i
Essar Group
Filter interviews by
I appeared for an interview in Oct 2024.
Seeking new opportunities and challenges in a different location.
Looking for a change of scenery and new experiences
Opportunity for personal and professional growth
Exploring different cultures and environments
Seeking better work-life balance or cost of living
Family reasons or personal preferences for a new location
I manage contract management by ensuring all contracts are reviewed, negotiated, and executed efficiently.
Developing and maintaining a contract management system
Reviewing contracts to ensure compliance with company policies and legal requirements
Negotiating contract terms and conditions with vendors or clients
Tracking contract milestones and deadlines
Communicating with stakeholders to ensure contract fulfillment
Resolvi...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
posted on 24 Mar 2020
I applied via Naukri.com and was interviewed in Feb 2020. There were 3 interview rounds.
I have 5 years of experience in the Oil & Gas sector, specifically in the Operations department.
I have worked in the Operations department of an oil and gas company for 5 years.
During my time in the sector, I have gained extensive knowledge of the operational processes and procedures involved in oil and gas production.
I have successfully managed various projects related to drilling, production optimization, and cost re...
Preparation of RA bill involves gathering all relevant information and creating a detailed invoice for goods or services provided.
Gather all necessary information such as product or service details, quantity, and pricing
Create a detailed invoice with clear descriptions and itemized costs
Include any applicable taxes or discounts
Ensure accuracy and completeness of the bill before submitting to the client
Follow up with th
I applied via Approached by Company and was interviewed before Aug 2023. There were 2 interview rounds.
Discussion about my working and experience on site
There were three main structures in my last project: a database structure, a software architecture structure, and a project management structure.
Database structure included tables, relationships, and indexes.
Software architecture structure involved layers, components, and modules.
Project management structure consisted of timelines, tasks, and resources.
There were a total of 10 type foundation castings in my last project.
There were different types of foundation castings used in the project such as pile foundation, strip foundation, and raft foundation.
Each type of foundation casting was used based on the specific requirements of the structure and soil conditions.
The number of each type of foundation casting was determined by the structural design and engineering calcu
posted on 22 Oct 2023
I applied via Approached by Company and was interviewed before Oct 2022. There were 3 interview rounds.
posted on 2 Feb 2023
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
Discussed about experience, discussed about technical and professional skills
Good attitude and best interview procedure
posted on 22 Jun 2021
I applied via Campus Placement and was interviewed in May 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
83
salaries
| ₹2.2 L/yr - ₹8.4 L/yr |
Deputy Manager
75
salaries
| ₹4.7 L/yr - ₹14 L/yr |
Manager
73
salaries
| ₹7.3 L/yr - ₹25 L/yr |
Senior Manager
44
salaries
| ₹9.5 L/yr - ₹30.2 L/yr |
Deputy General Manager
19
salaries
| ₹13 L/yr - ₹45.5 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures