Quantity Surveyor Interview Questions & Answers

user image Suhail Khan3103

posted on 5 Feb 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Explain briefly about quantity surveying, Quantification methods ,different types of contracts ,
  • Ans. 

    Quantity surveying involves quantification methods and different types of contracts.

    • Quantity surveying is a profession that deals with the measurement and estimation of construction materials, labor, and costs.

    • Quantification methods in quantity surveying include taking off, abstracting, and billing.

    • Taking off is the process of measuring quantities from drawings or specifications.

    • Abstracting involves summarizing the qua...

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Dec 2023.

Round 1 - Technical 

(5 Questions)

  • Q1. What is the standard deduction as per IS 1200?
  • Ans. 

    The standard deduction as per IS 1200 is a fixed amount that can be deducted from the measured quantities of certain items in a construction project.

    • The standard deduction is typically used for items like scaffolding, formwork, and centering in construction projects.

    • It is a fixed percentage of the measured quantity, usually ranging from 2% to 5% depending on the item and project.

    • The purpose of the standard deduction is...

  • Answered by AI
  • Q2. Steel reconciliation
  • Q3. Material properties
  • Ans. 

    Material properties refer to the characteristics and behavior of materials used in construction projects.

    • Material properties include density, strength, durability, thermal conductivity, and elasticity.

    • Understanding material properties is crucial for selecting the right materials for a project.

    • Examples of material properties affecting construction include water absorption in concrete and thermal expansion in metals.

  • Answered by AI
  • Q4. Price escalation
  • Q5. Rate Analysis, Budgeting, Client billing
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Sap IDM nolage
  • Q2. Personal interview
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. IS code for BBS
  • Ans. 

    IS code for BBS is IS 1786:2008

    • IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement

    • BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction

    • Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects

  • Answered by AI
  • Q2. Previous project scope and type of project
  • Q3. Tell about previous project scope and rate type of project etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Learnt about IS code for RCC,Prestress concrete and steel

I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about your roles and responsibilities as Quantity Surveyor

Interview Preparation Tips

Interview preparation tips for other job seekers - everything detailed will be asked on what is written on resume

I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About myself , my previous employer
  • Q2. My family background
Round 3 - Technical 

(2 Questions)

  • Q1. About my previous company job responsibilities
  • Q2. About my working knowledge

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Quantity Surveyor interview:
  • Technical Skills
Interview preparation tips for other job seekers - Good experience about interview with HR & technical round

I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What is cost to complete
  • Ans. 

    Cost to complete refers to the estimated amount of money required to finish a project or task.

    • Cost to complete is an important metric used in project management and quantity surveying.

    • It takes into account the remaining work, resources, and expenses needed to complete a project.

    • It helps in assessing the financial status of a project and making informed decisions.

    • Cost to complete can be calculated by subtracting the act...

  • Answered by AI
  • Q2. Unit weight of various steel bars
  • Ans. 

    Unit weight of steel bars varies based on their diameter and length.

    • The weight of steel bars is measured in kilograms per meter (kg/m).

    • The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.

    • For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your technical knowledge and basic strong and be confident

Interview Questionnaire 

9 Questions

  • Q1. What is rolling margin
  • Ans. 

    Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.

    • Rolling margin is used to measure the profitability of a business or project.

    • It helps in assessing the efficiency of operations and identifying areas for cost reduction.

    • The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.

    • For e...

  • Answered by AI
  • Q2. What will you do if the site qty differ from Drawing qty
  • Ans. 

    If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.

    • I will review the drawings and specifications to ensure accuracy.

    • I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.

    • I will conduct a site visit to physically verify the quantities and compare them with the drawings.

    • If there are significant differences, I ...

  • Answered by AI
  • Q3. Tell me about ur self
  • Q4. What is reconciliation of steel
  • Ans. 

    Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.

    • Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.

    • It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...

