Site Engineer Interview Questions & Answers

user image Anonymous

posted on 16 Nov 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in May 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Welding related questions
  • Q2. Personal questions
Round 2 - Assignment 

Engineering related questions

Round 3 - One-on-one 

(3 Questions)

  • Q1. About previous experience
  • Q2. How confident of myself in this position.
  • Q3. Relocation to allocate site
  • Ans. 

    I am willing to relocate for the right opportunity to work on site as a Site Engineer.

    • I am open to relocating to different cities or countries for the job.

    • I understand that site engineers often need to be on-site to oversee construction projects.

    • I am excited about the opportunity to work on diverse projects in new locations.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Initially it was difficult later we had a good discussion and came to a good conclusion with lots of new learning.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(4 Questions)

  • Q1. Power plant operation And maintenance
  • Q2. Thermal power plant operation
  • Ans. 

    Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.

    • Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.

    • The steam is used to rotate a turbine, which drives a generator to produce electricity.

    • The process involves several components such as boilers, turbines, condensers, and cooling towers.

    • Thermal power plants require a constan...

  • Answered by AI
  • Q3. Personal and operation
  • Q4. Plant operation

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of d...
  • Ans. 

    Sample interview questions for Site Engineer position

    • BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications

    • Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase

    • Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement

    • Full form of TMT ...

  • Answered by AI
  • Q2. 1.introduction your self 2.Why you choose civil engineering? 3.whats ur salary expections? 4.Why u leave previous company?

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Civil Engineering
  • Concrete technology
  • Bmc
  • Quantity Surveyor Activities
Interview preparation tips for other job seekers - Prepare properly and crack interview because not hard question. Firstly 50 marks question paper provide and give you 30 minutes and after getting more than 25 then personal interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Tell me about previous project
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about steel ,concrete
  • Ans. 

    Steel and concrete are commonly used construction materials in civil engineering.

    • Steel is an alloy of iron and carbon, known for its high strength and durability.

    • Concrete is a composite material made of cement, water, and aggregates, used for its compressive strength and versatility.

    • Steel is commonly used in structural elements like beams, columns, and reinforcement bars.

    • Concrete is used for foundations, slabs, walls, ...

  • Answered by AI

I applied via Campus Placement and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Whats is a gsb tollrance
  • Ans. 

    GSB tolerance refers to the acceptable level of deviation from the specified requirements in the GSB (Granular Sub Base) layer of a construction project.

    • GSB tolerance determines the allowable variation in thickness, compaction, and gradation of the GSB layer.

    • It is important to adhere to the specified GSB tolerance to ensure the stability and durability of the road or pavement.

    • For example, if the GSB tolerance for compa...

  • Answered by AI
  • Q2. Please explained the bumping removing process
  • Ans. 

    Bumping removing process is a method used to eliminate or reduce the occurrence of bumps or uneven surfaces on a construction site.

    • Bumping removing process involves identifying and addressing the causes of bumps or uneven surfaces on the site.

    • Common causes of bumps include improper compaction of soil, uneven grading, or the presence of debris.

    • The process may include activities such as regrading, compacting the soil, re...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice job & company hr barbrik project limited raipur my first attempted sending resume accepted here but I love hr recall back process
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(4 Questions)

  • Q1. Power plant operation And maintenance
  • Q2. Thermal power plant operation
  • Ans. 

    Thermal power plant operation involves the generation of electricity using heat energy from burning fossil fuels.

    • Thermal power plants use fossil fuels like coal, oil, or natural gas to produce steam.

    • The steam is used to rotate a turbine, which drives a generator to produce electricity.

    • The process involves several components such as boilers, turbines, condensers, and cooling towers.

    • Thermal power plants require a constan...

  • Answered by AI
  • Q3. Personal and operation
  • Q4. Plant operation
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How many year experience
  • Q2. What about drainage contraction knowledge
  • Ans. 

    Drainage contraction knowledge is essential for a Site Engineer to ensure proper water flow and prevent flooding.

    • Understanding of drainage systems and their components

    • Knowledge of local regulations and standards for drainage design

    • Ability to calculate drainage capacity and slope requirements

    • Experience in designing and implementing drainage solutions

    • Familiarity with different types of drainage materials and their proper

  • Answered by AI

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Excavation
  • Concrete
  • Shuttering
  • Steel
Interview preparation tips for other job seekers - Make it last option.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Tell me about previous project
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about steel ,concrete
  • Ans. 

    Steel and concrete are commonly used construction materials in civil engineering.

    • Steel is an alloy of iron and carbon, known for its high strength and durability.

    • Concrete is a composite material made of cement, water, and aggregates, used for its compressive strength and versatility.

    • Steel is commonly used in structural elements like beams, columns, and reinforcement bars.

    • Concrete is used for foundations, slabs, walls, ...

  • Answered by AI

I applied via Walk-in and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Civil basic question

Interview Preparation Tips

Interview preparation tips for other job seekers - 1 St written exam 100 marks
2 nd Ms office
3 rd Excell

I applied via Walk-in

Round 1 - Technical 

(2 Questions)

  • Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of d...
  • Ans. 

    Sample interview questions for Site Engineer position

    • BBS calculation of slab involves calculating the number of steel bars required for the slab based on the design specifications

    • Staircase riser and tread dimensions are determined based on the height of the floor and the desired slope of the staircase

    • Types of cement include Ordinary Portland Cement, Rapid Hardening Cement, and Sulphate Resisting Cement

    • Full form of TMT ...

  • Answered by AI
  • Q2. 1.introduction your self 2.Why you choose civil engineering? 3.whats ur salary expections? 4.Why u leave previous company?

Interview Preparation Tips

Topics to prepare for RPP Infra Projects Site Engineer interview:
  • Civil Engineering
  • Concrete technology
  • Bmc
  • Quantity Surveyor Activities
Interview preparation tips for other job seekers - Prepare properly and crack interview because not hard question. Firstly 50 marks question paper provide and give you 30 minutes and after getting more than 25 then personal interview.

Expo Gas Containers Interview FAQs

How many rounds are there in Expo Gas Containers Site Engineer interview?
Expo Gas Containers interview process usually has 3 rounds. The most common rounds in the Expo Gas Containers interview process are HR, Assignment and One-on-one Round.
What are the top questions asked in Expo Gas Containers Site Engineer interview?

Some of the top questions asked at the Expo Gas Containers Site Engineer interview -

  1. Relocation to allocate s...read more
  2. Welding related questi...read more

Tell us how to improve this page.

Expo Gas Containers Site Engineer Salary
based on 5 salaries
₹2.1 L/yr - ₹3.6 L/yr
25% less than the average Site Engineer Salary in India
View more details

Expo Gas Containers Site Engineer Reviews and Ratings

based on 3 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

4.9

Promotions/Appraisal

5.0

Work Satisfaction

Explore 3 Reviews and Ratings
QA QC Engineer
7 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Site Engineer
5 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Safety Officer
5 salaries
unlock blur

₹1.8 L/yr - ₹3 L/yr

Production Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Junior Accountant
4 salaries
unlock blur

₹1.8 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Expo Gas Containers with

GAMMON INDIA

3.9
Compare

RPP Infra Projects

3.8
Compare

Techno Electric & Engineering Company

4.0
Compare

SPML Infra

3.5
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview