Upload Button Icon Add office photos

Filter interviews by

GENERAL CONSTRUCTION COMPANY Interview Questions and Answers

Updated 5 Feb 2024

GENERAL CONSTRUCTION COMPANY Interview Experiences

Popular Designations

3 interviews found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About Water Pump stp etp wtp

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir, I have done the work of STP setup for 14 years, I have the sage to open my own form too.

Water Treatment Plant Operator Interview Questions asked at other Companies

Q1. How does it effluent water treatment, it likes to drinking water?
View answer (1)

Quantity Surveyor Interview Questions & Answers

user image Suhail Khan3103

posted on 5 Feb 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Explain briefly about quantity surveying, Quantification methods ,different types of contracts ,
  • Ans. 

    Quantity surveying involves quantification methods and different types of contracts.

    • Quantity surveying is a profession that deals with the measurement and estimation of construction materials, labor, and costs.

    • Quantification methods in quantity surveying include taking off, abstracting, and billing.

    • Taking off is the process of measuring quantities from drawings or specifications.

    • Abstracting involves summarizing the qua...

  • Answered by AI

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

Interview Questionnaire 

4 Questions

  • Q1. If I hire you , what can I expect from you ?
  • Ans. I cannot Promise something extra ordinary as every one says , but I know my capabilities and I will make you proud to say that " I am the person who hired him"
  • Answered Anonymously
  • Q2. What is the best quality do you think you have ?
  • Ans. You can trust me 100% .
  • Answered Anonymously
  • Q3. What company can expect from you ?
  • Ans. Value for money - what you pay me you will get the result with profit
  • Answered Anonymously
  • Q4. What you you think you are Bad in or your negative qualities?
  • Ans. I will say the truth, mostly people donot like that .
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Think , even if the interviewer is the owner of the company - he is just doing his work only because he need your help to achieve his targets or ambitions , so you are going to help him not he helps you . he just pays for your efforts.

Workshop Manager Interview Questions asked at other Companies

Q1. 4. Which certificate can be issued after cabin interior refurbishment.
View answer (1)

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. Working purpos
  • Q2. How to E. T. S work
  • Ans. 

    ETS (Educational Testing Service) is a non-profit organization that develops and administers standardized tests.

    • ETS develops and administers tests like the GRE, TOEFL, and Praxis exams.

    • The organization also offers research and assessment services for educational institutions.

    • ETS uses computer-based testing and scoring for many of its exams.

    • The organization has faced criticism for its role in the standardized testing in

  • Answered by AI

Interview Questionnaire 

4 Questions

  • Q1. What is Google sheets
  • Ans. 

    Google Sheets is a cloud-based spreadsheet program offered by Google as part of the Google Drive office suite.

    • Allows users to create and edit spreadsheets online

    • Offers collaboration features for real-time editing and commenting

    • Can import and export various file formats, including Microsoft Excel

    • Offers add-ons and scripts for automation and customization

    • Accessible from any device with internet connection

  • Answered by AI
  • Q2. What is the MDD & OMC of soil
  • Ans. 

    MDD & OMC are important parameters for soil compaction and moisture content.

    • MDD stands for Maximum Dry Density, which is the maximum density that can be achieved for a given soil compaction effort.

    • OMC stands for Optimum Moisture Content, which is the moisture content at which the maximum dry density can be achieved.

    • These parameters are important for determining the appropriate moisture content and compaction effort for...

  • Answered by AI
  • Q3. What is the velocity of steel
  • Ans. 

    The velocity of steel varies depending on the type and conditions.

    • The velocity of steel can range from 5000 to 6000 meters per second

    • The velocity of steel can be affected by factors such as temperature and pressure

    • The velocity of steel is important in industries such as construction and manufacturing

  • Answered by AI
  • Q4. What is the cube test result in 7 days
  • Ans. 

    The cube test result in 7 days depends on the purpose of the test and the specific cube being tested.

    • The cube test can refer to various tests in different fields such as construction, engineering, and materials science.

    • For example, in construction, the cube test is used to determine the compressive strength of concrete cubes after 7 days of curing.

    • The result of the cube test can vary depending on factors such as the ty...

  • Answered by AI

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Previous Project experience. Execution plan, Job responsibility, Technical for Electrical SLD, Chiller SLD, Functional test for all MEP items.

Interview Preparation Tips

Interview preparation tips for other job seekers - Try to give correct answer, What you have mentioned in your CV the same question will be raise from Technical Board...

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your experience and ur self like education etc
  • Q2. What do you work in your profile.
  • Q3. Can you handle RVNL project
  • Ans. 

    Yes, I have experience in handling RVNL projects.

    • I have previously managed a similar railway project

    • I am familiar with the processes and regulations involved

    • I have a strong team to support me

    • I am confident in my ability to deliver the project on time and within budget

  • Answered by AI

I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. What is the previous job role ?
  • Q2. What is the percentage of bitumen in DBM ?
  • Ans. 

    The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.

    • DBM stands for Dense Bituminous Macadam, which is a type of road construction material.

    • The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.

    • The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.

    • Higher percentages of bitumen a...

  • Answered by AI
  • Q3. Why you want change your company ?
  • Q4. What is your salary expectation ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't expect genuine to salary hike, really so sad to genuine salary negotiation Person .

I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. ELSR MEANS

Interview Preparation Tips

Interview preparation tips for other job seekers - Elevated service level Reservoir

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.

GENERAL CONSTRUCTION COMPANY Interview FAQs

How many rounds are there in GENERAL CONSTRUCTION COMPANY interview?
GENERAL CONSTRUCTION COMPANY interview process usually has 1-2 rounds. The most common rounds in the GENERAL CONSTRUCTION COMPANY interview process are Resume Shortlist, Technical and One-on-one Round.
What are the top questions asked in GENERAL CONSTRUCTION COMPANY interview?

Some of the top questions asked at the GENERAL CONSTRUCTION COMPANY interview -

  1. Explain briefly about quantity surveying, Quantification methods ,different typ...read more
  2. About Water Pump stp etp ...read more

Tell us how to improve this page.

GENERAL CONSTRUCTION COMPANY Interview Process

based on 4 interviews

Interview experience

4.8
  
Excellent
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
Tata Projects Interview Questions
4.2
 • 447 Interviews
KEC International Interview Questions
4.0
 • 308 Interviews
Tata Technologies Interview Questions
3.6
 • 261 Interviews
TCE Interview Questions
3.7
 • 251 Interviews
View all

GENERAL CONSTRUCTION COMPANY Reviews and Ratings

based on 34 reviews

3.8/5

Rating in categories

3.9

Skill development

3.7

Work-life balance

3.6

Salary

3.5

Job security

3.6

Company culture

3.2

Promotions

3.5

Work satisfaction

Explore 34 Reviews and Ratings
Project Engineer
6 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Site Engineer
6 salaries
unlock blur

₹1.8 L/yr - ₹5.3 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹1 L/yr - ₹3 L/yr

Project Manager
5 salaries
unlock blur

₹2.4 L/yr - ₹48.4 L/yr

Principal Analyst
5 salaries
unlock blur

₹11 L/yr - ₹15.2 L/yr

Explore more salaries
Compare GENERAL CONSTRUCTION COMPANY with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview