific practices and traditions followed by the employees and management at the Godda unit.
The custom of Godda unit may include daily safety briefings before starting work.
Employees at the Godda unit may have a tradition of celebrating birthdays or work anniversaries together.
There may be a specific way of reporting incidents or accidents at the Godda unit.
The custom of Godda un...
5S is a methodology used for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary items.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintainin...
Top trending discussions
I applied via LinkedIn and was interviewed in Jul 2024. There were 7 interview rounds.
If vinay is 6 months old, how much old is his younger brother, 6 years different
About civil engineering, structure engineering, construction, bill of materials
About concrete, pro and cons
About Design Concrete
Case study leaning tower of pissa
My name is John Smith.
My first name is John
My last name is Smith
I go by the name John Smith
My name is John Smith.
Full name is John Smith
Common name
No middle name or initial
I am 28 years old.
I am currently 28 years old.
My age is 28.
I was born in 1993.
I applied via Job Fair and was interviewed in Nov 2023. There were 2 interview rounds.
In general, aptitude tests measure ones competence in logical reasoning, numerical skills, or verbal ability.
The approach to technical issues in civil engineering often involves analyzing the problem, considering various solutions, and selecting the most feasible option.
Identify the technical issue and its impact on the project
Analyze the possible solutions and their pros and cons
Consider factors such as cost, time, and resources
Consult with team members or experts for input
Select the most feasible solution and implement it
Mo
I was interviewed in Aug 2023.
Listen and speaking an explain
English grammar and speaking in english
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Naukri.com
Cement grade refers to the strength and quality of cement used in construction.
Cement grade is determined by the compressive strength of cement mortar cubes after 28 days of curing.
The most commonly used cement grades are 33, 43, and 53, indicating their respective compressive strengths in megapascals (MPa).
Higher cement grades are used for structures that require higher strength, such as bridges and high-rise building...
Yes, the standard size of a concrete cube is 15 cm × 15 cm × 15 cm.
The standard size of a concrete cube is used for testing the compressive strength of concrete.
The cubes are casted and cured for 28 days before testing.
The cubes are tested using a compression testing machine.
The compressive strength of concrete is calculated by dividing the maximum load applied to the cube by the cross-sectional area of the cube.
I applied via Company Website and was interviewed in Sep 2022. There were 2 interview rounds.
Curing is the process of maintaining moisture and temperature conditions for freshly placed concrete to promote its hydration and strength gain.
Curing is essential for the strength and durability of concrete.
It involves keeping the concrete moist and at a proper temperature for a specific period of time.
Curing can be done using various methods such as water curing, membrane curing, and steam curing.
The duration of curi...
The strength of cement depends on its grade and type.
The strength of cement is measured in terms of compressive strength.
The grade of cement determines its strength. Higher the grade, higher the strength.
Type of cement also affects its strength. For example, Portland cement has higher strength than lime cement.
The strength of cement is also influenced by factors such as curing time, temperature, and humidity.
Interview experience
based on 1 review
Rating in categories
Shift Incharge
4
salaries
| ₹4.6 L/yr - ₹5.8 L/yr |
Field Engineer
3
salaries
| ₹2.2 L/yr - ₹2.8 L/yr |
Senior Accounts Manager
3
salaries
| ₹4.8 L/yr - ₹5.2 L/yr |
Site Incharge
3
salaries
| ₹4.2 L/yr - ₹5.4 L/yr |
Senior Accountant
3
salaries
| ₹4.5 L/yr - ₹4.8 L/yr |
TCS
Accenture
Wipro
Cognizant