Filter interviews by
I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.
Top trending discussions
I applied via campus placement at Indian Institute of Technology (IIT), Mumbai and was interviewed in Dec 2022. There were 2 interview rounds.
The unit weight of steel is typically around 7850 kg/m^3.
The unit weight of steel is commonly used in construction and engineering to calculate the weight of steel structures.
The unit weight of steel is typically around 7850 kg/m^3, but can vary depending on the type of steel.
For example, the unit weight of stainless steel is around 7480 kg/m^3, while the unit weight of carbon steel is around 7850 kg/m^3.
CTC stands for Cost to Company, which includes all expenses related to an employee's salary and benefits.
CTC includes salary, bonuses, benefits, and any other perks provided by the company.
It is the total amount of money a company spends on an employee in a year.
CTC is different from take-home salary as it includes all expenses incurred by the company for the employee.
Employer's contribution to PF, insurance, and other...
The number of solar panels used in a group depends on the energy requirements and available space.
The number of solar panels in a group is determined by the total energy consumption of the group.
Factors such as location, orientation, shading, and efficiency of the panels also impact the number of solar panels needed.
For example, a residential group may require 20-30 solar panels, while a commercial group may need hundr...
posted on 26 Jan 2024
I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.
The question is likely asking about the use of Building Information Modeling (BIM) and software development in civil engineering projects.
BIM (Building Information Modeling) is a process that involves creating and managing digital representations of physical and functional characteristics of places.
BIM software like Autodesk Revit, Bentley MicroStation, and Tekla Structures are commonly used in civil engineering for de...
Cement is composed of limestone, clay, silica, iron ore, and gypsum. Reinforcement materials include steel and fiberglass.
Cement composition: limestone, clay, silica, iron ore, gypsum
Reinforcement materials: steel, fiberglass
JSA stands for Job Safety Analysis and HIRA stands for Hazard Identification and Risk Assessment.
JSA is a process of identifying potential hazards in a job task and determining the best way to perform the task safely.
HIRA involves identifying hazards, assessing the risks associated with those hazards, and implementing control measures to mitigate the risks.
Both JSA and HIRA are important tools in ensuring workplace saf...
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
Scheduling in instrumentation and control for rotating equipment involves creating a detailed plan to ensure proper maintenance and operation.
Develop a detailed schedule outlining maintenance tasks for each piece of rotating equipment
Coordinate with operations and maintenance teams to ensure minimal downtime during maintenance activities
Utilize software tools such as CMMS to track maintenance activities and schedule fu...
Surge control in compressor is essential to prevent damage and maintain efficiency.
Surge control involves monitoring and adjusting the flow rate of the compressor to prevent surging.
Methods for surge control include using anti-surge valves, recycle valves, and variable speed drives.
Surge control systems often use sensors to detect changes in pressure and flow rate, triggering adjustments to prevent surging.
Proper surge...
Synchronisation in generators is the process of matching the voltage, frequency, and phase angle of multiple generators before connecting them in parallel.
Synchronisation ensures that the generators are operating in sync to prevent damage or power loss.
Key factors for synchronisation include voltage, frequency, and phase angle matching.
Synchronisation is typically done using synchronising lamps, synchroscopes, or autom...
I applied via Company Website and was interviewed in Oct 2021. There were 5 interview rounds.
Seeking new challenges and growth opportunities.
Looking for a company that aligns better with my career goals.
Desire to work on more complex projects.
Seeking a better work-life balance.
Company downsizing or restructuring.
Limited opportunities for advancement or professional development.
Relocation or personal reasons.
I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.
Production Engineer
33
salaries
| ₹2 L/yr - ₹4.4 L/yr |
Assistant Manager
31
salaries
| ₹4.3 L/yr - ₹8 L/yr |
Quality Engineer
22
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Civil Site Engineer
22
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Site Engineer
13
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Himalaya Wellness
TCS
Reliance Industries
Infosys