Upload Button Icon Add office photos

Godrej & Boyce Manufacturing

Compare button icon Compare button icon Compare
3.9

based on 3.1k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Godrej & Boyce Manufacturing Project Engineer Interview Questions and Answers

Updated 9 Oct 2023

Godrej & Boyce Manufacturing Project Engineer Interview Experiences

2 interviews found

Project Engineer Interview Questions & Answers

user image Farhan Khan

posted on 21 Sep 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

Write 150 words on any one of the topic from given list. Like father of nation, favourite cricketer. Time limit is 10 minutes.

Round 3 - Aptitude Test 

40 marks question paper with negative marks. Time limit is 20 minutes.

Round 4 - Technical 

(1 Question)

  • Q1. Technical question from engineering.

I applied via Recruitment Consultant and was interviewed before Jan 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. 1.DTR structure details
  • Ans. 

    DTR structure refers to the Document Type Record structure used in project management.

    • DTR structure is a document management system used to organize project documents.

    • It includes a hierarchy of folders and subfolders for easy access and retrieval of documents.

    • Each document is assigned a unique identifier and metadata for tracking and version control.

    • Examples of documents in a DTR structure include project plans, specif

  • Answered by AI
  • Q2. 1.1km 11kv line bow.
  • Ans. 

    The question is unclear and requires more information.

    • Please provide more context or details about the 1.1km 11kv line bow.

    • What specific information are you looking for regarding the bow?

    • Without additional information, it is difficult to provide a meaningful answer.

  • Answered by AI
  • Q3. How many men power capability have u ?

Interview Preparation Tips

Interview preparation tips for other job seekers - NOT CRITICAL

Skills evaluated in this interview

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Count Number of Subsequences Problem Statement Given an array of ... read more
asked in Wipro
Q4. Mindbending Product Problem Statement You are given an array ARR ... read more
asked in Wipro
Q5. Difference between compiler and interpreter. Why do you apply to ... read more

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Oct 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Basic aptitude test related to your stream

Round 3 - Technical 

(1 Question)

  • Q1. Basic discussion about your technical profile
Round 4 - One-on-one 

(1 Question)

  • Q1. Discussion related to the product of previous company & basic discussion about the air conditioning
Round 5 - HR 

(1 Question)

  • Q1. Family discussion & CTC discuss

Interview Preparation Tips

Interview preparation tips for other job seekers - It's cool interview process
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What went well?
  • Q2. A powerful practice that focuses identifying and acknowledging the positive aspect, successes, and achievements within a project, task or situation
  • Q3. What was round 1
  • Q4. The first independent assessment of evidence by the applicant following registration
  • Q5. What was round 2
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Last company working detaila

I applied via Naukri.com and was interviewed in Jan 2022. There were 5 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Cv was sgortlisted via Naukri and am thankful to Naukri. I have applied for Sr. Manager role. Only one person came and explained about himself,project and organization. Then he asked to explain about mys...
  • Ans. Completly about what u hv written in you cv would be asked. Just walk through your experiences inbetween cross questions were there to check the truthness or not understand more clarity.
  • Answered Anonymously
Round 2 - Technical 

(1 Question)

  • Q1. Same like first round but with different person and depth of questions are more compating to first round. Questions related to your CV .
  • Ans. Dont try to manipulate, capture your real experiences in cv and talk only that. Whatever is unknow , be clear to tell that and show interest to learn and justiy how u hv learnt new things in your career.
  • Answered Anonymously
Round 3 - Technical 

(1 Question)

  • Q1. Technical plus management round The person is deciding auhority for this job offer. He was well prepared with my interviews so far. And asked out side of that and if some clarity was missing in those 2 ro...
Round 4 - HR 

(1 Question)

  • Q1. Typical HR interview , refer lots of interview question on HR round. Try to know more about company.
Round 5 - One-on-one 

(1 Question)

  • Q1. Just they wanted to see me inmperskn before they agree to offer me

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't bluff, let your CV reflect you. And you explains what you worked without manipulating.
Always show respect to their project, way of working. Show interest to learn and adapt if you are really can do it.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Be to the point and don't beat around the bush.
  • Q2. What does a PM do ?
  • Q3. What were your roles and responsibilities in the last org?
  • Q4. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. Tell me about the most difficult project that you managed

Interview Questionnaire 

3 Questions

  • Q1. HOW TO CALCULATE HEAT LOAD CALCULATION?
  • Ans. 

    Heat load calculation is done by determining the amount of heat energy required to maintain a desired temperature in a given space.

    • Determine the size of the space in square feet

    • Determine the desired temperature for the space

    • Determine the insulation value of the walls, ceiling, and floor

    • Determine the number of windows and doors and their insulation value

    • Calculate the heat loss through the walls, ceiling, floor, windows,...

  • Answered by AI
  • Q2. WHAT ARE THE TYPES OF FCU?
  • Ans. 

    FCU stands for Fan Coil Unit. There are two types of FCU - Horizontal and Vertical.

    • Horizontal FCU: mounted on the ceiling or floor, air is discharged horizontally

    • Vertical FCU: mounted on the wall, air is discharged vertically

    • Other types include cassette FCU, concealed FCU, and floor-standing FCU

    • FCUs are used for heating, cooling, and ventilation in buildings

  • Answered by AI
  • Q3. EXPLAIN VRV SYSTEM
  • Ans. 

    VRV system is a type of HVAC system that uses a single outdoor unit to control multiple indoor units.

    • VRV stands for Variable Refrigerant Volume

    • It uses a refrigerant to transfer heat between the indoor and outdoor units

    • Each indoor unit can be controlled independently for temperature and air flow

    • It is energy efficient and can save on utility costs

    • Examples of VRV system brands include Daikin, Mitsubishi, and LG

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE CONFIDANT AND GO FOR IT

I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is Project Management
  • Ans. 

    Project management is the process of planning, organizing, and overseeing the execution of a project from start to finish.

    • It involves defining project goals and objectives

    • Creating a detailed project plan

    • Assigning tasks and responsibilities to team members

    • Monitoring progress and making adjustments as needed

    • Ensuring that the project is completed on time, within budget, and to the satisfaction of stakeholders

  • Answered by AI
  • Q2. What is SDLC & different projects handled
  • Ans. 

    SDLC stands for Software Development Life Cycle. It is a process used to design, develop and test software.

    • SDLC is a framework that consists of several phases such as planning, analysis, design, implementation, testing, and maintenance.

    • Each phase has its own set of activities and deliverables that need to be completed before moving to the next phase.

    • Projects handled include developing a web-based application for a heal...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. My educational background and experience
  • Q2. My motivation, strength and hypothetical situations

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare well for the JD that you are applying for and be confident

Skills evaluated in this interview

Godrej & Boyce Manufacturing Interview FAQs

How many rounds are there in Godrej & Boyce Manufacturing Project Engineer interview?
Godrej & Boyce Manufacturing interview process usually has 4 rounds. The most common rounds in the Godrej & Boyce Manufacturing interview process are Resume Shortlist, Assignment and Aptitude Test.
How to prepare for Godrej & Boyce Manufacturing Project Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Godrej & Boyce Manufacturing. The most common topics and skills that interviewers at Godrej & Boyce Manufacturing expect are Erection Commissioning, Project Engineering and Substation.
What are the top questions asked in Godrej & Boyce Manufacturing Project Engineer interview?

Some of the top questions asked at the Godrej & Boyce Manufacturing Project Engineer interview -

  1. 1.DTR structure detai...read more
  2. 1.1km 11kv line b...read more
  3. Technical question from engineeri...read more

Tell us how to improve this page.

Godrej & Boyce Manufacturing Project Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Godrej & Boyce Manufacturing Project Engineer Salary
based on 146 salaries
₹2 L/yr - ₹10 L/yr
26% more than the average Project Engineer Salary in India
View more details

Godrej & Boyce Manufacturing Project Engineer Reviews and Ratings

based on 35 reviews

4.4/5

Rating in categories

4.2

Skill development

3.5

Work-life balance

3.9

Salary

4.0

Job security

4.0

Company culture

3.4

Promotions

4.0

Work satisfaction

Explore 35 Reviews and Ratings
Assistant Manager
1.3k salaries
unlock blur

₹4.2 L/yr - ₹12.2 L/yr

Deputy Manager
973 salaries
unlock blur

₹5.1 L/yr - ₹15 L/yr

Manager
358 salaries
unlock blur

₹7.8 L/yr - ₹22 L/yr

Senior Executive
232 salaries
unlock blur

₹3 L/yr - ₹10.6 L/yr

Associate Manager
226 salaries
unlock blur

₹7.4 L/yr - ₹18 L/yr

Explore more salaries
Compare Godrej & Boyce Manufacturing with

Tata Group

4.2
Compare

Mahindra & Mahindra

4.1
Compare

Kirloskar Group

4.1
Compare

Thermax Limited

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview