7QC is a quality control tool used to identify and solve problems in a production process.
7QC stands for Seven Quality Control tools
These tools are used to identify and solve problems in a production process
The seven tools are: Pareto chart, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart
Each tool is used to analyze different aspects of the production process
For example, ...
I applied via Campus Placement and was interviewed in Sep 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There were 2 interview rounds.
I want to join JTEKT because of their reputation for innovation and commitment to excellence in the production engineering field.
JTEKT has a strong reputation for innovation and cutting-edge technology in the production engineering industry.
I am impressed by JTEKT's commitment to excellence and continuous improvement in their products and processes.
I believe that working at JTEKT will provide me with valuable opportuni...
7 QC is a set of quality control tools used in manufacturing to identify and solve production problems.
7 QC stands for Seven Quality Control tools
These tools include Pareto analysis, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart
They are used to analyze data, identify root causes of problems, and make informed decisions for process improvement
PPL stands for Production Per Labour and PPLH stands for Production Per Labour Hour.
PPL is a measure of how much production is achieved per unit of labor input.
PPLH is a measure of how much production is achieved per labor hour.
Both metrics are used to evaluate the efficiency of production processes.
For example, if a factory produces 100 units with 10 workers, the PPL would be 10 units per worker.
If the same factory op...
posted on 22 Jun 2024
I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.
Assembly BIW production process involves various parameters to ensure weld quality.
Ensure proper fit-up of components before welding
Maintain correct welding parameters such as voltage, current, and travel speed
Use appropriate shielding gas and welding consumables
Regularly inspect and maintain welding equipment
Implement quality control measures such as visual inspection and non-destructive testing
posted on 16 Oct 2024
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
The project involved designing and implementing a new production process to improve efficiency and reduce costs.
Identify areas for improvement in current production process
Research and analyze different production methods and technologies
Design and implement new production process
Test and optimize the new process for efficiency and cost-effectiveness
Overcoming is the act of successfully dealing with or overcoming a challenge, obstacle, or difficulty.
Identifying the challenge or obstacle
Developing a plan or strategy to address it
Taking action to implement the plan
Persisting through setbacks or failures
Learning from the experience to improve future outcomes
I have a proven track record of successfully managing production processes and teams, resulting in increased efficiency and quality.
I have X years of experience in production management, including overseeing scheduling, budgeting, and quality control.
I have a strong understanding of lean manufacturing principles and have implemented strategies to streamline production processes.
I have a track record of improving produc...
I applied via Walk-in
5s and TPM are methodologies used in manufacturing to improve efficiency and productivity.
5s stands for Sort, Set in order, Shine, Standardize, Sustain. It is a method for organizing the workplace to improve efficiency and safety.
TPM stands for Total Productive Maintenance. It is a method for maximizing the effectiveness of equipment by involving all employees in the maintenance process.
Example: Implementing 5s in a pr...
Motors convert electrical energy into mechanical energy, while generators convert mechanical energy into electrical energy.
Motors use electricity to produce motion, while generators use motion to produce electricity
Motors have a rotor that spins within a stator, while generators have a rotor that is turned by an external force
Examples of motors include electric fans and washing machines, while examples of generators in
Senior Engineer
20
salaries
| ₹3.6 L/yr - ₹6.1 L/yr |
Oprating Engineer
18
salaries
| ₹1.9 L/yr - ₹3 L/yr |
Assistant Manager
17
salaries
| ₹5.7 L/yr - ₹11.1 L/yr |
Production Engineer
14
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Senior Executive
14
salaries
| ₹3.5 L/yr - ₹7 L/yr |
Bharat Forge
Mahindra & Mahindra
Tata Motors
Ashok Leyland