I applied via Approached by Company and was interviewed in Dec 2024. There was 1 interview round.
I applied via Company Website
I am a dedicated and experienced buyer with a strong background in procurement and negotiation.
Over 5 years of experience in purchasing and sourcing materials
Skilled in vendor management and contract negotiation
Strong analytical and problem-solving skills
Proficient in inventory management and cost reduction strategies
Contract procurement involves the process of acquiring goods or services through a formal agreement with a supplier.
Key elements include defining requirements and specifications
Identifying potential suppliers
Negotiating terms and conditions
Drafting and finalizing the contract
Managing supplier performance
Yes, I have experience in contract procurement.
I have successfully negotiated contracts with vendors for goods and services.
I have experience in reviewing and analyzing contract terms and conditions.
I have managed contract renewals and amendments as needed.
I managed the sourcing and purchasing of goods and services to meet company needs and goals.
Negotiated contracts with suppliers to ensure best pricing and terms
Analyzed market trends to make informed purchasing decisions
Managed vendor relationships to ensure timely delivery and quality products
Implemented cost-saving strategies to improve procurement efficiency
I applied via campus placement at Lbs Institute of Technology For Women, Thiruvananthapuram and was interviewed in Jul 2024. There were 2 interview rounds.
Logical and quants like percentage, clock hand, coding decoding
posted on 12 Dec 2024
I applied via Naukri.com and was interviewed in Nov 2024. There were 4 interview rounds.
I worked on a project to optimize production processes by implementing automation and improving efficiency.
Implemented automation systems to streamline production processes
Analyzed data to identify bottlenecks and inefficiencies
Collaborated with cross-functional teams to implement solutions
Improved production output by 20% within 6 months
The stress-strain diagram for R15 material shows the relationship between stress and strain for that specific material.
The stress-strain diagram typically consists of a linear elastic region, a yield point, plastic deformation, and ultimate failure.
R15 material may exhibit different characteristics compared to other materials, so the specific diagram would show its unique behavior.
The diagram helps engineers understand...
Tolerance refers to the allowable deviation from a specified dimension or value in engineering.
Tolerance is important in manufacturing to ensure that parts fit together properly.
It is typically specified as a range, such as +/- 0.1mm.
Tolerance can be applied to dimensions, angles, surface finishes, and other characteristics.
For example, a hole may have a tolerance of +/- 0.05mm to allow for variations in the drilling p
A portrait engine diesel engine is a type of internal combustion engine with a capacity typically ranging from 1.5L to 3.0L and a compression ratio of around 16:1.
Portrait engine diesel engines are commonly used in passenger cars and light-duty trucks.
They are known for their fuel efficiency and torque output.
Examples of portrait engine diesel engines include the Ford EcoBlue 2.0L and the Volkswagen TDI 1.6L.
The high c...
Basic questions, profit loss
Environment. Women empowerment smart work it is the topics of the GD.
Basic codes. Basic in changing coding like adding subtraction loops etc.
I applied via Naukri.com and was interviewed in Oct 2024. There were 4 interview rounds.
Aptitude test are used in schools, by employers, and to help individuals make careers
Group discussion is a structured conversation where people exchange ideas and opinions on a topic
The reporter disappeared on an assignment in the war zone
posted on 13 Dec 2024
Agile is an iterative approach to project management, while waterfall is a linear approach.
Agile is iterative and allows for flexibility and changes throughout the project.
Waterfall is a linear approach where each phase must be completed before moving on to the next.
Agile focuses on delivering working software in short iterations, while waterfall follows a sequential process from requirements to testing and deployment.
I handle agile waterfall projects by blending the flexibility of agile with the structure of waterfall.
I create a hybrid approach that combines the iterative nature of agile with the sequential phases of waterfall.
I prioritize requirements and plan sprints while also defining clear milestones and deliverables.
I ensure constant communication and collaboration among team members to adapt to changes while staying on track...
Managed a large-scale construction project using the waterfall methodology
Developed a detailed project plan outlining all tasks and dependencies
Assigned specific roles and responsibilities to team members
Implemented a strict change control process to minimize scope creep
Conducted regular status meetings to track progress and address any issues
Completed the project on time and within budget
Data centre setup should evolve with advancements in technology and increasing demands for storage and processing power.
Regularly assess and upgrade hardware to ensure optimal performance
Implement virtualization to maximize resource utilization
Utilize cloud services for scalability and flexibility
Enhance security measures to protect sensitive data
Consider energy efficiency and sustainability in design
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
posted on 26 Nov 2024
I applied via Campus Placement
It was related to Aptitude MCQ and 2-coding test
A palindrome of a number is a number that remains the same when its digits are reversed.
To check if a number is a palindrome, reverse the number and compare it with the original number.
Examples: 121 is a palindrome, 123 is not a palindrome.
Merging two linked lists involves combining the elements of both lists into a single list.
Create a new linked list to store the merged elements
Traverse through both linked lists and add elements to the new list
Handle cases where one list is longer than the other
Supply chain management involves the coordination and optimization of all activities involved in the sourcing, procurement, production, and logistics of goods and services.
Involves the coordination of suppliers, manufacturers, distributors, and retailers
Focuses on optimizing processes to minimize costs and maximize efficiency
Includes activities such as inventory management, demand forecasting, and transportation planni...
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
based on 15 reviews
Rating in categories
Manager
4
salaries
| ₹10 L/yr - ₹10.1 L/yr |
QA QC Engineer
4
salaries
| ₹7.1 L/yr - ₹14.4 L/yr |
Civil Site Engineer
3
salaries
| ₹4.6 L/yr - ₹4.6 L/yr |
Project Engineer Mechanical
3
salaries
| ₹1 L/yr - ₹2 L/yr |
TriGeo Technologies
Venus Industrial Corporation
Parsons International
Jayasree Techno Solutions