Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by G R Infraprojects Team. If you also belong to the team, you can get access from here

G R Infraprojects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

G R Infraprojects Deputy Manager Quality Interview Questions and Answers

Updated 16 Aug 2023

G R Infraprojects Deputy Manager Quality Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Design mix details , grouting, QAP ITP, Shotcrete, batching plant etc..
  • Q2. They only ask how will reduce cost of project
Round 3 - Technical 

(1 Question)

  • Q1. I have not face 2nd round

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell us about yourself and your work experiences
  • Ans. 

    I am a dedicated quality professional with 5+ years of experience in managing quality control processes and ensuring compliance with industry standards.

    • Managed quality control processes to ensure products met industry standards

    • Implemented quality improvement initiatives to enhance product quality

    • Led cross-functional teams to address quality issues and drive continuous improvement

    • Developed and implemented quality assura...

  • Answered by AI
  • Q2. Explain Design mix of concrete
  • Ans. 

    Design mix of concrete refers to the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Design mix involves selecting the type and quality of materials such as cement, aggregates, and water.

    • Proportions of each material are determined based on the desired strength, workability, and durability of the concrete.

    • Factors like environmental conditions, const...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview round is very well structured
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Steel density, steel lap zone in column & beam, steel weight formula
  • Q2. Mivan shuttering, full plywood weight, table formwork
  • Q3. Excavation slope, aggregate density, cement density, mix design, compressive strength of cement & concrete, slump test,free flow concrete
Round 2 - BOQ 

(2 Questions)

  • Q1. Item wise rate analysis
  • Q2. How to manage lose Making item
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Motor replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old motor remove and new motor replace and bolts nut tightening s...
  • Q2. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and blumber block top cover open and old slue Barring remove and new slue...
  • Q3. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tig...
  • Q4. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old v -scraper remove and new v-scraper replace and bolts nut...
  • Q5. Barring greasing work and safety first and all ppes sure and paper work and walked away clean and fresh and Greasing gun and all pulley checking and savings Greasing work and sure and paper work cancelled
  • Q6. Discharge Chute replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and old discharge chute remove and new discharge chute repl...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Reason of job change
  • Q2. Why I hire you
Round 2 - Technical 

(2 Questions)

  • Q1. Describe the work profile
  • Q2. Reconciliation process of Raw material
  • Ans. 

    Reconciliation process of raw material involves comparing the physical inventory with the recorded inventory to identify discrepancies.

    • Verify the accuracy of raw material receipts and usage records

    • Compare physical inventory counts with the recorded inventory levels

    • Investigate and resolve any discrepancies found

    • Update inventory records accordingly

    • Implement controls to prevent future discrepancies

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Maintenance protocols, Safety Tools and safety protocols, Electrical troubleshootings and fault analysis, basic electrical engineering questioneries, panel and motors protection questions, generator and av...
  • Q2. Basic electrical engineering
  • Q3. Power system interlocks and protection codes
  • Q4. Troubleshootings and fault analysis

Interview Preparation Tips

Topics to prepare for GVK Group Deputy Manager interview:
  • Protection system
  • Power system
  • Communication skills
  • Electricals
Interview preparation tips for other job seekers - Keep prepared & confident.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Group Discussion - Operation & Maintenance

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. How can we receive Materials to store and what is the basic procedure
  • Ans. 

    Materials can be received through purchase orders, deliveries, or transfers. The basic procedure involves receiving, inspecting, documenting, and storing the materials.

    • Materials can be received through purchase orders placed with suppliers.

    • Deliveries can be made directly to the storage location or to a designated receiving area.

    • Materials can also be received through transfers from other departments or locations.

    • The bas...

  • Answered by AI
  • Q2. Procedure of client material receipt/BOQ Items
  • Ans. 

    Client material receipt/BOQ items procedure involves thorough inspection, documentation, and verification.

    • Upon receipt of client materials, conduct thorough inspection for damages or discrepancies.

    • Document all received items in a log or system for tracking purposes.

    • Verify received items against the Bill of Quantities (BOQ) to ensure accuracy.

    • Report any issues or discrepancies to the relevant stakeholders for resolution...

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Construction safety standards
Round 3 - HR 

(1 Question)

  • Q1. Why you wants to left your previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answer those questions which u know the best

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Contracts roles ans responsibilities
  • Q2. Past career Experience and Current Roles duties

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Calm and Cool, express what you are actually. Don't buzz across bushes.
No one is after you, Full time with Nice panel. HR manager will Full cooperation and advise.

G R Infraprojects Interview FAQs

How many rounds are there in G R Infraprojects Deputy Manager Quality interview?
G R Infraprojects interview process usually has 3 rounds. The most common rounds in the G R Infraprojects interview process are Technical and Resume Shortlist.
How to prepare for G R Infraprojects Deputy Manager Quality interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at G R Infraprojects. The most common topics and skills that interviewers at G R Infraprojects expect are Quality Audit, Quality Inspection, Quality Procedures and Sample Inspection.
What are the top questions asked in G R Infraprojects Deputy Manager Quality interview?

Some of the top questions asked at the G R Infraprojects Deputy Manager Quality interview -

  1. Design mix details , grouting, QAP ITP, Shotcrete, batching plant et...read more
  2. They only ask how will reduce cost of proj...read more
  3. I have not face 2nd ro...read more

Tell us how to improve this page.

G R Infraprojects Deputy Manager Quality Interview Process

based on 1 interview

Interview experience

3
  
Average
View more
G R Infraprojects Deputy Manager Quality Salary
based on 4 salaries
₹11 L/yr - ₹12 L/yr
12% more than the average Deputy Manager Quality Salary in India
View more details

G R Infraprojects Deputy Manager Quality Reviews and Ratings

based on 2 reviews

2.8/5

Rating in categories

2.4

Skill development

2.4

Work-life balance

2.4

Salary

1.8

Job security

2.4

Company culture

2.4

Promotions

2.4

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
288 salaries
unlock blur

₹4.4 L/yr - ₹11.5 L/yr

Senior Engineer
226 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Engineer
136 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Deputy Manager
124 salaries
unlock blur

₹6.6 L/yr - ₹17.5 L/yr

Structural Engineer
123 salaries
unlock blur

₹2 L/yr - ₹6.3 L/yr

Explore more salaries
Compare G R Infraprojects with

Nagarjuna Construction Company

4.1
Compare

PNC Infratech

3.9
Compare

Ashoka Buildcon

4.0
Compare

IRB Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview