Filter interviews by
I applied via Approached by Company and was interviewed in Jun 2022. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Feb 2023. There were 4 interview rounds.
Accounts and English
I applied via Referral and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via LinkedIn and was interviewed in Mar 2024. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Aug 2020. There was 1 interview round.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Assistant Manager
310
salaries
| ₹6.3 L/yr - ₹16 L/yr |
Senior Leader Engineer
275
salaries
| ₹5 L/yr - ₹11.6 L/yr |
Lead Engineer
168
salaries
| ₹3.5 L/yr - ₹11.1 L/yr |
Deputy Manager
164
salaries
| ₹8.5 L/yr - ₹20.6 L/yr |
Manager
91
salaries
| ₹10 L/yr - ₹24.5 L/yr |
OPPO
LG Electronics
Cargill
AECOM