Filter interviews by
I applied via Approached by Company and was interviewed before Feb 2022. There were 2 interview rounds.
TBM can be transferred by disassembling it into smaller parts and using cranes or other lifting equipment to move them to the desired location.
Disassemble the TBM into smaller components
Use cranes or lifting equipment to move the components
Transport the components to the desired location
Reassemble the TBM at the new location
Quantity of different materials can be calculated by using appropriate formulas and measurements.
Determine the required quantity of each material based on the project specifications
Calculate the volume or weight of each material needed
Use appropriate formulas to calculate the quantity of materials needed
Consider factors such as waste, spillage, and shrinkage when calculating quantities
Examples include calculating the a...
I applied via Naukri.com and was interviewed before Jul 2021. There were 3 interview rounds.
Winding wire quantity can be found by calculating the length of wire required and the number of turns needed.
Calculate the length of wire required based on the size of the coil and the number of turns needed.
Determine the wire gauge and calculate the weight of wire required.
Consider the insulation thickness and add it to the wire diameter to get the total diameter of the wire.
Use the formula π x diameter x number of tu...
The standard size of brick is 190mm x 90mm x 90mm.
The size of brick may vary depending on the country or region.
In the United States, the standard size of brick is 203mm x 92mm x 57mm.
Bricks can also come in different shapes and sizes for specific purposes, such as bullnose bricks for rounded edges.
The size of brick affects the amount of mortar needed for construction.
The quantity of cement, sand, and aggregate can be found by using the mix design ratio and the volume of concrete required.
Determine the required volume of concrete
Determine the mix design ratio
Calculate the quantity of cement, sand, and aggregate using the mix design ratio and the volume of concrete
Consider the wastage factor while calculating the quantity
How to manage site, how much strenth of your current team like Manpower, machines etc.
Top trending discussions
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2020. There was 1 interview round.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Site Engineer
8
salaries
| ₹2.8 L/yr - ₹3.6 L/yr |
Field Engineer
3
salaries
| ₹4.2 L/yr - ₹4.2 L/yr |
Civil Site Engineer
3
salaries
| ₹2.4 L/yr - ₹3.9 L/yr |
TCS
Accenture
Wipro
Cognizant