Filter interviews by
posted on 9 Jun 2024
The latest formwork technology includes modular systems, self-climbing formwork, and digital solutions.
Modular formwork systems allow for easy customization and reusability.
Self-climbing formwork reduces labor costs and increases efficiency.
Digital solutions such as Building Information Modeling (BIM) improve accuracy and coordination on site.
I applied via Referral and was interviewed in May 2023. There were 3 interview rounds.
Minimum cover block sizes for footings, columns, beams, and slabs are essential for durability and strength.
Minimum cover block size for footings is 50mm
Minimum cover block size for columns is 40mm
Minimum cover block size for beams is 25mm
Minimum cover block size for slabs is 20mm
Extra bars are provided to beams for reinforcement and to increase their load-bearing capacity.
Extra bars help to prevent cracking and failure of the beam under heavy loads.
They also improve the ductility and toughness of the beam.
Extra bars are added based on the design requirements and load calculations.
They are usually placed at the bottom of the beam to resist tension forces.
Examples of extra bars include stirrups,
OPC is Ordinary Portland Cement and PPC is Portland Pozzolana Cement.
OPC is made from clinker and gypsum while PPC is made from clinker, gypsum, and pozzolanic material.
PPC has higher durability and strength than OPC.
PPC is more eco-friendly as it requires less energy to produce.
OPC is commonly used for general construction while PPC is used for structures that require high strength and durability.
PPC is also more resi...
The minimum depth of slab depends on various factors such as load, span, and type of slab.
The minimum depth of slab is generally 4 inches for residential buildings.
For commercial buildings, the minimum depth of slab is around 6 inches.
The depth of slab also depends on the type of slab, such as one-way or two-way slab.
The span of the slab and the load it will bear also affect the minimum depth.
The minimum depth of slab ...
Different tests for cement and concrete include compressive strength test, water absorption test, setting time test, and soundness test.
Compressive strength test measures the ability of cement or concrete to withstand pressure
Water absorption test measures the amount of water absorbed by cement or concrete
Setting time test measures the time taken for cement or concrete to set
Soundness test measures the ability of cemen...
Initial setting time is the time taken by concrete to harden to a certain degree, while final setting time is the time taken for it to completely harden.
Initial setting time is typically around 30 minutes to 1 hour
Final setting time is typically around 4 to 6 hours
Factors affecting setting time include temperature, humidity, and type of cement used
PPE stands for Personal Protective Equipment.
PPE is equipment worn to minimize exposure to hazards that may cause serious workplace injuries or illnesses.
Examples of PPE include safety glasses, gloves, hard hats, respirators, and safety shoes.
PPE should be selected based on the hazards present in the workplace.
Employers are responsible for providing PPE to their employees and ensuring that it is used properly.
Employees...
Standard brick size is 190mm x 90mm x 90mm and nominal brick size is 200mm x 100mm x 100mm.
Standard brick size is also known as actual brick size.
Nominal brick size is the size specified by the manufacturer.
Standard brick size is smaller than nominal brick size.
Standard brick size is used for calculation of brickwork.
Nominal brick size is used for estimation of materials required.
Frog is provided to the brick to prevent cracking and improve strength.
Frog creates a void in the brick which reduces the weight and improves insulation.
Frog also helps in better bonding of the mortar with the brick.
It prevents cracking by allowing the brick to expand and contract without breaking.
Frog also improves the strength of the brick by distributing the load evenly.
Example: Hollow bricks have larger frogs to in
I appeared for an interview in Jun 2019.
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
I applied via Naukri.com and was interviewed before Sep 2023. There were 2 interview rounds.
Left previous job for career growth opportunities. Last CTC was $60,000. Expectations include a challenging role with room for advancement.
Left for career growth opportunities
Last CTC was $60,000
Expectations include challenging role and room for advancement
Signature Global is a reputable company known for its quality construction and customer satisfaction.
Reputable company with a strong track record in quality construction
Focus on customer satisfaction and delivering projects on time
Innovative designs and modern amenities in their developments
Strong presence in the real estate market with successful projects like Signature Global City, Signature Global Park, etc.
Signature Global is a real estate company specializing in affordable housing projects in India.
Specializes in affordable housing projects
Operates in the real estate sector
Focused on providing quality homes at affordable prices
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
based on 3 interviews
Interview experience
based on 55 reviews
Rating in categories
Civil Site Engineer
21
salaries
| ₹1.1 L/yr - ₹4.2 L/yr |
Junior Engineer
15
salaries
| ₹1.2 L/yr - ₹3.7 L/yr |
Junior Engineer Civil
13
salaries
| ₹1.7 L/yr - ₹4.2 L/yr |
Quantity Surveyor
8
salaries
| ₹1.2 L/yr - ₹4.2 L/yr |
Electrical Engineer
7
salaries
| ₹1.5 L/yr - ₹3.2 L/yr |
Signature Global
Pittie Group
Advance India Projects
Vestian Global Workplace Services