Filter interviews by
Top management site with interview Boards
Handling full operations involves effective planning, coordination, and communication to ensure smooth production processes.
Develop a comprehensive production plan outlining tasks, timelines, and resources.
Implement efficient production processes to maximize output and minimize downtime.
Coordinate with different departments to ensure smooth flow of materials and information.
Regularly monitor production metrics and adju...
Top trending discussions
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 23 Oct 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
posted on 30 Dec 2020
I applied via Naukri.com and was interviewed in Feb 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 4 interview rounds.
Wide range of aptitude questions including some technical
WAP to find the 2nd maximum number in an array
Sort the array in descending order and return the 2nd element
Iterate through the array and keep track of the maximum and 2nd maximum
Use a priority queue to find the 2nd maximum
Design patterns are reusable solutions to common software design problems.
Design patterns provide a common vocabulary for developers to communicate about solutions to common problems.
They can improve code readability, maintainability, and scalability.
Examples include the Singleton pattern, Factory pattern, and Observer pattern.
SOLID principles are a set of five design principles for writing maintainable and scalable code.
S - Single Responsibility Principle: A class should have only one reason to change.
O - Open/Closed Principle: Software entities should be open for extension but closed for modification.
L - Liskov Substitution Principle: Subtypes should be substitutable for their base types.
I - Interface Segregation Principle: Clients should ...
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
QES backlog is a list of defects identified in the product that need to be addressed. Handling defects involves prioritizing, assigning, fixing, and retesting them.
QES backlog is a list of defects identified during quality assurance testing.
Defects are prioritized based on severity and impact on the product.
Defects are assigned to developers for fixing.
Once fixed, defects are retested to ensure they have been resolved.
...
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
based on 6 interviews
Interview experience
based on 23 reviews
Rating in categories
General Manager Finance
4
salaries
| ₹36 L/yr - ₹48 L/yr |
Assistant Manager
3
salaries
| ₹8.5 L/yr - ₹18 L/yr |
Assistant Manager Operations
3
salaries
| ₹20 L/yr - ₹32 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Saint-Gobain