Upload Button Icon Add office photos

Filter interviews by

Enkebee Infratech India Safety Steward Interview Questions and Answers

Updated 12 Sep 2022

Enkebee Infratech India Safety Steward Interview Experiences

1 interview found

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Mobile interview 

(1 Question)

  • Q1. What is scaffolding Construction safety ,hazards & precautions
  • Ans. 

    Scaffolding is a temporary structure used in construction to support workers and materials.

    • Scaffolding is typically made of metal or wood and is erected around a building or structure.

    • It is used to provide a safe working platform for workers to perform tasks at height.

    • Scaffolding must be designed, erected, and maintained by trained professionals to ensure safety.

    • Hazards associated with scaffolding include falls, collap...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Scaffolding and construction ke bare me acche se jankari le le interview dene se phle

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Roles and responsibilities of safety officer
  • Ans. 

    Safety officers are responsible for ensuring a safe work environment by implementing safety policies, conducting inspections, and providing safety training.

    • Implementing and enforcing safety policies and procedures

    • Conducting regular safety inspections and audits

    • Providing safety training to employees

    • Investigating accidents and incidents to determine root causes

    • Maintaining safety records and documentation

  • Answered by AI
  • Q2. What is hazard, risk assessments ,Hira ?
  • Ans. 

    Hazard, risk assessments, and HIRA refer to the process of identifying potential dangers and evaluating the likelihood of harm occurring.

    • Hazard assessment involves identifying potential sources of harm or danger in the workplace.

    • Risk assessment involves evaluating the likelihood and severity of harm that could result from a hazard.

    • HIRA (Hazard Identification and Risk Assessment) is a systematic process used to identify...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always enhance your skill and knowledge

I applied via Naukri.com and was interviewed in Dec 2017. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Tell me about your self
  • Ans. 

    Experienced safety officer with a background in industrial safety protocols and emergency response procedures.

    • Over 5 years of experience in implementing safety measures in industrial settings

    • Proficient in conducting safety audits and inspections to ensure compliance with regulations

    • Skilled in developing and implementing safety training programs for employees

    • Strong knowledge of emergency response protocols and procedure...

  • Answered by AI
  • Q2. Duties of safety Officer
  • Ans. 

    Safety Officers are responsible for ensuring the safety of employees in the workplace by implementing safety protocols and procedures.

    • Develop and implement safety policies and procedures

    • Conduct regular safety inspections and audits

    • Investigate accidents and incidents to determine root causes

    • Provide safety training to employees

    • Ensure compliance with safety regulations and standards

    • Maintain safety records and reports

  • Answered by AI
  • Q3. Working improvement

Interview Preparation Tips

Round: Test
Experience: Written test

General Tips: Expended
Skills: Self-Awareness
Duration: <1 week

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1.  l&t company establishment date
  • Q2. You have a experience in construction line.
  • Q3. What working to be site
  • Ans. Box culvert, returning wall, desk slab, cross bariyar, tow wall etc.
  • Answered by Suman maity

Interview Preparation Tips

Interview preparation tips for other job seekers - I am try to be small time to complete the work. My site is properly safety with 0 accident. It's projected is my responsibility.
I work to rail project, road project, hospital and metro project working in site.

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Gm 

(3 Questions)

  • Q1. What is your last project and its site design
  • Q2. What is the covered area of project
  • Ans. 

    The covered area of the project is approximately 10,000 square feet.

    • The covered area includes the indoor space of the project.

    • It does not include any outdoor space or open areas.

    • The exact covered area may vary depending on the project.

    • In this particular project, the covered area is approximately 10,000 square feet.

  • Answered by AI
  • Q3. What type of building

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in yourself and done your all duties responsibilities properly and report your senior.

I applied via Company Website and was interviewed before Sep 2019. There were 4 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What is transformer?
  • Ans. 

    A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers are used to increase or decrease the voltage of an alternating current (AC) power supply.

    • They consist of two coils of wire, called the primary and secondary, wrapped around a magnetic core.

    • When an AC current flows through the primary coil, it creates a magnetic field that in...

  • Answered by AI
  • Q2. What is CT, PT?
  • Q3. What are diff type of earthing?
  • Ans. 

    Earthing is the process of connecting electrical equipment to the earth to prevent electric shock.

    • There are several types of earthing, including plate earthing, rod earthing, pipe earthing, and strip earthing.

    • Plate earthing involves burying a copper plate in the earth and connecting it to the electrical equipment.

    • Rod earthing involves driving a copper rod into the earth and connecting it to the electrical equipment.

    • Pip...

  • Answered by AI
  • Q4. What are diff type of circuit breaker?
  • Ans. 

    Circuit breakers are of different types such as thermal, magnetic, hydraulic-magnetic, and residual current devices.

    • Thermal circuit breakers use a bimetallic strip to trip the breaker when it gets too hot.

    • Magnetic circuit breakers use an electromagnet to trip the breaker when it detects an overload.

    • Hydraulic-magnetic circuit breakers combine the features of both thermal and magnetic circuit breakers.

    • Residual current de...

  • Answered by AI
  • Q5. What is star delta starter?
  • Ans. 

    Star delta starter is an electrical motor starting mechanism that reduces the starting current and torque.

    • Used for starting high power motors

    • Consists of three contactors and a timer

    • Initially starts the motor in star configuration and then switches to delta configuration

    • Reduces starting current and torque

    • Commonly used in industrial applications

  • Answered by AI
  • Q6. What is bucholz relay?
  • Ans. 

    Buchholz relay is a protective device used in oil-filled transformers to detect and prevent faults.

    • It is a type of gas actuated relay

    • It is installed in the oil-filled transformer tank

    • It detects the presence of gas or air bubbles in the oil

    • It trips the transformer if a fault is detected

    • It helps to prevent major damage to the transformer

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Remain confident.
Stay positive.
Dont get panic.

I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Accomodation and vechile facilities need .

Interview Preparation Tips

Interview preparation tips for other job seekers - In reliance they not give accommodation and vechile facilities to reach site. Only problem was a big problem. Company good

I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the standards used for plant layout in refineries
  • Ans. 

    Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.

    • Plant layout should prioritize safety and minimize the risk of accidents.

    • Efficiency is also important, with consideration given to the flow of materials and equipment.

    • Regulations and industry standards must be followed, such as those set by OSHA and API.

    • Examples of layout considerations include spacing between equipment,...

  • Answered by AI
  • Q2. What is the frequency on visiting Vendor Shops for expediting
  • Ans. 

    The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.

    • The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.

    • It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...

  • Answered by AI
  • Q3. Have You worked in CDU-VDU unit?
  • Q4. What is DCU?
  • Ans. 

    DCU stands for Dublin City University, a university located in Dublin, Ireland.

    • DCU was established in 1980 and has over 17,000 students.

    • It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.

    • DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.

    • Some not...

  • Answered by AI
  • Q5. Why it is called delayed?
  • Ans. 

    Delayed is called so because it refers to something that is postponed or occurs after the expected time.

    • The term 'delayed' is used to describe situations where there is a time lag or postponement.

    • It implies that something is not happening immediately or as scheduled.

    • Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.

    • For example, a delayed flight refers to ...

  • Answered by AI
  • Q6. What happens at CDU-VDU?

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one technical interview and final negotiation with HR

Skills evaluated in this interview

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.

I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. General and deep questions regarding the subject will be asked as per the position applied and past experience.
Round 3 - HR 

(1 Question)

  • Q1. Regarding salary negotiation the discussion was on. TPL always gives a hike from current salary where no other current contractor in the industry can offer the same. Their package is fixed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well according to your past experiences. Don’t have any loose end in what you have worked on. Be vigilant and have patience while replying becoz mostly interview will be took on Skype during 2019 nowadays using Microsoft teams

Enkebee Infratech India Interview FAQs

How many rounds are there in Enkebee Infratech India Safety Steward interview?
Enkebee Infratech India interview process usually has 2 rounds. The most common rounds in the Enkebee Infratech India interview process are Resume Shortlist.

Tell us how to improve this page.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.5k Interviews
Accenture Interview Questions
3.8
 • 8.2k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Cognizant Interview Questions
3.7
 • 5.6k Interviews
Amazon Interview Questions
4.1
 • 5k Interviews
Capgemini Interview Questions
3.7
 • 4.8k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
Genpact Interview Questions
3.8
 • 3.1k Interviews
View all
Project Manager
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer Civil
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Enkebee Infratech India with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview