I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
Material estimate for concrete, mortar and unit weights.
Calculate the volume of concrete needed based on project specifications
Determine the mix ratio of concrete (e.g. 1:2:4 for cement:sand:aggregate)
Calculate the weight of each material based on unit weights (e.g. 150 lbs/cubic foot for concrete)
Top trending discussions
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.
Project is the overall task or objective to be completed within a specific timeframe.
Project engineering focuses on the technical aspects such as planning, designing, and executing the project.
Project management involves coordinating resources and tas...
Types of services in interior fitout include design, construction, project management, and installation.
Design services involve creating layouts, selecting materials, and creating 3D visualizations.
Construction services include building partitions, ceilings, and flooring.
Project management services involve coordinating schedules, budgets, and contractors.
Installation services include fitting furniture, fixtures, and eq...
Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.
Delays in material delivery can impact project timelines and budgets
Inclement weather can halt work progress and cause safety concerns
Coordination issues between different teams can lead to misunderstandings and errors
Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.
Agreement is a mutual understanding between two or more parties.
A bond is a legal document that guarantees the fulfillment of obligations.
Agreements are usually informal and may not always be legally binding.
Bonds are formal and legally enforceable documents.
Examples of agreements include contra...
posted on 3 Jul 2024
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 4 interview rounds.
1.5 hour hackerEarth test
Design system is crucial for consistency, efficiency, and scalability in software development.
Ensures consistency in UI/UX across products and platforms
Promotes reusability of components and patterns
Facilitates collaboration between design and development teams
Increases efficiency by streamlining the design and development process
Helps in scaling the product by providing a structured framework for growth
Caching system improves performance by storing frequently accessed data in memory.
Caching reduces the need to fetch data from the server, improving load times.
Common caching systems include Redis, Memcached, and browser caching.
Caching can be implemented at various levels such as browser, CDN, and server-side.
Examples of cached data in frontend include images, CSS files, and API responses.
Managing people in a team involves effective communication, setting clear expectations, providing support, and fostering a positive work environment.
Communicate openly and regularly with team members to ensure everyone is on the same page
Set clear goals and expectations for each team member to work towards
Provide support and resources to help team members succeed in their roles
Foster a positive work environment by prom...
I communicate delays and requirements by providing clear updates, setting realistic expectations, and actively listening to feedback.
Provide regular updates on progress and any delays that may impact timelines
Clearly communicate any changes in requirements or scope
Set realistic expectations for delivery timelines and potential challenges
Actively listen to feedback and address any concerns or questions promptly
wework offers a collaborative and innovative work environment with opportunities for growth and networking.
Collaborative workspaces foster creativity and teamwork
Access to a global network of professionals for networking and collaboration
Opportunities for career growth and development through various programs and resources
Seeking new challenges and opportunities for growth
Desire for new challenges and opportunities for growth
Looking for a more innovative and dynamic work environment
Wanted to work on cutting-edge technologies or projects
I am motivated by the opportunity to solve complex problems and create innovative solutions.
I am driven by a passion for technology and a desire to constantly learn and improve my skills.
I find satisfaction in overcoming challenges and seeing the impact of my work on the end users.
Collaborating with a talented team and working towards a common goal motivates me to perform at my best.
Feeling unappreciated and lack of communication frustrates me in life.
Lack of recognition for hard work
Poor communication in personal relationships
Being taken for granted by others
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
I am currently working at a construction site in downtown city.
Construction site in downtown city
Working on a high-rise building project
Coordinating with architects, contractors, and workers
Ensuring adherence to safety regulations and project timelines
posted on 8 Mar 2024
I applied via Campus Placement
Test is for 3 hours including coding, mcq and aptitude.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Site Engineer
42
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Quantity Surveyor
25
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Civil Site Engineer
18
salaries
| ₹1.8 L/yr - ₹4.6 L/yr |
Safety Officer
13
salaries
| ₹1.8 L/yr - ₹5.3 L/yr |
Quantity Survey Engineer
9
salaries
| ₹3 L/yr - ₹6.6 L/yr |
Knight Frank
Berkadia
Xanadu
R.S. Infraprojects