Filter interviews by
I applied via Referral and was interviewed in Aug 2020. There were 4 interview rounds.
Top trending discussions
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 4 May 2019
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
based on 2 reviews
Rating in categories
Assistant Manager
102
salaries
| ₹3 L/yr - ₹9.8 L/yr |
Senior Engineer
65
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Site Engineer
51
salaries
| ₹2 L/yr - ₹5.6 L/yr |
Field Engineer
46
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Civil Engineer
44
salaries
| ₹2.2 L/yr - ₹8.5 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company