Filter interviews by
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
Top trending discussions
posted on 17 Jun 2021
I applied via LinkedIn and was interviewed in May 2021. There was 1 interview round.
posted on 9 Sep 2020
Sedimentation is the process of settling or deposition of suspended particles in water or wastewater.
It is a physical water treatment process.
It involves the use of gravity to separate solid particles from water.
Sedimentation tanks are used in water treatment plants to remove suspended solids.
It is also used in wastewater treatment to remove settleable solids before further treatment.
The settled solids are called sludg...
Flock is a process of adding chemicals to wastewater to create clusters of particles that can be easily removed.
Flock is used in wastewater treatment to remove suspended solids and other impurities.
Chemicals like alum or ferric chloride are added to wastewater to create flocs.
Flocs are clusters of particles that can be easily removed through sedimentation or filtration.
Flock is an important step in the wastewater treat...
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
posted on 13 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
Senior Engineer
232
salaries
| ₹3.6 L/yr - ₹9.1 L/yr |
Engineer
154
salaries
| ₹2.4 L/yr - ₹7.5 L/yr |
Civil Engineer
154
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Assistant Manager
150
salaries
| ₹4.6 L/yr - ₹11.1 L/yr |
Store Executive
66
salaries
| ₹2.4 L/yr - ₹5.4 L/yr |
L&T Construction
Simplex Infrastructures
ITD Cementation India
Ashoka Buildcon