I applied via Walk-in
Density of materials is a measure of how much mass is contained in a given volume.
Density is calculated by dividing the mass of a material by its volume.
Different materials have different densities.
Density is commonly measured in units such as grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
Materials with higher densities are generally heavier and more compact.
For example, lead has a high densit...
Tell me about urself
Gina Engineering Company interview questions for popular designations
I applied via Walk-in and was interviewed before Jul 2022. There were 2 interview rounds.
Rolling margin is the difference between the cost of goods sold and the selling price, calculated on a rolling basis.
Rolling margin helps in analyzing the profitability of a product over time.
It is calculated by subtracting the cost of goods sold from the selling price and dividing by the selling price.
For example, if the cost of goods sold is $50 and the selling price is $100, the rolling margin would be 50%.
Rate analysis involves calculating the cost of different items in a construction project, such as masonry works.
Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.
It involves breaking down the total cost into components like material cost, labor cost, equipment cost, and overheads.
For masonry works, the rate analysis would include calculating the cost of bricks, ce...
I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
Material estimate for concrete, mortar and unit weights.
Calculate the volume of concrete needed based on project specifications
Determine the mix ratio of concrete (e.g. 1:2:4 for cement:sand:aggregate)
Calculate the weight of each material based on unit weights (e.g. 150 lbs/cubic foot for concrete)
I applied via Walk-in and was interviewed before Aug 2020. There were 4 interview rounds.
IS code for measurements in site is IS 1200-1:1992
IS 1200-1:1992 is the code for measurement of buildings and civil engineering works
It provides guidelines for taking measurements and preparing bills of quantities
The code covers measurement of earthwork, concrete, brickwork, steelwork, and more
It also includes rules for rounding off measurements and calculating quantities
Adherence to IS 1200-1:1992 ensures accuracy and
Material quantity calculation for Plastering, Concrete and Mortar
Plastering material quantity is calculated based on the area to be plastered and the thickness of the plaster.
Concrete material quantity is calculated based on the volume required for the structure, considering the mix ratio and wastage.
Mortar material quantity is calculated based on the volume required for the masonry work, considering the mix ratio and ...
Concrete quantity for trapezoidal footing
Calculate the volume of the trapezoidal footing
Multiply the volume with the density of concrete to get the weight
Divide the weight by the unit weight of concrete to get the volume of concrete required
Add 5-10% extra concrete for wastage and spillage
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
I am currently working at a construction site in downtown city.
Construction site in downtown city
Working on a high-rise building project
Coordinating with architects, contractors, and workers
Ensuring adherence to safety regulations and project timelines
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed in Jan 2024. There were 2 interview rounds.
Experienced sales executive with a proven track record of exceeding targets and building strong client relationships.
Over 5 years of sales experience in the technology industry
Consistently met or exceeded sales targets by 20% each quarter
Built and maintained relationships with key clients such as ABC Company and XYZ Corporation
based on 11 interviews
Interview experience
based on 82 reviews
Rating in categories
Site Engineer
42
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Quantity Surveyor
25
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Civil Site Engineer
18
salaries
| ₹1.8 L/yr - ₹4.6 L/yr |
Safety Officer
13
salaries
| ₹1.8 L/yr - ₹5.3 L/yr |
Quantity Survey Engineer
9
salaries
| ₹3 L/yr - ₹6.6 L/yr |
Knight Frank
Berkadia
Xanadu
R.S. Infraprojects