Quantity surveying involves quantification methods and different types of contracts.
Quantity surveying is a profession that deals with the measurement and estimation of construction materials, labor, and costs.
Quantification methods in quantity surveying include taking off, abstracting, and billing.
Taking off is the process of measuring quantities from drawings or specifications.
Abstracting involves summarizing the qua...
Top trending discussions
posted on 21 Dec 2024
I was interviewed before Dec 2023.
The standard deduction as per IS 1200 is a fixed amount that can be deducted from the measured quantities of certain items in a construction project.
The standard deduction is typically used for items like scaffolding, formwork, and centering in construction projects.
It is a fixed percentage of the measured quantity, usually ranging from 2% to 5% depending on the item and project.
The purpose of the standard deduction is...
Material properties refer to the characteristics and behavior of materials used in construction projects.
Material properties include density, strength, durability, thermal conductivity, and elasticity.
Understanding material properties is crucial for selecting the right materials for a project.
Examples of material properties affecting construction include water absorption in concrete and thermal expansion in metals.
posted on 6 Jul 2024
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
IS code for BBS is IS 1786:2008
IS 1786:2008 is the Indian Standard code for specifications of high strength deformed steel bars for concrete reinforcement
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars with their lengths and shapes required for construction
Following IS 1786:2008 ensures the quality and strength of the reinforcement bars used in construction projects
posted on 17 Apr 2022
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
Rolling margin is a financial term that refers to the difference between the revenue generated and the variable costs incurred over a specific period of time.
Rolling margin is used to measure the profitability of a business or project.
It helps in assessing the efficiency of operations and identifying areas for cost reduction.
The formula for calculating rolling margin is: (Revenue - Variable Costs) / Revenue * 100.
For e...
If the site quantity differs from the drawing quantity, I will take the following steps to address the issue.
I will review the drawings and specifications to ensure accuracy.
I will communicate with the project team, including the architect and engineer, to clarify any discrepancies.
I will conduct a site visit to physically verify the quantities and compare them with the drawings.
If there are significant differences, I ...
Reconciliation of steel involves comparing the actual quantity of steel used in a construction project with the estimated quantity.
Reconciliation of steel is a process used in construction projects to ensure that the actual quantity of steel used matches the estimated quantity.
It involves comparing the quantity of steel recorded in the project's documentation, such as drawings and specifications, with the quantity of s...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a concrete element.
BBS is prepared based on the structural drawings and specifications.
It includes the diameter, length, shape, and number of reinforcement bars required for the element.
BBS helps in estimating the quantity of steel required and also ensures the correct placement of reinforcement bars.
It is an essential document for t...
Rate analysis is done by breaking down the cost of each item in a construction project to determine the overall cost.
Rate analysis involves breaking down the cost of each item in a construction project.
The cost of materials, labor, and equipment is analyzed to determine the overall cost.
Quantities of each item are measured and multiplied by their respective rates to calculate the cost.
Rate analysis helps in estimating ...
Margin for OH & Profits in rate analysis is the additional amount added to cover overhead costs and generate profit.
Margin for OH & Profits is added to the direct cost of a project to cover indirect costs and generate profit.
It is usually expressed as a percentage of the direct cost.
The margin for OH & Profits varies depending on the nature of the project and market conditions.
For example, if the direct cost of a proje...
The wastage percentage for reinforcement steel varies depending on factors such as project complexity and workmanship.
Wastage percentage for reinforcement steel is typically estimated between 2-5%.
Factors such as project complexity, workmanship, and site conditions can affect the wastage percentage.
Proper planning, accurate cutting, and careful handling can help minimize wastage.
Examples of wastage include incorrect cu...
The code for structural steel is typically governed by the American Institute of Steel Construction (AISC) while reinforced steel is governed by the American Concrete Institute (ACI).
Structural steel is commonly used in the construction of buildings, bridges, and other structures.
The AISC provides standards and guidelines for the design, fabrication, and erection of structural steel.
Reinforced steel, also known as reba...
posted on 24 Sep 2022
I applied via Company Website and was interviewed before Sep 2021. There were 3 interview rounds.
Some basic questions of mathematics up to 10th class.
posted on 9 Apr 2022
I applied via Approached by Company
HDPE pipe is a type of plastic pipe used for water supply and drainage systems. A supervisor oversees the installation and maintenance of the pipes.
HDPE pipes are lightweight and flexible, making them easy to install and transport.
They are resistant to corrosion and chemicals, making them ideal for use in harsh environments.
Supervisors ensure that the pipes are installed correctly and that any issues are addressed prom...
XXXXX
Interview experience
based on 1 review
Rating in categories
Project Engineer
6
salaries
| ₹6 L/yr - ₹12 L/yr |
Site Engineer
6
salaries
| ₹1.8 L/yr - ₹5.3 L/yr |
Civil Site Engineer
6
salaries
| ₹1 L/yr - ₹3 L/yr |
Project Manager
5
salaries
| ₹2.4 L/yr - ₹48.4 L/yr |
Principal Analyst
5
salaries
| ₹11 L/yr - ₹15.2 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures