I applied via Referral
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
LD for column refers to Liquidated Damages for delay in completing the column construction.
LD stands for Liquidated Damages.
It is a predetermined amount of money that the contractor will pay to the client in case of delay in completing the project.
LD for column specifically refers to the amount of money that will be deducted for each day of delay in constructing the column.
The LD amount is usually mentioned in the cont...
The mix ratio of M20 grade of concrete is 1:1.5:3.
The mix ratio of M20 grade of concrete means the proportion of cement, sand, and aggregate used in the concrete mix.
For M20 grade concrete, the mix ratio is 1 part cement : 1.5 parts sand : 3 parts aggregate.
This means that for every 1 part of cement, 1.5 parts of sand, and 3 parts of aggregate are used.
For example, if you have 1 bag of cement (50 kg), you would need 1....
The unit weight of steel varies depending on its type and grade.
The unit weight of steel is typically measured in pounds per cubic foot (lb/ft³) or kilograms per cubic meter (kg/m³).
The unit weight of common structural steel ranges from 490 to 7850 pounds per cubic foot (7850 to 12600 kg/m³).
For example, the unit weight of mild steel is approximately 490 pounds per cubic foot (7850 kg/m³).
The clear cover for a beam is the distance between the outer surface of the beam and the nearest surface of the concrete cover.
Clear cover is important to protect the reinforcement from corrosion and fire.
The clear cover for beams is typically specified in construction drawings or codes.
The clear cover can vary depending on the type of beam and its exposure conditions.
For example, in a residential building, the clear c...
The height of a parapet wall varies depending on its purpose and location.
The height of a parapet wall is typically determined by building codes and regulations.
In residential buildings, parapet walls are usually around 3 feet tall to provide safety and privacy.
In commercial or industrial buildings, parapet walls can be higher to serve as a barrier against noise, wind, or to hide rooftop equipment.
Historical buildings ...
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.
Deduction in shuttering criteria is done to reduce the cost of construction.
It is also done to reduce the time taken for construction.
The deduction is usually done based on the strength of the concrete being used.
For example, if the concrete strength is high, less shuttering material is required.
The deduct...
I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.
Stone/Tile flooring/Cladding is measured in square meters or square feet depending on the unit of measurement used.
Measure the length and width of the area to be covered with stone/tile flooring/cladding
Multiply the length by the width to get the total square meters or square feet
Account for any cuts or wastage in the calculation
Consider the pattern or design of the flooring/cladding when measuring
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
SBU is Strategic Business Unit, BU is Business Unit, and Carpet area is the total area of a building excluding walls and other non-usable spaces.
SBU is a standalone business entity within a larger organization, focusing on a specific market segment.
BU is a division or department within a company that operates independently but is still part of the larger organization.
Carpet area refers to the total usable area of a bui...
I appeared for an interview in Oct 2021.
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Architect
17
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Civil Site Engineer
15
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
MEP Engineer
10
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
CRM Executive
10
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
Site Engineer
8
salaries
| ₹3.6 L/yr - ₹6 L/yr |
Signature Global
Balaji Enterprises
Sunteck Realty
Pittie Group