Cube samplings as per IS Code refer to the process of collecting and testing concrete cubes for quality control purposes.
Cube samplings should be done as per IS 456:2000 code for plain and reinforced concrete.
The cubes are casted and cured as per standard procedures before testing.
The cubes are tested for compressive strength at 7 and 28 days.
The results of cube testing are used to assess the quality of concrete and ma
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
ACI 211.1 is the code of reference for concrete mix design.
ACI 211.1 is the standard practice for selecting proportions for normal, heavyweight, and mass concrete based on specified compressive strength.
Other codes of reference include ASTM C94, which provides standard specifications for ready-mixed concrete.
The mix design should also consider factors such as workability, durability, and exposure conditions.
The mix des...
Assistant Manager
711
salaries
| ₹7.2 L/yr - ₹18.5 L/yr |
Senior Executive
449
salaries
| ₹5.5 L/yr - ₹13.5 L/yr |
Manager
190
salaries
| ₹9 L/yr - ₹32 L/yr |
Sales Executive
117
salaries
| ₹1.8 L/yr - ₹9.1 L/yr |
Senior Manager
101
salaries
| ₹15 L/yr - ₹46 L/yr |
DLF
Sobha
Prestige Group
Brigade Group