Filter interviews by
I applied via Walk-in
5s and TPM are methodologies used in manufacturing to improve efficiency and productivity.
5s stands for Sort, Set in order, Shine, Standardize, Sustain. It is a method for organizing the workplace to improve efficiency and safety.
TPM stands for Total Productive Maintenance. It is a method for maximizing the effectiveness of equipment by involving all employees in the maintenance process.
Example: Implementing 5s in a pr...
Top trending discussions
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
The company production refers to the manufacturing and output of products or services by the company.
Company production refers to the quantity and quality of goods or services produced.
It includes the manufacturing process, assembly, packaging, and delivery of products.
Production can also involve the provision of services, such as software development or consulting.
The company's production may vary depending on factors...
Shock absorbers are devices used in vehicles to absorb and dampen the impact of bumps and vibrations.
Absorb and dampen the impact of bumps and vibrations
Improve vehicle stability and control
Enhance driver and passenger comfort
Reduce wear and tear on other vehicle components
Maintain tire contact with the road surface
Prevent excessive bouncing and bouncing
Provide consistent handling and braking
Examples: coilover shocks,
I applied via Campus Placement and was interviewed in Mar 2023. There were 3 interview rounds.
Company registration and work responsibility, sefty ,5Setc.
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 3 interview rounds.
To reduce the rating of FMEA, focus on improving the severity, occurrence, and detection ratings. Cp and CPK are used to measure process capability.
To reduce FMEA rating, address high severity issues first
Implement controls to reduce the likelihood of high occurrence failure modes
Enhance detection methods to catch potential issues early
Calculate Cp and CPK to assess process capability and make improvements as needed
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
The 7 QC tools are a set of basic tools used for quality control and problem-solving in manufacturing and other industries.
Check sheet: Used to collect and analyze data in a systematic manner.
Histogram: A graphical representation of data distribution.
Pareto chart: Helps identify the most significant factors contributing to a problem.
Cause-and-effect diagram (Fishbone diagram): Used to identify and analyze potential cau...
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Sep 2022. There were 4 interview rounds.
Overall about your interview and personality,way of discussion and attitude,how to explain your answer and reactions.
I applied via Campus Placement and was interviewed before Jun 2023. There were 3 interview rounds.
General aptitude , general knowledge
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
64
salaries
| ₹5.8 L/yr - ₹16.6 L/yr |
Quality Engineer
47
salaries
| ₹1.5 L/yr - ₹4.3 L/yr |
Oprating Engineer
44
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Production Engineer
41
salaries
| ₹1.5 L/yr - ₹4.7 L/yr |
Senior Engineer
38
salaries
| ₹6 L/yr - ₹10.5 L/yr |
Bosch
Faurecia
Hitachi Astemo
Valeo