Q1. Material quantity calculation for Plastering, Concrete and Mortar
Material quantity calculation for Plastering, Concrete and Mortar
Plastering material quantity is calculated based on the area to be plastered and the thickness of the plaster.
Concrete material quantity is calculated based on the volume required for the structure, considering the mix ratio and wastage.
Mortar material quantity is calculated based on the volume required for the masonry work, considering the mix ratio and wastage.
For example, to calculate the quantity of plasteri...read more
Q2. What is rolling margin
Rolling margin is the difference between the cost of goods sold and the selling price, calculated on a rolling basis.
Rolling margin helps in analyzing the profitability of a product over time.
It is calculated by subtracting the cost of goods sold from the selling price and dividing by the selling price.
For example, if the cost of goods sold is $50 and the selling price is $100, the rolling margin would be 50%.
Q3. Rate analysis of different items ex: masonry works
Rate analysis involves calculating the cost of different items in a construction project, such as masonry works.
Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.
It involves breaking down the total cost into components like material cost, labor cost, equipment cost, and overheads.
For masonry works, the rate analysis would include calculating the cost of bricks, cement, sand, labor, and other associated costs.
Rate analysi...read more
Q4. IS code for measurements in site
IS code for measurements in site is IS 1200-1:1992
IS 1200-1:1992 is the code for measurement of buildings and civil engineering works
It provides guidelines for taking measurements and preparing bills of quantities
The code covers measurement of earthwork, concrete, brickwork, steelwork, and more
It also includes rules for rounding off measurements and calculating quantities
Adherence to IS 1200-1:1992 ensures accuracy and consistency in site measurements
Q5. Concrete quantity for trapezoidal footing
Concrete quantity for trapezoidal footing
Calculate the volume of the trapezoidal footing
Multiply the volume with the density of concrete to get the weight
Divide the weight by the unit weight of concrete to get the volume of concrete required
Add 5-10% extra concrete for wastage and spillage
Q6. Material estimate for concrete, mortar and unit weights.
Material estimate for concrete, mortar and unit weights.
Calculate the volume of concrete needed based on project specifications
Determine the mix ratio of concrete (e.g. 1:2:4 for cement:sand:aggregate)
Calculate the weight of each material based on unit weights (e.g. 150 lbs/cubic foot for concrete)
Q7. Density of materials
Density of materials is a measure of how much mass is contained in a given volume.
Density is calculated by dividing the mass of a material by its volume.
Different materials have different densities.
Density is commonly measured in units such as grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
Materials with higher densities are generally heavier and more compact.
For example, lead has a high density of 11.34 g/cm³, while styrofoam has a low density of abo...read more