  • Answered by AI
  • Q5. What is the procedure for BBS
  • Ans. 

    BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.

    • BBS is prepared based on the structural drawings and specifications.

    • It includes the diameter, length, shape, and number of reinforcement bars required for the element.

    • BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.

    • It is an essential document for t...

  • Answered by AI
  • Q6. How you do the rate analysis
  • Ans. 

    Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.

    • Rate analysis involves breaking down the cost of each item in a construction project.

    • The cost of materials, labor, and equipment is analyzed to determine the overall cost.

    • Quantities of each item are measured and multiplied by their respective rates to calculate the cost.

    • Rate analysis helps in estimating ...

  • Answered by AI
  • Q7. What is margin for OH & Profits in Rate analysis
  • Ans. 

    Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.

    • Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.

    • It is usually expressed as a percentage of the direct cost.

    • The margin for OH & Profits varies depending on the nature of the project and market conditions.

    • For example, if the direct cost of a proje...

  • Answered by AI
  • Q8. Wastage % for Reinforcement Steel
  • Ans. 

    The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.

    • Wastage percentage for reinforcement steel is typically estimated between 2-5%.

    • Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.

    • Proper planning, accurate cutting, and careful handling can help minimize wastage.

    • Examples of wastage include incorrect cu...

  • Answered by AI
  • Q9. Code for Structural steel and reinforced steel
  • Ans. 

    The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).

    • Structural steel is commonly used in the construction of buildings, bridges, and other structures.

    • The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.

    • Reinforced steel, also known as reba...

  • Answered by AI

I applied via Company Website and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Aptitude Test 

Some basic questions of mathematics up to 10th class.

Round 3 - HR 

(3 Questions)

  • Q1. Current company role and responsibility
  • Q2. Why are you change your current company
  • Q3. What is your current salary and what's you accept to us

Interview Preparation Tips

Interview preparation tips for other job seekers - Please keep in mind iscode 1200 and cpwd specification volume1 and 2.

I applied via Approached by Company

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Hdpe pipe and supervisor
  • Ans. 

    HDPE pipe is a type of plastic pipe used for water supply and drainage systems. A supervisor oversees the installation and maintenance of the pipes.

    • HDPE pipes are lightweight and flexible, making them easy to install and transport.

    • They are resistant to corrosion and chemicals, making them ideal for use in harsh environments.

    • Supervisors ensure that the pipes are installed correctly and that any issues are addressed prom...

  • Answered by AI
  • Q2. History and political science
  • Q3. Science general knowledge
Round 3 - Group Discussion 

XXXXX

Interview Preparation Tips

Interview preparation tips for other job seekers - Suresh pal tikamgarh XXXXX

GENERAL CONSTRUCTION COMPANY Interview FAQs

How many rounds are there in GENERAL CONSTRUCTION COMPANY Quantity Surveyor interview?
GENERAL CONSTRUCTION COMPANY interview process usually has 1 rounds. The most common rounds in the GENERAL CONSTRUCTION COMPANY interview process are One-on-one Round.

Tell us how to improve this page.

GENERAL CONSTRUCTION COMPANY Quantity Surveyor Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
GENERAL CONSTRUCTION COMPANY Quantity Surveyor Salary
based on 4 salaries
₹7 L/yr - ₹10.6 L/yr
61% more than the average Quantity Surveyor Salary in India
View more details

GENERAL CONSTRUCTION COMPANY Quantity Surveyor Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

2.0

Work-life balance

4.0

Salary

3.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Project Engineer
6 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Site Engineer
6 salaries
unlock blur

₹1.8 L/yr - ₹5.3 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹1 L/yr - ₹3 L/yr

Project Manager
5 salaries
unlock blur

₹2.4 L/yr - ₹48.4 L/yr

Principal Analyst
5 salaries
unlock blur

₹11 L/yr - ₹15.2 L/yr

Explore more salaries
Compare GENERAL CONSTRUCTION COMPANY with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview